Attachment B - Price Schedule.pdf
PDF 253 KB Posted
- Solicitation number
- N6247026R0006
About this file
This document is a Price Schedule (Schedule B) for Project P919 - Phase 1 Bulk Tank Farm Improvements. The price schedule includes multiple line items for different project components, with each item having a quantity, unit, and placeholder for unit and total prices. Key line items include Tank-100 and Tank-200 with pump vaults and leak detection wells, a Tie-In Vault Tank Pad, Additive Injection Building, Decommissioning and Demolition, Cargo Transfer Pipeline (JP-5), Horizontal Directional Drilling, and Supporting Site Work.
The schedule also includes two options: Option 01 for excess contaminated soil removal (15,000 cubic meters) and Option 02 for excess backfill (3,800 cubic meters). The document is structured to allow bidders to fill in unit prices for each line item, with spaces for subtotals and a final total price. The project appears to involve infrastructure improvements for a tank farm, with detailed specifications for each component extending to the 1.5-meter line outside of structures or utilities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE B
PRICE SCHEDULE
Line Item
Description Quantity Unit Unit Price Sub-Total Total Price
1 BASE PRICE: Total Price for the entire work for Project P919 - Phase 1 Bulk Tank Farm Improvements in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_______
1A Tank-100 including Pump Vault, Leak Detection Well Tank Subtotal of Base Price for the entire work for P919 – Tank- 100 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
EA $ ______ $ ________
1B Tank-200 including Pump Vault, Leak Detection Well Tank Subtotal of Base Price for the entire work for P919 – Tank- 200 complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $______ $ ________
1C Tie-In Vault Tank Pad Subtotal of Base Price for the entire work for P919 – Tie-in Vault Tank Pad complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1D Additive Injection Building Subtotal of Base Price for the entire work for P919 – Additive Injection Building complete to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1E Decommissioning and
Demolition Subtotal of Base Price for the entire work for P919 – Decommissioning and any demolition to the 1.5-meter line outside of the structure in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $ ______ $ ________
1F
Cargo Transfer Pipeline
(JP-5)
Subtotal of Base Price for the entire work for P919 – Cargo Transfer Pipeline (JP-5) complete to the 1.5-meter line outside of the utility in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $______ $ ________
1G Horizontal Directional Drilling (JP-5) Subtotal Price for the entire Horizontal Directional Drilling (HDD) infrastructure for P919 scope in accordance with the drawings and specifications, complete to the 1.5-meter (5-foot) line outside of the bore pit, but excluding work provided in another Priced line Item.
315 M $ ______ $ ________
1H Supporting Site Work Subtotal of Base Price for the remainder of entire project site work, outside the facilities, utilities, and structures 1.5-meter line, for all of P919, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $ ______ $ ________
2 Option 01: Excess Contaminated Soil associated with the Project P919 Unit Price for excess removal and disposal of contaminated stockpiled soils for Project P- 919 – Phase 1 Bulk Tank Farm Improvements, complete in accordance with the drawings
15,000 CM $ ______ $ ________ $ ________
TOTAL PRICE FOR CLIN 0001: $_____________
OVERALL TOTAL PRICE FOR ALL CLINS: $_____________
and specifications , but excluding work provided in another line item.
3 Option 02: Excess Backfill for Contaminated Soil associated with Project P-919 Unit Price for provision and compaction of fill in place of removed contaminated soil for Project P-919 – Phase 1 Bulk Tank Farm Improvements, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
3,800 CM $ ______ $ ________ $ ________
File details come from the government source that posted it. Updated .