Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx
DOCX document 20 KB Posted
- Solicitation number
- N4008524R2785
About this file
This is a Construction and Design Experience Project Data Sheet template (Attachment B) that contractors must complete to demonstrate their relevant experience. The form allows contractors to document up to 5 construction projects and 5 design projects, capturing details such as contract numbers, award dates, completion dates, project types, and contract values. The template includes fields for company information (firm name, UEI number, CAGE code), project role (prime/sub/joint venture), contract types (firm-fixed price, design-build, design-bid-build), and requires detailed descriptions of project relevancy and self-performed work.
The form is associated with two Naval Facilities Engineering Command (NAVFAC) projects: the V-47 Breakwater Pier project (N40085-24-R-2545) at Naval Station Norfolk, Virginia, and a Small Business General Construction Multiple Award Construction Contract (MACC) (N40085-24-R-2785) for MCB Camp Lejeune and MCAS Cherry Point. As a template, it does not contain any completed project information or specific requirements for the associated contracts.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| V-47 Breakwater Pier – Seed Project | N40085-24-R-2545 |
| Naval Station Norfolk, Virginia | Attachment E |
| Small Business General Construction MACC | N40085-24-R-2785 |
| MCB Camp Lejeune and MCAS Cherry Point | Attachment B |
Attachment B
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
UEI Number:
Cage Code:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Construction Completion Date (mm/dd/yy):
Design Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build RFP Development |_| Full Plans & Specs |_| Engineering Services |_| Designer of Record |_| Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: scope and complexity elements noted in the RFP, unique features, and challenges). If design-build, include a description of the design effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .