This is a Construction and Design Experience Project Data Sheet template (Attachment B) that contractors must complete to demonstrate their relevant experience. The form allows contractors to document up to 5 construction projects and 5 design projects, capturing details such as contract numbers, award dates, completion dates, project types, and contract values. The template includes fields for company information (firm name, UEI number, CAGE code), project role (prime/sub/joint venture), contract types (firm-fixed price, design-build, design-bid-build), and requires detailed descriptions of project relevancy and self-performed work.

The form is associated with two Naval Facilities Engineering Command (NAVFAC) projects: the V-47 Breakwater Pier project (N40085-24-R-2545) at Naval Station Norfolk, Virginia, and a Small Business General Construction Multiple Award Construction Contract (MACC) (N40085-24-R-2785) for MCB Camp Lejeune and MCAS Cherry Point. As a template, it does not contain any completed project information or specific requirements for the associated contracts.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0008.pdf PDF
N4008524R2785 Amendment 0007.pdf PDF
M101_rev 2.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
E-107.pdf PDF
M601.pdf PDF
VMR- capped.jpg JPG image
T-1.pdf PDF
25 05 11.00.pdf PDF
A-105.pdf PDF
A-501.pdf PDF
E-102.pdf PDF
M501.pdf PDF
N4008524R2785 Amendment 0005.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
Attachment M - Specifications TOC.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment I - Site Visit Information.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V-47 Breakwater Pier – Seed ProjectN40085-24-R-2545
Naval Station Norfolk, VirginiaAttachment E
Small Business General Construction MACCN40085-24-R-2785
MCB Camp Lejeune and MCAS Cherry PointAttachment B

Attachment B

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

UEI Number:

Cage Code:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Construction Completion Date (mm/dd/yy):

Design Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build RFP Development |_| Full Plans & Specs |_| Engineering Services |_| Designer of Record |_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: scope and complexity elements noted in the RFP, unique features, and challenges). If design-build, include a description of the design effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information: