About this file

This document provides supplemental architectural design standards for Little Rock Air Force Base. Key requirements include installing corner guards in all public areas; ensuring all exposed metals are painted; providing concrete splash blocks and downspout boots at exterior downspouts; installing prefinished metal louvers for ventilation; using steel pipe bollards where required and ensuring all building structures are wrapped to prevent bird and insect nesting; specifying ceiling tiles, insulation, cabinetry, flooring, wall covering and signage materials; and outlining finish standards for bathrooms, public restrooms, laundry rooms and masonry. The related federal contract opportunity is a multiple award construction contract for the 19th Civil Engineer Squadron at Little Rock Air Force Base to perform sustainment, restoration and modernization projects including new construction, repair, utilities and specialty construction. Task orders will specify individual project details.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR, newest first.
File Type Posted
Amend 05 -Solicitation Amendment - FA446021R00090005.pdf PDF
Amend 05 -Attachment 38 Questions and Answers after 3rd Site visit.pdf PDF
Amend 05 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 05 -Attachment 13 - Statement of Work for MACC Rev 1.pdf PDF
Amend 05 -Solicitation Amendment FA446021R00090005 SF 30.pdf PDF
Corrected Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Solicitation Amendment FA446021R00090004 SF 30.pdf PDF
Amend 04 -Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Amend 04 -Attachment 37 - 2nd Site Visit Sign-in-Sheet 6-23-21.pdf PDF
Amend 04 -Attachment 35 - Questions and Answers - 1st-2nd Site Visits.pdf PDF
Amend 04 -Attachment 34 - PPI Tool Download Instructions Updated.pdf PDF
Solicitation Amendment - FA446021R00090004.pdf PDF
Amend 04 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Solicitation Amendment FA446021R00090003 SF 30.pdf PDF
Updated Attachment 30 - Past Performance Package.docx DOCX document
Solicitation Amendment FA446021R00090002 SF 30.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 Seed Project Amend 1.zip ZIP file
Amend 0001-Solicitation - FA446021R0009 Rel.pdf PDF
Attachment 28 - Financial Institution Reference Sheet.pdf PDF
Attachment 23 - 27 20 00 COMPUTER-TELEPHONE SYSTEMS May 2010.pdf PDF
Attachment 12 - Scheduled Government Furnished Property.pdf PDF
Attachment 1 - EMIS Instruction Guide.pdf PDF
Attachment 22 - 26 05 04 RACEWAYS.pdf PDF
Attachment 25 - 28 31 00 FIRE DETECTION AND ALARM SYSTEMS.pdf PDF
Attachment 24 - 27 51 16 BUILDING MASS NOTIFICATION SYSTEM.pdf PDF
Attachment 19 - 09 06 89 TYPICAL FINISH SCHEDULE.pdf PDF
Attachment 17 - 01 57 22 TREE PRESERVATION.pdf PDF
Attachment 14 - ETL 07-04 AIR FORCE CARPET STANDARD.pdf PDF
Attachment 13 - Statement of Work for MACC.pdf PDF
Attachment 11 - LRAFB Arch Design Guide Supplement 6 Aug 20.pdf PDF
Attachment 10 - LRAFB Arch Compatibility Guide.pdf PDF
Attachment 8 - LRAFB Telecommunications Systems Design.pdf PDF
Attachment 3 - CandD Report.pdf PDF
Attachment 2 - Environmental MOA.pdf PDF
Attachment 33- SubKTR_Consent_Form.pdf PDF
Attachment 21 - 10 44 16 FIRE EXTINGUISHERS - CABINETS.pdf PDF
Attachment 15 - UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.pdf PDF
Attachment 6 - LRAFB Electrical Design Standards.pdf PDF
Attachment 5 - LRAFB Information.pdf PDF
Attachment 4 - LRAFB Civil Design Criteria.pdf PDF
Released Solicitation - FA446021R0009.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 29 - Maintainability Review Checklist FORM - Design Team.docx DOCX document
Attachment 27 - EZSource PresentPast Performance Relevancy Table .docx DOCX document
Attachment 26 - Design Review Checklist including constructability review 2013 07 30.docx DOCX document
Attachment 20 - 10 14 02 INTERIOR SIGNAGE.pdf PDF
Attachment 18 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 16 - 00 00 02 LRAFB SPECIFICATIONS FORMAT STANDARD.pdf PDF
Attachment 7 - LRAFB Mechanical Design Criteria.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Little Rock Air Force Base

Architectural Design Guide Supplement 22 January 2020

This document does not take the place of the Little Rock Air Force Base Architectural Design Guide, but is intended as a supplement to provide additional insight to the Architectural Requirements and standards here at Little Rock Air Force Base. Any questions concerning this document may be addressed to the Little Rock Air Force Base Architect.

• All drawings shall include a graphic scale.

• All plans shall include a “North” arrow for orientation.

• Install corner guards at all outside corners in all public areas. Corner guards shall be 2” x 2” on extruded aluminum bracket and shall extend from floor to ceiling similar. Corner Guards shall be Koroguard G100/G10E or approved equal.

• All exposed metals shall be painted. Red Iron primer is not a finished material and is not acceptable left exposed.

• All exterior downspouts shall have concrete splash blocks. Splash blocks shall meet LRAFB Standards. The minimum shall be 185 pound, 5” x 12” x 60” ” concrete splash blocks at each downspout. Splash block may also be fiber reinforced 6” x 24” x 60”cast-in-place 3500 psi concrete pads.

• All exterior downspouts shall have a cast iron downspout boots/shoes to protect lower portions of each down spout from grounds maintenance high speed mower impacts. Minimum length shall be 24 inches.

• Provide prefinished metal louvers (same color as siding and/or roof) for ventilation systems sized and constructed to meet exhaust needs. Louvers shall have bird screen and insect netting.

• Where pipe bollards are required, provide six inch diameter steel pipe bollards filled with concrete. If at a door location, provide bollards on each side of door, both inside and out.

• A common problem here at LRAFB is bird nesting and insect control. Open Structures, bar joist, I beams, lintels, exposed structure, etc. is not allowed. All building structure must be wrapped in the finish materials of the proposed structure without allowing any protruding ledges that would promote bird nesting. Care should be taken to ensure that all gaps in materials are properly flashed or sealed to prevent nesting areas for insects and or birds.

• All new ceiling tile shall be fine fissured, 2’ x 2’ panels, with a tegular edge. All field cuts shall be beveled and field painted to match per manufactures instructions

• Cellulose/newspaper type insulation and loose fill type insulation is not acceptable.

• Installing insulation on suspended ceiling tile and grid is not acceptable.

• Insulation is not a finish material – Insulation is not to be left exposed in occupied spaces. Below is an example of an unacceptable practice.

• Provide all necessary blocking and backing for window blinds, curtains, toilet accessories, towel bars, robe hooks, mirrors, etc.

• Provide a knock down finish, primer coat and minimum of two paint coats for areas to receive painting.

• Provide a GA 214 level five finish for all areas to receive vinyl wall coverings.

• All Vinyl wall covering shall be breathable and or micro-vented to prevent the buildup of mold.

Use only adhesives that do not promote mold growth.

• Provide mechanically attached room number signage and directional signage. Room number signage shall have room number and blank window for slide-in name and unit symbol. Provide and install building signage system to include directional signage and directories.

• All carpeting shall meet or exceed the requirements of the USAF Unaccompanied Housing Design Guide, the Air Force Carpet Handbook, ETL 07-04 and UFC 3-120-10. Carpeting shall be at a minimum heavy traffic/heavy wear rated carpeting. Carpeting shall also have a geometric pattern and shall be a branded fiber. Density shall be no less than 7000 average pile density. All areas with carpeting shall also have 4 inch high seamed edge carpeted wall base from matching roll stock.

• Vinyl base is acceptable in areas without carpet or ceramic tile. Vinyl base shall be continuous roll stock, not 4’ lengths and shall be installed in the longest lengths possible. Piecemealing small lengths is not acceptable.

• Base shall match floor unless noted otherwise. Examples: carpet floor = carpet base, VCT floor = vinyl or rubber base, CT floor = CT base, Porcelain tile = Porcelain base, Epoxy floor = epoxy base. Areas that require floors to contain spills and liquids shall have coved base.

• Provide base on all gyp board wall construction, to protect bottom of wall from damage.

• Carpet tile is the basis for design. Broadloom shall only be installed in areas specified by the

Statement of Work. All carpet tile shall be of the non-glue down variety. Carpe tile manufacturer’s standard method of installation shall include a non-glue down method. Using a different manufacturer’s installation method for another manufacturer’s tile is not acceptable.

Carpet and installation method shall be by the same manufacturer.

• Provide an approximately 5/16” thick, non-skid abrasive strip, extruded aluminum stair treads, nosing and riser system. Treads, nosing’s, risers and tile, and base in matching color, pattern, and style for stairwells for a complete and uniform system. New wall base shall not be vinyl or rubber wall base in stairwells.

• Provide thin set, 6” x 6” or larger, non-skid porcelain ceramic floor tile on floor of all bathrooms, in all laundry rooms, kitchen area, lobby area, vestibules, and public restrooms and at water fountain alcove, in color groups 2 & 3.

• Provide and install 6” high matching porcelain ceramic tile wall base in all areas with floor tile.

• Provide 6” x 6” or 6” x 8” glazed wall tile on concrete board on all wet walls from floor to ceiling.

This is a minimum size only. Larger tiles may be used where appropriate based on room size.

• When laying out tile, layout of tile shall start from the center of the room to prevent small pieces of tile at the wall.

• All cuts in tile shall for utilities shall be of minimum size. Covering overlarge openings with plates are not acceptable. Escutcheons around pipes and cover plates for devices shall be of matching materials. Lack of coordination between subcontractors will not be excuse for acceptance of poor work. Below is an example of an unacceptable practice.

• Provide 2” – 4” wide extruded aluminum transition thresholds at all changes in floor coverings.

Transition thresholds shall be mechanically and adhesively attached. Vinyl and rubber transition strips are not acceptable.

• All new exterior windows, doors, and storefronts shall meet the requirements of UFC 4-010-01 Department of Defense Minimum Antiterrorism Standards for Buildings. This includes transferring the blast loads to the building structure as needed so the window, frame, and wall remain intact in case of an explosion.

• When re-using existing door frames - Provide surface preparation, welding, grinding of all steel door frames and install filler, primer and paint coats to restore all steel door frames to a like new appearance and function.

• If renovating a facility and planning to re-use the existing frames, remove all wood door frames and replace with 16 gauge welded corner steel door frames, grouted full with masonry or concrete and mechanically anchored to existing structure. Wood door frames are not acceptable and shall not be allowed to remain.

• All new wood doors shall be bonded staved solid core birch face factory finished stain grade doors.

• All new metal doors shall be 16 Gauge hot dipped galvanized and factory primed hollow metal doors. Paint as required for new finish. See Section 08 11 13 STEEL DOOR AND FRAMES.

• Paint all door frames. This includes all edges, sides, and top.

• Provide and install 6” high white reflective vinyl lettering above the kick plate of all fire exit doors reading “FIRE EXIT”.

• All new doors, interior or exterior, shall at a minimum be a 3070 door, unless called out different in SOW.

• Ensure all interior doors include the following hardware and are the same/matching throughout.

o Bonded staved solid core birch face factory finished stain grade doors. Provide rating as required.

o 5” x 20” lites where existing and/or required.

o Welded corner steel frames with silencers.

o Brushed aluminum or stainless steel kick plates.

o Ball bearing hinges.

o Curved return lever handle locksets.

o Locksets shall match the function of the room. For instance, Classroom locksets shall be installed on Classroom doors and Office locksets shall be installed on Office doors. Any variation of this shall be done only with coordination through the LRAFB Architect during the design process.

o Keyed Deadbolts on all doors with locksets.

o In dormitories that share a bath between occupant rooms, a deadbolt privacy lock and a Patio Lockset is required for the bathroom doors to prevent someone from becoming entrapped in the bathroom.

o Card Key Access System that will work with the existing CAC Card system, with manual override on occupant rooms only. Where required.

o Wall stops.

o Adjustable force door closers.

o ICU peep viewers with covers on occupant rooms only. Where required.

o Touch-Bar panic hardware on all egress doors.

o See also Section 08 71 00 Door Hardware.

• All exterior doors shall be protected from the weather with an overhang or canopy that provides adequate protection from the weather.

• Provide a concrete slab at all exterior door locations.

• Provide an exterior light at all exterior door locations.

• Provide solid surface Corian type window sills and stools at all windows. Solid surface material shall be burn resistant, and shall have geometric and speckled patterns to choose from.

• Provide and install 2” deep solid plastic commercial vertical blinds at all windows.

• CABINETRY

• Provide and install a minimum 20 gauge metal stud and 5/8” gypsum board soffit above wall cabinets. Soffit shall extend above the drop ceiling.

• Provide solid stain grade wood cabinetry. All base cabinets shall have solid wood stain grade toe-kick base. 3/4” furniture grade plywood is acceptable for drawer, sides, bottoms, backs and for backs of cabinets and adjustable shelving. MDF, OSB, particle board and other similar products are not acceptable for use in cabinetry. Concealed hinges, ball bearing slides and non-snagging pulls shall be used for all hardware. Stain grade cabinetry grain and color shall match grain and color of birch face doors.

• Provide integral coved 4” backsplash and 2” bull nose solid surface countertops with integral lavatory sinks at vanities and double bowl deep stainless steel sinks at all kitchen cabinetry.

Solid surface material shall be burn resistant, and shall have geometric, speckled and marbleized patterns to choose from.

• BATHROOMS

• Provide shower pan liner in all showers.

• Provide pre-cast terrazzo shower pans.

• Provide 5/8” concrete board (durock) on all walls, shower ceiling and floor and sealed with

Laticrete 9235 waterproofing membrane, (“Red Guard”, “green board”, “blue board” and “moisture resistant board” are not acceptable products).

• Provide thin-set 6” x 6”, 6” x 8” (minimum size) glazed ceramic wall tile on walls in color group 2 & 3 full height in showers and bathrooms. Shower ceiling to be ceramic tile with shower light.

• Provide new commercial grade towel bars, toilet tissue dispensers, robe hooks, wash cloth holders, soap dish shelf in showers, mirrors, et cetera.

• Provide temperature adjustable/control mixer valves in each shower. Provide hand held shower, slide bar and hose assembly in each shower. Plastic parts shall be limited. Majority of all parts shall be chrome plated bronze or brass.

• PUBLIC RESTROOMS

• Minimum requirements include toilet with seat, lavatory, stainless steel mirror (one per lavatory), toilet paper dispenser (one per toilet) that allows for an 9” jumbo roll with reserve capacity, Foam soap dispenser (one per lavatory unless there are two in a room, then one dispenser per two lavatories is acceptable), a roll type paper towel dispenser (one per lavatory unless there are two in a room, then one dispenser per two lavatories is acceptable), and a stainless steel trash disposal unit. Provide ceramic tile floor and walls with a lay-in ceiling. Wall tile on wet wall shall be on concrete board.

• Provide and install floor drain(s) near toilet fixtures and urinals in case of overflows.

• All toilet partitions shall be floor mounted, overhead braced, solid plastic toilet partitions with an integral continuous stop and hinge as manufactured by Hadrian Toilet Partitions, ARCH Series, or Eclipse Partitions Privacy by Design.

• All toilet paper dispensers, paper towel dispensers, and foam soap dispensers shall accept the supplies provided by the Base Custodial Contract unless specifically changed by the User. The A/E Firm shall confirm who supplies the products with the User to ensure during the design process.

o San Jamar Simplicity or Georgia Pacific - Mechanical Hands Free Dispenser.

o Foam Clean Foam Soap Dispensers.

o Bobrick B-2892 ClassicSeries® - Surface-Mounted Twin Jumbo-Roll Toilet Tissue

Dispenser (2 – 9” rolls with 3” cores).

• Toilet accessories/Dispensers shall be installed correctly and within acceptable limits. Non-compliance will result in replacement of damaged panels.

http://www.bobrick.com/washroomaccessories/Pages/Products.aspx?Series%3dClassicSeries%c2%ae

• LAUNDRY ROOMS – Where required.

• Provide sound isolation between laundry rooms and occupant rooms. Provide washer and dryer connections in pre-manufactured housings with no exposed plumbing.

• Provide and install floor drain(s) near washers and ice machine for spill containment.

• Provide curbed corner floor sink with hot and cold water. Provide mop holders above for dripping into sink.

• Provide glazed ceramic wall tile on concrete board on all wet walls, floor to ceiling.

• In masonry construction.

o In all occupied public areas, all exterior corners are to be bull nosed block.

o All door openings to be bull nosed block.

o All colored masonry block or brick shall have integrally colored mortar, unless noted otherwise.

• All transformers, panel boxes, conduits, and electrical equipment shall be painted “Satin

Bronzetone” from Sherwin Williams ProMar Bronzetone Enamel Custom Colors, or “SW 7542 “Naturel” depending upon location. Coordinate with LRAFB Architect for correct color selection.

• All exterior HVAC units, condensers, etc. shall be factory finished “Satin Bronzetone” from Sherwin Williams ProMar Bronzetone Enamel Custom Colors, or “SW 7542 “Naturel” depending upon location. Coordinate with LRAFB Architect for correct color selection.

• All exterior HVAC ducts shall be painted “Satin Bronzetone” from Sherwin Williams ProMar Bronzetone Enamel Custom Colors, or “SW 7542 “Naturel” depending upon location. Coordinate with LRAFB Architect for correct color selection.

• When any excavation takes place (trenches, utilities, etc.) ground surface is to be restored to better than original condition. Solid sod all disturbed soil and ensure that original elevations and slopes are maintained.

• When placing maintenance slabs next to buildings, keep in mind grounds maintenance. If the slab does not allow room for a riding mower between the maintenance slab and building (less than 6’), or has surface mounted conduits and lines that connect it to the facility, extend the slab up to the edge of the facility.

• All exterior Electrical boxes and exterior conduits shall be painted “Satin Bronzetone” from Sherwin Williams ProMar Bronzetone Enamel Custom Colors, or “SW 7542 “Naturel” depending upon location. Coordinate with LRAFB Architect for correct color selection.

• All roof top penetrations shall be painted to match the roof of the facility. Typically, this is either “Satin Bronzetone” from Sherwin Williams ProMar Bronzetone Enamel Custom Colors, or “SW 7542 “Naturel” depending upon location. Coordinate with LRAFB Architect for correct color selection.

• When using the description “Stain Grade”, it refers to the quality of the materials and the actual final finish of the materials which shall include a stained finish. Coordinate final color selection with LRAFB Architect for approval.

• When interior finishes are being replaced, this shall also include counter tops and millwork finish.