This document provides standards for telecommunications systems design at Little Rock Air Force Base. It specifies requirements for outside plant and inside plant cabling projects. Standards are outlined for materials, submittals including pre-construction drawings and as-built drawings, communications closets, telephone terminal backboards, telecommunications outlets, terminations, identification labels, equipment racks, environmental requirements, the horizontal distribution system, system equipment, communications raceways and cable trays, grounding, the exterior route including service entrance and manholes/ducts, and communications distribution system testing. A standard communications room wiring diagram is also included as an attachment. Testing requirements are defined for unshielded twisted-pair cables, copper cables, and fiber optic cables. The contractor must notify the base communications squadron 14 days before acceptance tests and provide test reports within 14 days of completion.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR, newest first.
File Type Posted
Amend 05 -Solicitation Amendment - FA446021R00090005.pdf PDF
Amend 05 -Attachment 38 Questions and Answers after 3rd Site visit.pdf PDF
Amend 05 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 05 -Attachment 13 - Statement of Work for MACC Rev 1.pdf PDF
Amend 05 -Updated Attachment 30 - Past Performance Package..docx DOCX document
Solicitation Amendment FA446021R00090004 SF 30.pdf PDF
Amend 04 -Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Amend 04 -Attachment 37 - 2nd Site Visit Sign-in-Sheet 6-23-21.pdf PDF
Solicitation Amendment - FA446021R00090004.pdf PDF
Amend 04 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Solicitation Amendment FA446021R00090003 SF 30.pdf PDF
Updated Attachment 30 - Past Performance Package.docx DOCX document
Attachment 34 - PPI Tool Download Instructions.pdf PDF
Solicitation Amendment FA446021R00090002 SF 30.pdf PDF
Solicitation Amendment FA446021R00090001 SF 30.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 Seed Project Amend 1.zip ZIP file
Amend 0001-Solicitation - FA446021R0009 Rel.pdf PDF
Attachment 28 - Financial Institution Reference Sheet.pdf PDF
Attachment 23 - 27 20 00 COMPUTER-TELEPHONE SYSTEMS May 2010.pdf PDF
Attachment 12 - Scheduled Government Furnished Property.pdf PDF
Attachment 1 - EMIS Instruction Guide.pdf PDF
Attachment 22 - 26 05 04 RACEWAYS.pdf PDF
Attachment 25 - 28 31 00 FIRE DETECTION AND ALARM SYSTEMS.pdf PDF
Attachment 24 - 27 51 16 BUILDING MASS NOTIFICATION SYSTEM.pdf PDF
Attachment 19 - 09 06 89 TYPICAL FINISH SCHEDULE.pdf PDF
Attachment 17 - 01 57 22 TREE PRESERVATION.pdf PDF
Attachment 14 - ETL 07-04 AIR FORCE CARPET STANDARD.pdf PDF
Attachment 13 - Statement of Work for MACC.pdf PDF
Attachment 11 - LRAFB Arch Design Guide Supplement 6 Aug 20.pdf PDF
Attachment 10 - LRAFB Arch Compatibility Guide.pdf PDF
Attachment 3 - CandD Report.pdf PDF
Attachment 2 - Environmental MOA.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 29 - Maintainability Review Checklist FORM - Design Team.docx DOCX document
Attachment 27 - EZSource PresentPast Performance Relevancy Table .docx DOCX document
Attachment 26 - Design Review Checklist including constructability review 2013 07 30.docx DOCX document
Attachment 20 - 10 14 02 INTERIOR SIGNAGE.pdf PDF
Attachment 18 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 16 - 00 00 02 LRAFB SPECIFICATIONS FORMAT STANDARD.pdf PDF
Attachment 9 - LRAFB Architectural Design Guide Supplement.pdf PDF
Attachment 7 - LRAFB Mechanical Design Criteria.pdf PDF
Attachment 30 - Past Performance Package.docx DOCX document
Attachment 33- SubKTR_Consent_Form.pdf PDF
Attachment 21 - 10 44 16 FIRE EXTINGUISHERS - CABINETS.pdf PDF
Attachment 15 - UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.pdf PDF
Attachment 6 - LRAFB Electrical Design Standards.pdf PDF
Attachment 5 - LRAFB Information.pdf PDF
Attachment 4 - LRAFB Civil Design Criteria.pdf PDF
Released Solicitation - FA446021R0009.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 CS / SCXP Plans & Implementation Flight 1 Jan 2020

TELECOMMUNICATIONS SYSTEMS

DESIGN STANDARDS

19 Communications Squadron Little Rock Air Force Base, AR

INTRODUCTION:

This document provides direction to facilitate proper planning on the installation standards required for all Outside Plant (OSP) cabling and Inside Plant (ISP) cabling projects installed at Little Rock Air Force Base, AR.

The intent of this document is to ensure all OSP and ISP cabling projects installed on Little Rock AFB as part of any MILCON, Renovation, SABER, etc., meets commercial industry and 19 CS standards for its intended use. In the event direction for a unique installation is not addressed in this document, please coordinate with 19 CS/SCXP for guidance prior to commencing work. Under special circumstances, 19 CS guidance may deviate from industry standard, upon this occurrence, 19 CS direction will supersede the commercial industry standard for the request. For items not addressed in this document, please refer to Telecommunications Guides listed under the Reference Heading.

1.0 REFERENCE:

1.1 UFGS-27 10 00 Unified Facilities Guide Specifications, UFC 03-580-01 Telecommunications Building Cabling Systems Planning and Design, Chapters 1 and 2.

2.0 GENERAL:

2.1 The communications distribution system shall consist of inside-plant horizontal and outside-plant cables and connecting hardware to transport telephone and data (including LAN) signals between equipment in dispersed buildings as well as equipment within a building.

2.2 All work shall be accomplished in accordance with applicable government and commercial standards. Pre-wiring designs will consider present and future planned requirements while adhering to a flexible design layout that compliments ease of installation and management of cable routing and connections.

3.0 MATERIALS AND EQUIPMENT:

3.1 Where materials or equipment are specified to conform, are constructed or tested to meet specific requirements, certification that the items provided conforming to such requirements.

Certification by a nationally recognized testing laboratory that a representative sample has been tested to meet the requirements, or a published catalog specification statement to the effect that the item meets the referenced standard, will be acceptable as evidence that the item conforms. Compliance with these requirements does not relieve the Contractor from compliance with other requirements of the specifications. All existing telephone & LAN/Data outlets, data patch panels or other communications equipment scheduled for demolition, shall be disposed of by the contractor.

4.0 SUBMITTALS:

4.1 PRE-CONSTRUCTION DRAWINGS:

4.1.1 Detail drawings including a complete list of equipment and material, e.g., wiring and schematic diagrams. Drawings shall include vertical riser diagrams, equipment rack details, and elevation drawings of telecommunications closet walls, outlet faceplate details for all outlet configurations, sizes and types of all cables, conduits, and cable trays. Drawings shall show proposed layout and anchorage of equipment and associated items, and equipment relationship to other parts of the work including clearance for maintenance and operation.

Submit manufacturer’s product specifications and installation instructions for each identification material and device required. Include data substantiating that materials comply with requirements.

4.2 POST-CONSTRUCTION DRAWINGS (AS-BUILT DRAWINGS):

4.2.1 COMM as-builts shall be submitted to 19 CS independent of the project as-builts. The COMM as-builts shall be detailed drawings that follow the guidelines provided in this contract. Extraneous information of other disciplines shall NOT be accepted on the COMM as-built drawings. The information on the COMM as-built drawings shall pertain to COMM specifics, further the understanding of the COMM drawings, and/or add information deemed useful in understanding where and what is installed/modified in this project as it relates to

COMM.

4.2.2 As-built drawings for the installed outside plant wiring system infrastructure are limited to the exterior COMM infrastructure, manholes, hand holes, duct banks, etc., involved with this project.

4.2.3 As-built drawings for the inside plant (rack elevation drawings) shall include diagrams of the solution, identifying specific cards in a chassis/shelf, and bay face layout drawings. In addition, contractor shall provide floor plans; power, grounding and data circuit diagrams;

cut sheets and cable running lists for all equipment installed. Outside/inside plant as-built drawings shall be submitted in Visio format. Copy of as-built drawings will be provided to 19 CS within 21 days after completion of installation.

5.0 COMMUNICATIONS CLOSETS:

5.1 The Telecommunications Room (TR) serves as the entrance facility for all incoming communications ducts and service and as the location for communication and information infrastructure to include: telecommunications equipment, cable terminations, cross-connect cabling and network switches.

5.2 Location, Sizing, and Details: The TR will be located on the first floor along an exterior wall. It must be a dedicated space not shared with other functions (i.e. building electrical or mechanical utilities). As a minimum, the TR should have 19-millimeter (0.75-inch) plywood telephone terminal backboard (TTB) (19 CS reserves the right to request additional TTB’s if necessary). Provide 0.91-meter wide by 2.03-meter long (36-inch wide by 80-inch long) double-leaf (no center support) doors fitted with a lock to control access to the TR from inside the building. Floors, walls, and ceilings must be treated to eliminate dust. Finishes must be light in color to enhance room lighting. Do not locate the TR near other building utility rooms or generators that may cause electromagnetic interference with TR equipment or where moisture, gases, dust, or other contaminants may enter. The TR size for DoD buildings is 10 feet x 8 feet (3m x 2.4m). Generally, the TR should be sized to approximately

1.1 percent of the area it serves. For more specific design guidance refer to UFC 3-58-01, para 2-4.2.2.

5.3 Cross-connect closets (X-connect) will be provided as required. Cross-connect closet’s size and location will be coordinated with 19 CS/SCXP during project design reviews.

6.0 TELEPHONE TERMINAL BACKBOARD (TTB):

6.1 The contractor shall provide and install one new TTB, unless otherwise directed by 19 CS. The backboards shall be 4-‘0” by 8’-0”, mounted to the wall at all corners with minimum 3/8” hardware, and constructed of ¾” A-C plywood -- finished side facing outward, with two coatings on both sides of fire retardant paint. The left half of the TTB shall be used for mounting the telephone feeder cable protection units. The right half of the TTB will be used for mounting and terminating of I/W telephone cables, terminal blocks, & patch panels.

7.0 TELECOMMUNICATIONS (Telephone & LAN/Data) OUTLETS:

7.1 Quad outlets will be installed at each telephone & LAN/data location unless otherwise specified by 19 CS. Telecommunications outlets shall be Category 6, RJ45 8-pin voice and data modular outlet assemblies housed in a quad-hole, flush wall-mount faceplate. All terminations shall be done according to TIA/EIA-568-B. Wall-mount telephone outlets (for wall-mounted telephone sets) shall be 8-pin modular outlet assemblies (type RJ-45 modular wall-telephone jack) mounted in a simplex housing as indicated on the drawings. Each modular outlet shall accept a 4-pair Category 6 cable (8-conductors) and each modular outlet assembly shall be numbered for easy identification and location. All outlets will be wired directly to the Common User Patch Panel located in the

Telecommunications Room serving the floor that the outlets are located on. However, 19 CS reserves the right, under special situations, to request specific jack outlets be wired to 110 telephone voice block and not to common user patch panel.

7.2 Telecommunications (Telephone & LAN/Data) outlets shall be installed in the approximate positions indicated on the drawings. All outlets shall be mounted 18” plus or minus 2” above the finished floor (AFF) or 6” plus or minus 2” for counter tops. All wall telephone outlets shall be mounted 54” plus or minus 2” AFF for standard telephones, and 34” AFF for handicap access telephones.

8.0 TERMINATIONS:

8.1 All data cables shall be terminated and marked at the equipment racks and wall outlets.

Outlets shall be as manufactured by “AMP” or approved equal. Patch panels will be provided by the contractor and shall have capacity for 15% more cables to be added in the future. Premise and demark wiring shall be Category 6; each premise cable shall be terminated on an individual RJ45 wall jack and a patch panel 110 block type standard within the 19” equipment rack in the communications room. Demark cables shall be terminated on a patch panel 110 block type standard within the 19” rack and 110 punch down block fastened to the plywood backboard located close to the building entrance terminal.

8.2 All CAT6 RJ45 terminations are to be ivory along with wall face plates to match other electrical plates in the room. If the architect calls for another faceplate color then the RJ45 outlet jack shall match the face plate color. Jacks in floor boxes shall be ivory. All cables shall be blue.

8.3 All CAT6 cables are to be terminated as data cables whether the face plate is marked for phone or data. Termination shall be IAW TIA/EIA-568-B.

8.4 Terminate all Fiber Optic (FO) work area cables in dual 568SC connectors. The default choice for the FO outlet/connector shall be TIA/EIA “SC” type (568SC). Other type connectors (small-form-factor), e.g., ST, LC, MT-RJ, VF-45, etc., may be substituted as required by the user. Small form factor connectors (available from several manufacturers) offer a potential for significant installation cost reduction. Any type of fiber connector used shall meet the performance requirements specified within Annex A of TIA/EIA-568-C.3

9.0 ID LABELS:

9.1 The Contractor shall provide identification labels at both ends of communications cable.

Outlets and LAN rack jacks shall be clearly labeled with same identification as the cable.

Label identifier for circuits shall start with the room number. If there is more than one outlet in a room then add a number with a suffix for each jack; e.g., Rm. 101-1, A, B, C, D etc.

Jacks shall be numbered sequentially clockwise around the perimeter of the room starting at the outlet to the left of the door. Outlets in the middle of the room shall be numbered sequentially in a logical pattern.

9.2 All outlet jacks shall be ivory in color or match the Architect specified wall plate color for all other electrical device wall plates in the room. All patch panels shall be labeled with corresponding jacks and wall plate numbers where distant end of cable terminates.

10.0 EQUIPMENT RACKS:

10.1 Equipment racks shall be floor mounted; vertical & horizontal cable management devices shall be integral to the cabinets. One 19” rack mounted power strip with a minimum six outlets with surge protection fed from dedicated circuit in the TR panel, a ground bus bar with a #6 AWG ground cable connected to the master ground bus bar shall be mounted within the cabinets. Equipment racks shall mount equipment 19” wide and shall be 72” high and depth as shown on drawings. If mounting requirements for oversize equipment are anticipated, 23” wide may be substituted. Wall mounted racks may be utilized in small buildings or for small systems. All racks must be installed with vertical and horizontal wire management trays.

10.2 Exact rack placement will be specified by the 19 Communications Squadron. Racks shall be bolted to the true floor at all corners with minimum 3/8” hardware and to any adjacent racks. Racks must be positioned to allow a minimum 36” of clearance in front and behind the racks. Racks must be placed to allow complete opening of other fixed area enclosure doors or covers.

10.3 A dedicated 120 VAC; 20-amp circuit (unless otherwise specified) will be mounted in each rack, running the circuit in conduit. Increase these minimum requirements as necessary to meet equipment loads. Both vertical and horizontal cable management rings and panels shall be installed in the racks as indicated on the drawings.

10.4 Category 6 copper patch panels shall be mounted in equipment racks with sufficient modular jacks to accommodate the installed cable plant plus fifteen percent (15%) spares.

Cable guides shall be provided above, below and between each panel.

10.5 SC fiber optic patch panels shall be mounted in equipment racks with sufficient ports to accommodate the installed cable plant. A slack loop of 36” of fiber shall be provided within each panel. The outer jacket of each cable entering a patch panel shall be secured to the panel to prevent movement of the fibers within the panel, using clamps or brackets specifically manufactured for that purpose.

11.0 ENVIRONMENTAL REQUIREMENTS:

11.1 Provide heating, cooling, and fresh air appropriate for the equipment housed. Maintain a positive pressure inside the room to reduce the entry of dust. Normal operating ranges should be as locally established for employee comfort (typically between 20 to 26 °C [68 to 78 °F]). There are no special relative humidity requirements. Provide a minimum of 538 lux (50 foot-candles) of illumination measured 1 meter (39 inches) above the finished floor.

12.0 HORIZONTAL DISTRIBUTION SYSTEM:

12.1 Interior wiring shall be installed in raceways, cable trays, and boxes as specified and terminated at station locations indicated. All cables between the same points shall be run over the same path.

12.2 Cables and wiring shall be installed and terminated at all station locations as indicated on project drawings. Wiring shall take the form of a “Universal Wiring Plan” where horizontal cables are wired directly, home run fashion, from a distribution point to the appropriate modular jack plate, jack assembly, or floor jack to support the use of single-line type sets and electronic sets. Each individual cable run shall be continuous and uninterrupted and shall have no bridge taps, branches, splices or connections at any point. Exterior jacket of data cables shall be blue.

12.3 Cables shall be installed in accordance with applicable fire codes, the manufacturer’s recommendations and the requirements. There shall be no kinks, sharp bends or deformation in the installed cable. Any bends in the cable shall meet the recommendations of the cable manufacturer. The cable shall be installed in a manner to prevent crushing, stretching, abrasion, puncture, and other mechanical damage. Utilize attachments, fastenings, and supports in conformance with the cable manufacturer’s recommendations for the type and size cable, as installed, and consistent with the installed environment.

12.4 Vertical cable runs in duct or on ladder shall be tied with plastic straps or lacing twine at the top of the run and at least every 36” to prevent cable strain. All cables and cross-connects shall be neatly strapped, dressed and adequately supported. Provide cable clamps, strain relief devices, and ties as required to maintain the professional appearance of the installation and as recommended by the manufacturer. Where required, strain relief devices and ties shall be classified low smoke and low fume for use in air pleonasm in accordance with NFPA 70.

12.5 Cables shall be installed in the conduits and cable trays provided and as indicated on the drawings. Cable shall not be installed outside of these wireways, including, but not limited to, freely suspended without support, on decks or walking surfaces, on suspended ceiling grid work, or on the work of other trades which are not specifically designated as wireways.

12.6 Within the telecommunications closets, the cable shall be supported at all times by cable trays and cable ladders, down to the telecommunications/equipment racks or backboard as indicated on the drawings. Within the telecommunications rack or on the backboard, cable shall be supported by cable management rings and panels.

12.7 Contractor shall verify that the length of cable runs are no longer than 300’. Station cables shall not be installed in the same cable tray, utility pole compartment or floor trench compartment with AC power cables. Station cables not installed in conduit or wireways shall be properly secured and neat in appearance.

12.8 Cables which interconnect interior distribution centers shall conform to ICEA S-80-576.

Where required, cable shall be UL classified low smoke and low flame for use in air plenums in accordance with NFPA-70. Cables which terminate at each station jack shall conform to ICEA S-80-576. Where required, cable shall be UL classified low smoke and low flame for use in air plenums in accordance with NFPA 70.

13.0 SYSTEM EQUIPMENT:

13.1 The system equipment shall include equipment racks, lockable cabinets, terminal termination patch panels, station jacks, grounding, interior cables, outlet boxes, power supplies, conduits, and other such materials and equipment as required for a complete telephone and LAN system. Network switches shall be provided by the government.

Grounding shall be made via a ground rod and be bonded to the electrical grounding system.

A minimum clearance of 12 inches shall be maintained between runs of communication and power conduits.

14.0 COMMUNICATIONS RACEWAYS/CABLE TRAYS

14.1 Communications raceways shall be installed as specified. Raceways shall allow sufficient space for cables to be installed without compromising the cable manufacturer's recommended minimum bending radius.

14.2 Cable trays shall form a wireway system, and shall be of nominal 6” depth and 12” or 18” wide, unless larger dimensions are required to maintain a maximum 50 percent cross sectional area cable fill. All cable trays outside of the communications rooms shall be ladder type and installed above the acoustical ceiling, and inside the communications rooms shall be ladder type and installed at 6” above equipment racks, and wall plywood backboards. Cable trays shall be constructed of aluminum, copper-free aluminum or zinc-coated steel. Trays shall include dimension and direction-transition fittings, splice and end plates, cable dropout chute fittings, conduit-end tray fasteners and miscellaneous hardware all provided by the cable tray manufacturer. Edges, fittings and hardware shall be finished free from burrs and sharp edges. Conduits terminated at cable trays shall be provided with insulated throat bushings. Cable tray transition fittings shall have not less than the load-carrying ability of straight tray sections and shall have the manufacturer’s minimum standard radius. Radius of bends shall be 12”. Routing of cable trays shall be parallel or perpendicular to walls and ceilings and shall not be run diagonally across rooms. Cable trays shall penetrate fire rated walls and partitions in accordance with Article 300 of NFPA 70. Fire stop any cable tray penetrations through fire walls to meet fire resistance ratings required in ASTM E814-11a or UL 1479. Ground cable tray with a #6 AWG ground cable & connect to the ground bus bar in each Comm room.

14.3 The cable tray shall be supported using the manufacturers' recommended support brackets, threaded rods and associated hardware. The cross strap shall not be used to support the overhead cable tray. Vertical structures such as cabinets, relay racks, frames and bays, attached to the floor for panel-mounted equipment, may be used for supporting associated cable ladder runs. The installation of all cable trays, ducts, and ladders shall conform to industry standards.

14.4 The cable pathway system shall be grounded to the facility ground -- this grounding may be accomplished through the mounting hardware or by separate wire (minimum #6

AWG).

14.5 The Contractor shall seal holes in walls around signal ducts and conduits equivalent to that of the wall. Duct covers shall be spliced on each side of the wall (with joint shields) to allow a non-removable section of cover within the wall. Any reductions required at firewalls shall provide multiple runs through the wall totaling at least as many square inches of area as the duct or conduit running to the wall. It shall be the responsibility of the Contractor to perform all sealing, filling, or fire-stopping through bulkhead fittings with materials and practices in compliance with applicable codes, regulations and directives.

15.0 GROUNDING:

15.1 Signal distribution system ground shall be installed in the telecommunications entrance facility and in each telecommunications closet in accordance with ANSI-J-STD-607-A/B.

NOTE: Except where specifically indicated otherwise, all exposed non-current carrying metallic parts of telephone & LAN/Data equipment, cable shields, and terminals shall be grounded. Equipment racks (i.e. LAN/Data cabinets) shall also be connected to the respective Comm room ground bus bar.

15.2 Install a 10”L X 4”W X 1/4”T ground bus bar with 1/4” DIA. attachment holes at the base of TTB in each Comm room. Use wall mounting brackets with insulators. Install a #4 AWG ground cable from master building ground & terminate to the ground bus bar. Apply No-Ox grease to the ground terminal lugs installed.

16.0 EXTERIOR ROUTE:

16.1 The route to the nearest servicing manhole, hand hole, splice pit or facility determined by 19 CS to the facility’s main TR. Provided route will include, but is not limited to the following:

- Outside plant cables (Copper/Fiber), copper building entrance cable shall be #24 AWG, solid copper conductor, type REA PE-89 gel-filled telephone cable. Fiber cable shall be single-mode optical fibers (strand count to be specified). The single-mode fiber shall be step index optical glass.

- Conduit from main TR to the servicing manhole or splice pit.

- Routes identified as direct buried require street, drive, and parking lot conduit crossing of 20’ greater than the crossing.

- All exterior conduits will be at a minimum, schedule 40 PVC with sweeping bends/radius.

- Conduits will be buried with a minimum of 30” of top cover with an initial layer of sand so that the installed conduits are completely covered.

- All pairs in each cable shall be usable. All conductors for incoming and tie-cables shall be usable, except those identified as defective by the manufacturer.

16.2 Communication Squadron requests inspection of communications infrastructure from closest servicing manhole or splice pit to TR prior to burial and/or encasement. Inspection to include: ducts, manholes, handholes, cable, correct depth of trench, proper sweeps of conduit, direction, etc.

16.3 SERVICE ENTRANCE:

16.3.1 Service entrance for communications shall utilize the number of conduits as shown on drawings. One 4 inch conduit shall have innerduct installed inside the conduit. Maxcell—3” 3 cell packs for total of 9 innerducts http://www.maxcellinnerduct.com/ with 900lb pull strings.

16.4 MANHOLES AND DUCTS:

16.4.1 Manholes and ducts shall be designed and installed IAW REA TE&CM 643, REA Form 515c, Technical Order (T.O.) 31W3-10-22, National Electrical Manufacturers Association TC-2, and NEMA TC-10.

17.0 COMMUNICATIONS DISTRIBUTION SYSTEM TESTING

17.1 GENERAL

17.1.1 Materials and documentation to be furnished under this specification are subject to inspections and tests. All components shall be terminated prior to testing. Equipment and systems will not be accepted until the required inspections and tests have been made, demonstrating that the signal distribution system conforms to the specified requirements, and that the required equipment, systems, and documentation have been provided in writing.

17.2 PROCEDURE

17.2.2 The Contractor shall provide all necessary personnel, equipment, instrumentation, and supplies required to properly test and document the transmission media parameters of the voice and data transmission systems. The Contractor shall also notify the Base Communications Squadron 14 days before the acceptance tests are to be conducted.

Specific tests shall include:

17.3 UNSHIELDED TWISTED-PAIR TESTS

17.3.1 All metallic cable pairs shall be tested for proper identification and continuity. All opens, shorts, crosses, grounds, and reversals shall be corrected. Correct color-coding and termination of each pair shall be verified in the communications closet and at the outlet.

Horizontal wiring shall be tested from and including the termination device in the communications closet to and including the modular jack in each room. Backbone wiring shall be tested end-to-end, including termination devices, from terminal block to terminal block, in the respective communications closets. These tests shall be completed and all errors corrected before any other tests are performed.

17.4 COPPER CABLE TESTS

17.4.1 Cable tests shall be performed with all cables in place. Testing shall be performed in accordance with RUS Bulletin 345-63, (PC-4) for Shield Continuity, Conductor Insulation Resistance, and DC Loop Resistance Measurements and TIA/EIA-568-B for attenuation, capacitance, and near-end crosstalk. All defective pairs, except those identified as defective by the manufacturer, in accordance with the applicable cable specifications, shall be made good by the Contractor. Cable test results shall be documented and provided to the Communications Squadron.

17.5 FIBER OPTIC CABLE TESTS

17.5.1 Connectors shall be visually inspected for scratches, pits or chips and shall be re-terminated if any of these conditions exist. The following optical tests shall be performed:

Optical Time Domain Reflectometer (OTDR) Test, and Attenuation Test. These tests shall be performed on the completed end-to-end spans which include the near-end pre-connectorized single-fiber cable assembly, outside plant as specified, and the far-end pre-connectorized single-fiber cable assembly. The following acceptance tests shall be performed for each fiber in the completed cable length. Single-mode fibers do not require Bandwidth Test.

17.6 Reports shall be delivered to the Contracting Office within 14 days after completion.

18.0 STANDARD COMMUNICATIONS ROOM WIRING DIAGRAM:

The attached diagrams depict a standard single rack communications room wiring diagram.

The diagram includes typical cable routing, rack elevation, associated grounding, and termination locations.