Attachment 1 - EMIS Instruction Guide.pdf

PDF 141 KB Posted

Attached to
Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR Federal contract opportunity
Solicitation number
FA446021R0009
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains an instruction guide and worksheet for contractors supporting hazardous materials tracking requirements at Little Rock Air Force Base. The guide outlines information required from contractors, including company name, contract details, hazardous material inventory and location data, and certifications. Contractors must submit a worksheet for each hazardous product used, along with material safety data sheets, and monthly usage reports for contracts over six months. The worksheet collects national stock numbers, material descriptions, quantities, unit types, process and storage locations. Contractors must certify and a government representative must sign each worksheet. Monthly usage reports track materials on hand and used. This ensures the base can comply with environmental laws and regulations regarding hazardous materials handling and reporting.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR, newest first.
File Type Posted
Amend 05 -Solicitation Amendment - FA446021R00090005.pdf PDF
Amend 05 -Attachment 38 Questions and Answers after 3rd Site visit.pdf PDF
Amend 05 -Updated Attachment 30 - Past Performance Package..docx DOCX document
Amend 05 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 05 -Attachment 13 - Statement of Work for MACC Rev 1.pdf PDF
Solicitation Amendment FA446021R00090004 SF 30.pdf PDF
Amend 04 -Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Solicitation Amendment - FA446021R00090004.pdf PDF
Amend 04 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 04 -Attachment 37 - 2nd Site Visit Sign-in-Sheet 6-23-21.pdf PDF
Solicitation Amendment FA446021R00090003 SF 30.pdf PDF
Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Updated Attachment 30 - Past Performance Package.docx DOCX document
Attachment 34 - PPI Tool Download Instructions.pdf PDF
Solicitation Amendment FA446021R00090002 SF 30.pdf PDF
Solicitation Amendment FA446021R00090001 SF 30.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 Seed Project Amend 1.zip ZIP file
Amend 0001-Solicitation - FA446021R0009 Rel.pdf PDF
Attachment 28 - Financial Institution Reference Sheet.pdf PDF
Attachment 23 - 27 20 00 COMPUTER-TELEPHONE SYSTEMS May 2010.pdf PDF
Attachment 12 - Scheduled Government Furnished Property.pdf PDF
Attachment 22 - 26 05 04 RACEWAYS.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 29 - Maintainability Review Checklist FORM - Design Team.docx DOCX document
Attachment 27 - EZSource PresentPast Performance Relevancy Table .docx DOCX document
Attachment 26 - Design Review Checklist including constructability review 2013 07 30.docx DOCX document
Attachment 20 - 10 14 02 INTERIOR SIGNAGE.pdf PDF
Attachment 18 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 16 - 00 00 02 LRAFB SPECIFICATIONS FORMAT STANDARD.pdf PDF
Attachment 9 - LRAFB Architectural Design Guide Supplement.pdf PDF
Attachment 7 - LRAFB Mechanical Design Criteria.pdf PDF
Attachment 30 - Past Performance Package.docx DOCX document
Attachment 25 - 28 31 00 FIRE DETECTION AND ALARM SYSTEMS.pdf PDF
Attachment 24 - 27 51 16 BUILDING MASS NOTIFICATION SYSTEM.pdf PDF
Attachment 19 - 09 06 89 TYPICAL FINISH SCHEDULE.pdf PDF
Attachment 17 - 01 57 22 TREE PRESERVATION.pdf PDF
Attachment 14 - ETL 07-04 AIR FORCE CARPET STANDARD.pdf PDF
Attachment 13 - Statement of Work for MACC.pdf PDF
Attachment 11 - LRAFB Arch Design Guide Supplement 6 Aug 20.pdf PDF
Attachment 10 - LRAFB Arch Compatibility Guide.pdf PDF
Attachment 8 - LRAFB Telecommunications Systems Design.pdf PDF
Attachment 3 - CandD Report.pdf PDF
Attachment 2 - Environmental MOA.pdf PDF
Attachment 33- SubKTR_Consent_Form.pdf PDF
Attachment 21 - 10 44 16 FIRE EXTINGUISHERS - CABINETS.pdf PDF
Attachment 15 - UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.pdf PDF
Attachment 6 - LRAFB Electrical Design Standards.pdf PDF
Attachment 5 - LRAFB Information.pdf PDF
Attachment 4 - LRAFB Civil Design Criteria.pdf PDF
Released Solicitation - FA446021R0009.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

LITTLE ROCK AFB AF-EMIS CONTRACTOR INSTRUCTION GUIDE

This information is required in order to help the base Hazardous Material Office (HAZMO) track all hazardous materials on-base. A worksheet must be filled out for each product containing a hazardous material. All blocks must be filled in.

1. Contractor Name: Fill in the name of the contracting company performing the work.

Contract Number: Fill in contract number or project number

Estimated Start Date: Fill in the date the project is projected to start.

Estimated Completion Date: Fill in the date the project is projected to end.

Shop Information: Fill in the AF-EMIS shop code that will be used to track the hazardous materials in the Air Force

Environmental Management Information System. If you do not know this code, leave it blank. You will be assigned a shop code if you do not already have one.

2. Material Information: Information about the hazardous material that is going to be used.

National Stock Number, Local Stock Number, or Part Number: Fill in the identifying number of the product to be used.

Material Noun: Fill in the general term used to define the product. Example: Adhesive, Ni-cad Battery, etc.

Size: Fill in the quantity, circle the unit of measure, and circle the container type.

Unit of Issue: Fill in how the product is received. Example: box, case, pallet, each, etc.

Units Per Container: Identify how much comes in each unit of issue. Example: Twelve cans per box. Twelve being units per container and box being the unit of issue.

3. Location Information: Information about what the product will be used on, where it will be used, and where it will be stored when not in use.

Check all boxes that apply pertaining to where and on what the process of using the hazardous material will occur.

Location of Process: Identify in the physical location of where the product will be used. Example: Building number, intersection street names, etc.

Location of Stored Materials: Identify the physical location of where the material will be stored when not in use.

4. Additional Information: Information for the purpose of completing reports.

Hazardous Waste Generated: Does the process create any hazardous waste?

Site Diagram Available: Is a site diagram available for additional information on the site where the product will be used and stored?

Little Rock AFB SPCC Red Plan: This is part of the base Spill Prevention, Control, and Countermeasures Plan. The Red

Plan lists base procedures for reporting spills.

5. Certifier Block: The certifier is the Government Representative for the project. This block must be completed and signed by both parties.

Notes:

A Manufacturer Material Safety Data Sheet (MSDS) for use by the Hazardous Materials Office is required to be turned in each time a worksheet is completed.

Each month a Contractor Hazardous Material Usage Data Sheet must be completed by the contractor and turned into the

Government Representative for any project over six months. Projects less than six months are required to turn in a data sheet after completion of project. The Government Representative will be responsible for turning over this information to the HAZMO.

LITTLE ROCK AFB AF-EMIS CONTRACTOR WORKSHEET

(Fill In All Information)

NOTE: Manufacturer’s Material Safety Data Sheet (MSDS) Required With Every Worksheet

1. CONTRACTOR INFORMATION

Contractor Name

Contract Number

Estimated Start Date

Estimated Completion Date

AF-EMIS Shop Code (Leave shop code blank if not known)

2. MATERIAL INFORMATION

National Stock Number (NSN), Local Stock Number (LSN), Or Part Number

Material Noun (Be Specific)

Size (Quantity) CIRCLE ONE Fluid Oz Troy Oz

Container Type Box Bottle Can Drum Bag Gram Pint Pound

Cartridge Other____________ Quart Kg Gallon

Unit of Issue Units Per Container Other _______________

3. LOCATION INFORMATION

Will The Process Be Performed On: (Check All That Apply)

Existing Facility Equipment New Structure Aircraft Outdoors

Physical Location Of Process

Location Of Stored Materials

4. ADDITIONAL INFORMATION (Circle Answer That Applies)

Is A Hazardous Waste Generated? Yes No Additional Remarks:

Is A Site Diagram Available? Yes No

Is The SPCC Red Plan Posted? Yes No

5. CERTIFIER BLOCK

This Request Cannot Be Processed Without A Government Representative’s Signature

Contractor Title: Phone: Date

Printed Name

Signature

Gov’t Rep Title: Phone: Date

Printed Name Signature

CONTRACTOR HAZARDOUS MATERIAL USAGE DATA

Contractor: _______________________________AF-EMIS Shop Code: ____________________________

Contract Number___________________________Locations______________________________________

The following information is required for tracking of hazardous materials on-base. For contract times exceeding six months, this form is required to be filled out monthly and returned to the Government Representative, who will return it to the HAZMO office. This information is required in order to comply with Environmental Laws and

Regulations. For purchase orders/contracts less than six months, this form is required at start and upon completion of work.

Material Name Manufacturer NSN/LSN or Part #

Quantity in Stock

Quantity Used

Printed name and Signature:

Contractor: __________________________________________________________________Date__________

Government Rep: _____________________________________________________________Date__________

File details come from the government source that posted it. Updated .