Attachment 21 - 10 44 16 FIRE EXTINGUISHERS - CABINETS.pdf

PDF 100 KB Posted

Attached to
Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR Federal contract opportunity
Solicitation number
FA446021R0009
Issued by
Department of the Air Force Air Mobility Command

About this file

This file provides specifications for fire extinguishers and cabinets. The specifications cover the scope of providing fire extinguishers and cabinets at building exits and as required by applicable codes. Fire extinguishers must comply with NFPA 10 requirements and be located per IFC 1414, IFC 906, NFPA 1 and NFPA 101. Ten pound, multi-purpose dry chemical fire extinguishers are to be provided unless code requires otherwise for the occupancy. Fire extinguisher cabinets must be semi-recessed with glass doors for gypsum walls and surface mounted with glass doors for CMU walls, and be constructed of brushed aluminum or stainless steel with a white interior coating. Installation must comply with manufacturer recommendations, and extinguishers must be fully charged and ready upon installation with manufacturer warranty and inspection tag attached.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR, newest first.
File Type Posted
Amend 05 -Solicitation Amendment - FA446021R00090005.pdf PDF
Amend 05 -Attachment 38 Questions and Answers after 3rd Site visit.pdf PDF
Amend 05 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 05 -Attachment 13 - Statement of Work for MACC Rev 1.pdf PDF
Amend 05 -Updated Attachment 30 - Past Performance Package..docx DOCX document
Solicitation Amendment FA446021R00090004 SF 30.pdf PDF
Amend 04 -Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Amend 04 -Attachment 37 - 2nd Site Visit Sign-in-Sheet 6-23-21.pdf PDF
Solicitation Amendment - FA446021R00090004.pdf PDF
Amend 04 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Solicitation Amendment FA446021R00090003 SF 30.pdf PDF
Updated Attachment 30 - Past Performance Package.docx DOCX document
Attachment 34 - PPI Tool Download Instructions.pdf PDF
Solicitation Amendment FA446021R00090002 SF 30.pdf PDF
Solicitation Amendment FA446021R00090001 SF 30.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 Seed Project Amend 1.zip ZIP file
Amend 0001-Solicitation - FA446021R0009 Rel.pdf PDF
Attachment 28 - Financial Institution Reference Sheet.pdf PDF
Attachment 23 - 27 20 00 COMPUTER-TELEPHONE SYSTEMS May 2010.pdf PDF
Attachment 12 - Scheduled Government Furnished Property.pdf PDF
Attachment 1 - EMIS Instruction Guide.pdf PDF
Attachment 22 - 26 05 04 RACEWAYS.pdf PDF
Attachment 25 - 28 31 00 FIRE DETECTION AND ALARM SYSTEMS.pdf PDF
Attachment 24 - 27 51 16 BUILDING MASS NOTIFICATION SYSTEM.pdf PDF
Attachment 19 - 09 06 89 TYPICAL FINISH SCHEDULE.pdf PDF
Attachment 17 - 01 57 22 TREE PRESERVATION.pdf PDF
Attachment 14 - ETL 07-04 AIR FORCE CARPET STANDARD.pdf PDF
Attachment 13 - Statement of Work for MACC.pdf PDF
Attachment 11 - LRAFB Arch Design Guide Supplement 6 Aug 20.pdf PDF
Attachment 10 - LRAFB Arch Compatibility Guide.pdf PDF
Attachment 8 - LRAFB Telecommunications Systems Design.pdf PDF
Attachment 3 - CandD Report.pdf PDF
Attachment 2 - Environmental MOA.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 29 - Maintainability Review Checklist FORM - Design Team.docx DOCX document
Attachment 27 - EZSource PresentPast Performance Relevancy Table .docx DOCX document
Attachment 26 - Design Review Checklist including constructability review 2013 07 30.docx DOCX document
Attachment 20 - 10 14 02 INTERIOR SIGNAGE.pdf PDF
Attachment 18 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 16 - 00 00 02 LRAFB SPECIFICATIONS FORMAT STANDARD.pdf PDF
Attachment 9 - LRAFB Architectural Design Guide Supplement.pdf PDF
Attachment 7 - LRAFB Mechanical Design Criteria.pdf PDF
Attachment 30 - Past Performance Package.docx DOCX document
Attachment 33- SubKTR_Consent_Form.pdf PDF
Attachment 15 - UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.pdf PDF
Attachment 6 - LRAFB Electrical Design Standards.pdf PDF
Attachment 5 - LRAFB Information.pdf PDF
Attachment 4 - LRAFB Civil Design Criteria.pdf PDF
Released Solicitation - FA446021R0009.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE EXTINGUISHERS & CABINETS 10 44 16 - 1

SECTION 10 44 16 – FIRE EXTINGUISHERS & CABINETS

PART 1 - GENERAL

1.01 SCOPE:

Provide a minimum of one fire extinguisher and cabinet at all exit doors from an office suite, building exit, assembly area exit and as required by applicable codes and regulations.

1.02 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

INTERNATIONAL CODE COUNCIL (ICC)

IFC 1414 (2004) Portable Fire Extinguishers (Where Required)(Construction, Alteration, Demolition) IFC 906 (2004) Portable Fire Extinguishers

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 1 (2006) Uniform Fire Code, 2006 Edition NFPA 10 (2002) Standard for Portable Fire Extinguishers NFPA 101 (2006) Life Safety Code, 2006 Edition NFPA 303 (2006) Fire Protection Standards for Marinas and Boatyards NFPA 385 (2000) Standard for Tank Vehicles for Flammable and Combustible Liquids NFPA 409 (2004) Standard on Aircraft Hangers NFPA 418 (2001) Standard for Heliports NFPA 505 (2006) Fire Safety Standard for Powered Industrial Trucks Including Type Designations, Areas of Use, Conversions, Maintenance, and Operations NFPA 99 (2005) Health Care Facilities

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.106 (2003) Flammable and Combustible Liquids 29 CFR 1910.157 (2003) Portable Fire Extinguishers

UNDERWRITERS LABORATORIES (UL)

UL 154 (2005) Standards for Carbon Dioxide Fire Extinguishers UL 2129 (2005) Standards for Halocarbon Clean Agent Fire Extinguishers UL 299 (2002; R 2005e10) Standards for Dry Chemical Fire Extinguishers UL 626 (2005e8) Standards for Water Fire Extinguishers UL 8 (2005e6) Standards for Water Base Agent Fire Extinguishers

1.03 SUBMITTALS REQUIRED

Submit manufacturer's catalog cuts/data.

FIRE EXTINGUISHERS & CABINETS 10 44 16 - 2

1.04 DELIVERY, HANDLING, AND STORAGE

1. Protect materials from weather, soil, and damage during delivery, storage, and construction.

2. Deliver materials in their original packages, containers, or bundles bearing the brand name and the name and type of the material.

PART 2 - PRODUCT

2.01 FIRE EXTINGUISHERS

A. General

Fire Extinguishers shall conform to NFPA 10. Quantity and placement must comply with the applicable sections of IFC 1414, IFC 906, NFPA 1 and NFPA 101

B. Types Provide and install 10 pound, multi-purpose (class ABC) dry chemical, monoammonium phosphate fire extinguishers with pressure gages, unless otherwise required by applicable code for occupancy or use classification of the facility area. Contractor shall be responsible for initial filling of fire extinguishers.

2.02 FIRE EXTINGUISHER CABINETS

A. Provide semi-recessed cabinets with full glass face door for gypsum wall board stud walls and surface mounted cabinets with full glass face door for CMU wall locations.

B. Exposed exterior surfaces of the cabinet shall be brushed aluminum or stainless steel.

Interior surfaces of cabinet shall be pre-finished white coating on steel, stainless steel or brushed aluminum.

PART 3 - EXECUTION

3.01 INSTALLATION

Comply with the manufacturer's recommendations for all installations. Provide extinguishers which are fully charged and ready for operation upon installation. Provide extinguishers complete with Manufacturer's Warranty with Inspection Tag attached.

3.02 ACCEPTANCE PROVISIONS

A. Repairing

1. Remove and replace damaged and unacceptable portions of completed work with new work at no additional cost to the Government.

2. Provide Replacement Parts list indicating specified items replacement part, replacement cost, and name, address and contact for replacement parts distributor.

B. Cleaning Clean all surfaces of the work, and adjacent surfaces which are soiled as a result of the work. Remove from the site all construction equipment, tools, surplus materials and rubbish resulting from the work.

C. General

1. Extinguishers shall be charged and tagged with date.

2. Contractor shall be responsible for filling.

FIRE EXTINGUISHERS & CABINETS 10 44 16 - 3

3. Clean prior to final inspection. Remove all dust, dirt and debris and touch-up blemishes according to the manufacturer's guidance.

END OF SECTION – FIRE EXTINGUISHERS & CABINETS

FIRE EXTINGUISHERS & CABINETS 10 44 16 - 4

SECTION 10 44 16 – FIRE EXTINGUISHERS & CABINETS
PART 1 - GENERAL
1.01 SCOPE:
1.02 REFERENCES
1.03 SUBMITTALS REQUIRED
1.04 DELIVERY, HANDLING, AND STORAGE
1. Protect materials from weather, soil, and damage during delivery, storage, and construction.
2. Deliver materials in their original packages, containers, or bundles bearing the brand name and the name and type of the material.
PART 2 - PRODUCT
2.01 FIRE EXTINGUISHERS
A. General
B. Types
2.02 FIRE EXTINGUISHER CABINETS
A. Provide semi-recessed cabinets with full glass face door for gypsum wall board stud walls and surface mounted cabinets with full glass face door for CMU wall locations.
B. Exposed exterior surfaces of the cabinet shall be brushed aluminum or stainless steel. Interior surfaces of cabinet shall be pre-finished white coating on steel, stainless steel or brushed aluminum.
PART 3 - EXECUTION
3.01 INSTALLATION
3.02 ACCEPTANCE PROVISIONS
A. Repairing
1. Remove and replace damaged and unacceptable portions of completed work with new work at no additional cost to the Government.
2. Provide Replacement Parts list indicating specified items replacement part, replacement cost, and name, address and contact for replacement parts distributor.
B. Cleaning
C. General
1. Extinguishers shall be charged and tagged with date.
2. Contractor shall be responsible for filling.
3. Clean prior to final inspection. Remove all dust, dirt and debris and touch-up blemishes according to the manufacturer's guidance.

File details come from the government source that posted it. Updated .