Attachment 9 - 05_Narrative_Fire Protection.pdf

PDF 208 KB Posted

Attached to
Y1DA--757-22-705 EHRM Infrastructure Upgrades - Columbus, OH - Tier 2 Construction (VA-22-00108764)
Solicitation number
36C77623R0150
Issued by

About this file

This document is a narrative for fire protection requirements for a federal construction project to upgrade infrastructure at a Veterans Affairs medical center in Columbus, Ohio. Key requirements include modifying the existing automatic fire sprinkler system and expanding it or replacing sprinklers to accommodate a new floor plan for telecommunication closets and the main computer room. The main computer room will also receive a clean agent fire suppression system designed and installed per NFPA 2001 standards. The existing fire alarm system will be modified with new equipment, devices, appliances and pathways meeting various NFPA and VA standards. Spot-type smoke detection and new duct smoke detectors will be provided as shown in drawings. The main computer room will receive an aspirating smoke detection system per NFPA 75. A new releasing service fire alarm control unit will be installed to actuate the clean agent system.

View the file

Other files

File Type Posted
Amd 11 Att - RFI Responses_3.12.24.pdf PDF
36C77623R0150 0011.docx DOCX document
36C77623R0150 0010.docx DOCX document
Amd 10_1791.19 - RFI Responses_3.11.24.pdf PDF
Amd 10 23 07 11 HVAC and Boiler Plant Insulation2.pdf PDF
36C77623R0150 0009.docx DOCX document
36C77623R0150 0008.docx DOCX document
OIT Infrastructure Standard for Telecommunications Spaces - Version 3.1.pdf PDF
36C77623R0150 0007.docx DOCX document
Amendment 6 All Files.zip ZIP file
36C77623R0150 0006.docx DOCX document
36C77623R0150 0005.docx DOCX document
36C77623R0150 0004.docx DOCX document
757-22-705 Pre-Bid Site Visit Sign In.pdf PDF
04_Architectural.pdf PDF
36C77623R0150 0003.docx DOCX document
02_Hazardous Materials.pdf PDF
01_General.pdf PDF
06_Mechanical_Drawings.pdf PDF
07_Electrical.pdf PDF
03_Structural.pdf PDF
08_Telecom.pdf PDF
05_Fire Protection.pdf PDF
Columbus EHRM FINAL SPECS VOL 1.pdf PDF
Columbus EHRM FINAL SPECS VOL 2.pdf PDF
36C77623R0150 0002.docx DOCX document
36C77623R0150 0001.docx DOCX document
Attachment 15 -Site Visit Instructions Revised.docx DOCX document
Attachment 11 - 07_Narrative_Electrical.pdf PDF
Attachment 6 - 01_Narrative_Architectural.pdf PDF
Attachment 2 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 13- Wage Rates.pdf PDF
Attachment 8 - 03_Narrative_Structural (1).pdf PDF
Attachment 15 -Site Visit Instructions.docx DOCX document
36C77623R0150_1.docx DOCX document
Attachment 14 - EHRM FULL SET 07122023.pdf PDF
Attachment 4 - EHRM Columbus Drawings Part 2.pdf PDF
Attachment 12 - 09_Narrative_Telecom.pdf PDF
Attachment 16- VA Engineering Map.pdf PDF
Attachment 3 - EHRM Columbus Drawings Part 1.pdf PDF
Attachment 10 - 06_Narrative_Mechanical.pdf PDF
Attachment 1- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 5 - EHRM Columbus Drawings Part 3.pdf PDF
Attachment 7 - 02_Narrative_Environmental.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

757-22-705 (1791.19) EHRM Infrastructure Upgrades

– Tier 2

SUBMITTAL Final Bid Documents SUBJECT Fire Protection Narrative

Fire Protection 1

Fire Protection Design Basis of Design

Criteria

The project will be designed in accordance with the following criteria:

• VA Fire Protection Design Manual – Eighth Edition, June 1, 2021

• Physical Security and Resiliency Design Manual, July 2022 Edition

• NFPA 1, Fire Code, 2021 Edition

• NFPA 10, Standard for Portable Fire Extinguishers, 2022 Edition

• NFPA 13, Standard for the Installation of Sprinkler Systems, 2022 Edition

• NFPA 70, National Electrical Code, 2023 Edition

• NFPA 72, National Fire Alarm and Signaling Code, 2022 Edition

• NFPA 75, Standard for the Fire Protection of Information Technology Equipment, 2020 Edition

• NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating

Systems, 2021 Edition

• NFPA 99, Health Care Facilities Code, 2021 Edition

• NFPA 101, Life Safety Code, 2021 Edition

• NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, 2022 Edition

• International Building Code, 2021 Edition

Fire Suppression

The existing automatic fire sprinkler system will be modified to accommodate the new floor plan within each Telecommunication Closet and Main Computer Room (MCR). Modifications to the existing systems include the expansion of the fire protection systems or the replacement of sprinklers will be completed in accordance with the VA Fire Protection Design Manual, Eighth

Edition and NFPA 13. Electronic equipment areas (MCRs) will be provided with a clean agent fire suppression in accordance with NFPA 75.

Hydraulic design calculations for the sprinkler system in the Telecommunication Closets will not be required. Hydraulic design calculations for the Main Computer Room renovation must be provided per NFPA 13, the Contractor will be responsible for conducting a hydrant flow test

757-22-705 (1791.19) EHRM Infrastructure Upgrades

– Tier 2

Fire Protection 2 before the shop drawings are developed to confirm the existing available water supply. Fire sprinkler piping will be routed, distributed, and concealed above the suspended ceilings. The sprinklers provided in Main Control Room 4A201 will be equipped with a new zone control valve assembly as required by NFPA 75.

All new sprinklers will be FM approved/UL listed. Sprinklers located in spaces that do not have ceilings will be installed in an upright orientation. Sprinklers located in spaces that do have ceilings will be installed in a pendent orientation. Pendent sprinklers will be semi-recessed with chrome escutcheons except sprinklers that are equipped with guards.

All new sprinklers located in the Main Computer Room are required to be standard-response, fusible-link sprinklers installed with mechanical guards as required by the VA Fire Protection

Design Manual.

The systems will use the existing Fire Department Connections (FDC).

All Scope of Work areas will be protected with automatic sprinkler protection unless otherwise noted on the design drawings. Hazard classification for each sprinklered area is identified on the design drawings.

The automatic sprinkler system will be tested to assure that equipment and components function as intended. Upon completion of specified tests, the material and test certificates will be submitted to the VA. After hydrostatic testing, the sprinkler system will be flushed per NFPA

13.

All piping will be steel piping. Piping 2 inches or less will be a minimum schedule 40 and all piping larger than 2 inches will be a minimum schedule 10. Seismic bracing for the sprinkler piping is required in accordance with NFPA 13.

A new clean agent fire extinguishment system will be provided in the Main Computer Room –

4A201 in accordance with an ANSI/TIA-942-B rating of 3 as defined in the Office of Information

757-22-705 (1791.19) EHRM Infrastructure Upgrades

– Tier 2

Fire Protection 3

Technology (OIT) infrastructure Standard for Telecommunications Spaces. The clean agent fire suppression system will be designed and installed in accordance with NFPA 2001. The system will be designed/sized for a total flooding application, Class C. The system will be activated by the aspirating smoke detection system going into alarm (Fire 2) or a manual release station being activated by an occupant of the room. Sprinklers installed in the Server

Room will be standard-response, fusible-link with protective cages. The clean agent system will be controlled and monitored by a new RSFACU installed within the server room. As directed by the owner the clean agent system will utilize NOVEC 1230 with a minimum design concentration of 4.5% per NFPA 2001, Table A.5.4.2.2.b.

Fire Alarm

The existing Voice-Evacuation Fire Alarm system will be modified to accommodate the new floor plan for the Scope of Work areas. All equipment, devices, appliances, and pathways will be installed to conform to VA Fire Protection Design Manual, NFPA 70, NFPA 72, and NFPA

90A. The provided system components must be compatible with the existing system. The

Scope of Work areas will use the existing Fire Alarm Control Panels (FACP) and will be expanded as needed to support the area.

Per NFPA 70, all fire alarm components will be powered by electrical panels dedicated to fire protection features. In accordance with the VA Fire Protection Design Manual, Section 7.2.E, wiring shall be installed in metal raceway. All pathways for the Fire Alarm system will comply with a Class B pathway designation and provide requisite circuit supervision. New notification appliances shall be provided as shown on the design drawings. The new appliance finish will match the existing notification appliances.

Existing manual pull stations will remain. No new manual pull stations will be provided as part of this scope of work.

The FA system will be fully tested. Upon completion of specified tests, the material and test certificates will be submitted to the VA. Record drawings, replacement parts, and warranty response time will be provided.

757-22-705 (1791.19) EHRM Infrastructure Upgrades

– Tier 2

Fire Protection 4

Spot-type smoke detection will be provided as shown on the design drawings.

New duct smoke detectors will be provided for the CRAC Units serving the Server Room in accordance with NFPA 90A.

The new Main Computer Room will be provided with an aspirating smoke detection system in accordance with NFPA 75 in order to provide early warning of fire in the room to alert personnel. A new Releasing Service Fire Alarm Control Unit will be installed in the Server

Room to actuate the new clean agent fire extinguishing system protecting the space.

Sensitivity of the early warning fire detection system shall be as follows:

Supervisory Conditions: Alert – 0.2% obs. /ft. (with 30 second delay)

Action – 0.6% obs. /ft. (with 30 second delay)

Alarm Conditions: Fire 1 – 1.0% obs. /ft. (with 15 second delay)

Fire 2 – 3.0% obs. /ft. (with 30 second delay)