This document provides an electrical narrative for an infrastructure upgrade project at a Department of Veterans Affairs medical center. The project includes upgrading electrical systems and infrastructure in the data center and telecommunication rooms, including installing new bus bars, power distribution units, circuit breakers, lighting, and controls. Specific requirements include installing dual power feeds to server racks from UPS sources; a new distribution panel for the data center with fire and emergency power off controls; refeeding perimeter receptacles and rack power from nearby critical panels; and relocating security cameras and motion sensors per standards. Applicable codes and standards are also listed.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
PROJECT NAME
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 1
Electrical Design Narrative Scope of Work The Electrical (Division 26) Scope of work will include support for the following on the
Chalmers P. Wylie VA Medical Center campus:
1. Existing receptacles in the Data Center shall be evaluated and replaced as required.
Additional receptacles will be provided to meet the requirements of the ISTS guidelines.
Receptacles shall be served from the critical branch panelboards.
2. Existing electrical panels serving the Data Center will be evaluated for age and/or capacity and replaced as needed.
3. The critical branch Automatic Transfer Switch (ATS) serving existing Uninterruptible
Power Supplies (UPS’s) in the data center will be evaluated for age and/or capacity and replaced as needed. The essential sources (Normal and emergency) serving critical branch ATS’s for the data will be evaluated for existing capacity and future loads.
4. Phasing will be coordinated with existing operation to minimize any disruption of service.
New Work
1. The Data Center shall be provided with two (2) 208V, 3ph, power bus bars served from two (2) UPS equipment. The bus bars will be coordinated with cable trays, ductwork, and lighting. The UPS’s shall be fed from the critical branch of the essential electrical system of the VA campus. Each rack shall have two sources of power, one connecting into each bus bar. Vertical and horizontal Power Distribution Units (PDU) will be provided for racks to comply with the ISTS / OEHRM guidelines. Power will be provided to the new CRAC’s.
2. A new distribution panel will be provided for the entire Data center. Fire control relays from the Fire Alarm Control Panel will be connected to the Distribution Panelboard to shut down power to the server room in case of a fire in the Data Center. An Emergency
Power Off (EPO) switch will also be provided for a manual shutoff of the Distribution
Panelboard.
3. The existing perimeter receptacles and the rack power will be re-fed from the nearby critical panelboard. A new Critical Panelboard will be provided in each TR room where there is not enough spare breakers on the existing critical panelboard nearby. Rack
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 2
PDU’s and rack UPS’s will be relocated to new racks. Lighting in existing TRs will be brought up to latest standards and changed to LED where fluorescent is existing.
4. Security cameras will be relocated to avoid racks as required. New request to exit motion sensors will be provided where none is existing. Existing motion sensors will be networked to new PACS. A Panic/ Duress button will be added by the door per PSRDM requirements.
Applicable Codes and Standards
ASHRAE standard 90.1-2019-Energy standard for buildings except low rise residential buldings
Architectural Barriers Act (ABA) Standards (2015)
VA Barrier Free Design Standard (PG-18-13)
Illuminating Engineering Society (IES) Handbook, 10th Edition
IBC 2021 – International Building Code
IEBC 2021 – International Existing Building Code
IECC 2021 – International Energy Conservation Code
JCAHO EC 7.40 – Emergency Electrical Power System Inspection, Maintenance, and
Testing
NFPA 70-2023 - National Electrical Code (NEC)
NFPA 101-2021 – Life Safety Code
NFPA 110-2022 – Standard for Emergency and Standby Power Systems
NFPA 111-2022 – Standard on Stored Electrical Energy Emergency and Standby
Power Systems
NFPA 780-2020 – Standard for the Installation of Lightning Protection Systems
VA PG-18-10 Electrical Design Manual, December 2019
VA PG-18-10 Lighting Design Manual, January 2022
Infrastructure Standard for Telecommunications Spaces, July 2021
VA PG-18-10 Telecommunications and Special Telecommunications Systems Design
Manual, February 2016
NFPA 99-2021-HEALTH CARE FACILITIES CODE
VA PG-18-10 Physical Security and Resiliency Design Manual, revised July 2022
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 3
VA H-18-8 SEISMIC DESIGN REQUIREMENTS
BICSI AND EIA/TIA STANDARDS AS DEFINED IN VA PG-18-10
Electrical Demolition Basic Assumptions:
1. No circuits are shared between the area of work and adjacent spaces.
2. Equipment being demolished can be de-energized prior to the contractor performing any work so that work on live equipment will not be required.
3. This project will not include the removal of any equipment containing PCBs
Demolition of electrical work will include:
1. Existing Lighting in the Server Room and Telecommunication Rooms (TR’s).
2. Existing General Receptacles in the TR’s.
Building Power Distribution Systems All building power distribution systems requiring modification or expansion are 208Y/120V.
The new power distribution will be installed and brought online while maintaining all the existing power distribution for the Server Room and TR’s.
Electrical Calculations Voltage drop calculations will be performed for all new feeders and branch circuits. Feeders and branch circuits will be sized to limit voltage drop to the levels recommended by the energy code (2% for feeders, 3% for branch circuits, with the combined drop no more than 5%).
Preliminary fault currents will be calculated to determine the available interrupting current (AIC) rating at the primary and secondary sides of the transformer and at the loads they serve.
These calculations will be performed via SKM PowerTools for Windows software. Final fault current and arc-flash calculations will be performed by the electrical equipment supplier and based upon installed equipment on the project. A protective device coordination study will also be performed by the electrical equipment supplier and all recommended settings will be implemented at the time of installation.
General Electrical Equipment
Switchboards and Distribution Panelboards
New distribution panelboards will be sized for the loads they serve and include 30% spare capacity and spare space. Panelboard bussing will be copper. The distribution
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 4 panelboard ampere interrupting current (AIC) rating will be fully rated and sized based on the available fault current. Floor mounted distribution panelboards will be mounted on a 4” tall concrete house-keeping pad.
New circuit breakers in existing switchboard and distribution panelboards will have available ampere interrupting current (AIC) ratings to match the panelboard.
Panelboards
New panelboards will be provided as required for the project. Panelboards will include main circuit breakers where required by the NEC and bolt-on style circuit breakers.
30% spare capacity will be provided per the VA Electrical Design Manual. Bussing will be copper. Fault currents will be calculated to determine the AIC rating for the panelboard and circuit breakers. All panelboards and circuit breakers will be fully rated.
Panelboards will be provided with clear, concise schedules.
Disconnect Switches
New disconnect switches will be provided for HVAC equipment. Switches will be heavy duty style, rated for the environment installed in and fused if required to protect equipment from high available fault currents. Disconnecting means will be provided within sight of all motors and other equipment.
Motor-rated disconnect switches will be provided for any fan-powered boxes.
Building Feeders, Branch Circuits, and Raceways
All conductors will be copper and routed within raceways.
A copper ground conductor will be routed with all circuits except building service entrance feeders.
Minimum raceway size will be 3/4” above grade and 1” below grade.
Wiring Devices
Receptacles will be hospital grade, NEMA 5-20R grounding type, and ivory in color as required by the VA design guide.
Cover plates will be 302 brushed stainless steel. Cover plates for devices fed from emergency circuits will be 302 brushed stainless steel and engraved with
“EMERGENCY” with red letters.
Grounding and Bonding
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 5
Equipment grounding conductors will be installed with all feeders, and power and lighting branch circuits.
All metallic raceways will be grounded and the equipment grounding conductor will be bonded to all junction boxes, pull boxes, enclosures and panelboards.
Labeling/Nameplates
All new and/or modified medium-voltage site and building distribution equipment will be provided with new phenolic resin labels screwed to the equipment. Normal power distribution equipment will have white lettering on a black background. Essential electrical distribution equipment will have white lettering on a red background. Lettering will be 1” tall and include the name of the equipment, name of the equipment it is fed from, and the sizes of the conductors that it is fed with.
All new and/or modified low-voltage building electrical distribution equipment will be provided with new phenolic resin labels screwed to the equipment. Normal power distribution equipment will have white lettering on a black background. Essential electrical distribution equipment will have white lettering on a red background. Lettering will be ½” tall and include the name of the equipment, name of the equipment it is fed from, and the sizes of the conductors that it is fed with.
All new wiring device cover plates will be labeled with a permanent adhesive label listing panel and circuit feeding the wiring device.
GENERAL LIGHTING EQUIPMENT
Building Lighting
Lighting within the Server Room and TR’s will consist of strip light style fixtures with
LED light sources with integral lamps and drivers. Drivers will be a minimum of 85% efficient at full load, have a power factor greater than 95%, total harmonic distortion less than 20%, and operate with a universal 120/277V input.
New Suspended LED lighting in the Server Room will be coordinated with cable trays, ductwork, and bus bars.
Exit light fixtures will be LED type with red lettering and a brushed aluminum finish.
Fixtures will be single or double-faced with directional arrows as required.
Lighting Controls
757-22-705 (1791.19) EHRM Infrastructure Upgrades – Columbus, OH – Tier 2
SUBMITTAL Bid Documents SUBJECT Electrical Narrative
Electrical 6
Standard manual light switches will be quiet toggle type, specification grade and ivory in color as required by the VA design guide. Manual light switches will be utilized in the
Server Room and the TR’s, since automatic control of lights would be detrimental to the occupant.
| Switchboards and Distribution Panelboards |
| Panelboards |
| Disconnect Switches |
| Building Feeders, Branch Circuits, and Raceways |
| Wiring Devices |
| Grounding and Bonding |
| Labeling/Nameplates |
| General Lighting Equipment |
| Building Lighting |
| Lighting Controls |