Attachment 7 - 02_Narrative_Environmental.pdf

PDF 503 KB Posted

Attached to
Y1DA--757-22-705 EHRM Infrastructure Upgrades - Columbus, OH - Tier 2 Construction (VA-22-00108764)
Solicitation number
36C77623R0150
Issued by

About this file

This document is an environmental narrative submitted in response to a federal contract solicitation for EHRM infrastructure upgrades at a VA medical center in Columbus, Ohio. Riverfront Safety and Health conducted limited asbestos, lead, and mold surveys of three buildings on site. No asbestos-containing materials, lead-based paint, or signs of mold growth were found. Limited lead was detected below regulatory thresholds. The roofing material status is unknown and should be considered presumed asbestos-containing. The solicitation number is 36C77623R0150 from the VA Technology Acquisition Center Austin for upgrades supporting new electronic health records. The incumbent was not specified.

View the file

Other files

File Type Posted
Amd 11 Att - RFI Responses_3.12.24.pdf PDF
36C77623R0150 0011.docx DOCX document
36C77623R0150 0010.docx DOCX document
Amd 10_1791.19 - RFI Responses_3.11.24.pdf PDF
Amd 10 23 07 11 HVAC and Boiler Plant Insulation2.pdf PDF
36C77623R0150 0009.docx DOCX document
36C77623R0150 0008.docx DOCX document
OIT Infrastructure Standard for Telecommunications Spaces - Version 3.1.pdf PDF
36C77623R0150 0007.docx DOCX document
Amendment 6 All Files.zip ZIP file
36C77623R0150 0006.docx DOCX document
36C77623R0150 0005.docx DOCX document
36C77623R0150 0004.docx DOCX document
757-22-705 Pre-Bid Site Visit Sign In.pdf PDF
04_Architectural.pdf PDF
36C77623R0150 0003.docx DOCX document
02_Hazardous Materials.pdf PDF
01_General.pdf PDF
06_Mechanical_Drawings.pdf PDF
07_Electrical.pdf PDF
03_Structural.pdf PDF
08_Telecom.pdf PDF
05_Fire Protection.pdf PDF
Columbus EHRM FINAL SPECS VOL 1.pdf PDF
Columbus EHRM FINAL SPECS VOL 2.pdf PDF
36C77623R0150 0002.docx DOCX document
36C77623R0150 0001.docx DOCX document
Attachment 15 -Site Visit Instructions Revised.docx DOCX document
Attachment 11 - 07_Narrative_Electrical.pdf PDF
Attachment 9 - 05_Narrative_Fire Protection.pdf PDF
Attachment 6 - 01_Narrative_Architectural.pdf PDF
Attachment 2 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 13- Wage Rates.pdf PDF
Attachment 8 - 03_Narrative_Structural (1).pdf PDF
Attachment 15 -Site Visit Instructions.docx DOCX document
36C77623R0150_1.docx DOCX document
Attachment 14 - EHRM FULL SET 07122023.pdf PDF
Attachment 4 - EHRM Columbus Drawings Part 2.pdf PDF
Attachment 12 - 09_Narrative_Telecom.pdf PDF
Attachment 16- VA Engineering Map.pdf PDF
Attachment 3 - EHRM Columbus Drawings Part 1.pdf PDF
Attachment 10 - 06_Narrative_Mechanical.pdf PDF
Attachment 1- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 5 - EHRM Columbus Drawings Part 3.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

SUBMITTAL Bid Documents SUBJECT Environmental Narrative

Environmental - 1

Project Overview and Background

Riverfront Safety & Health, LC (Riverfront), a Service-Disabled Veteran Owned Small Business, has performed a limited asbestos and lead field survey in support of the EHRM Infrastructure Upgrade Tier 2 (757-22-795) proposed at the Chalmers P. Wylie VA Ambulatory Center, Columbus, Ohio (The Project). The initial hazardous materials report was based on the first phase historical data for Building 1 collected by RSH. The limited asbestos and lead survey was performed using project SOW documents as a basis for proposed work along with a generalized understanding of proposed data system distributions. The inspection took place within the Engineering Building, Energy Center, and Building 1.

This project specific limited field survey was performed by Eric Colombo and Zachary Haselhorst on November 16, 2022. The lead survey was performed by Eric Colombo and Zach Haselhorst on the same date. The two RSH personnel are accredited under the Asbestos Hazard Emergency Response Act (AHERA), U.S. Environmental Protection Agency Model Accreditation Program for Asbestos Building Inspectors. Eric Colombo and Zach Haselhorst are both Environmental Protection Agency (EPA) trained Lead Risk Assessors. All work was performed under the direct supervision of a Certified Industrial Hygienist (CIH), Mr. Justin R.

Rhyneer to ensure standard EPA-NESHAP/AHERA/OSHA field inspection and sampling methods were employed for representative project inspection. Lead paint readings (testing) were collected using a standard XRF direct reading instrument. The three buildings are known to be constructed after 2008 and were not suspect for lead-based paint but readings were obtained, as a precaution, to verify lead-based paint and materials were not present. The potential for lead lined walls in X-ray areas and asbestos products in roofing materials are currently unknown.

Principal contacts for this project were Chris Pannell of the VA Medical Center and Brian Mays from Spur-Design. Access to TR rooms was provided by Mr. Pannell who also served as escort for the two RSH inspectors while on the campus grounds. The inspections occurred during typical business hours.

Scope of Work

Riverfront Safety and Health, provided accredited inspection personnel to perform the following:

Verify the presence, location, quantity, appearance, and condition of all applicable building materials exhibiting asbestos, lead and mold containing materials within areas of scheduled work in order to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The project shall include, but is not limited to, Electrical (electrical panel upgrade, power (normal, emergency)); Bonding; UPS;

Building Management System interfaces; assess for new and upgrades to existing HVAC;

reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); renovate space for datacenter (expanded space, cable management, server rack configuration); communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings; provide diversified path for WAN; and Hazardous material abatement. The project will include limited areas of work within Building 1, Engineering Building, and the Energy Center/Site. It is currently believed that

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 2

HVAC compressors are to be roof mounted therefore impacting the roof membrane, insulation, and decking.

The project inspection was performed with the following limitations:

• A fully occupied and functioning hospital system with limited access due to daily hospital services.

• Penthouses, and crawlspaces were not thought to be within project limits.

• The inspection was conducted and based on an inferred design where tracking of locations of the existing data infrastructure occurred.

• The limits of inspection and sample collection were generally “non-intrusive” in nature as is consistent with this type of inspection. Project pathways through the roof systems were not suggested, and samples were not collected to avoid warranty issues. These samples can be collected at a later date once design elements evolve verifying impact to the roofing materials.

Asbestos Containing Materials – Assessment & Inspection Results

The historical data collected from the original EHRM survey showed a trend of no asbestos present as all samples collected and analyzed had results of None Detected for all samples.

Riverfront personnel collected a total of 68 (92 layers) representative samples. to EHRM Infrastructure Upgrade Tier 2 Project. All samples were transferred via written chain-of-custody, to EMSL, an AIHA & NVLAP accredited laboratory, for analysis. The suspect materials, which were similar in general appearance and age of construction, were grouped into homogeneous material sets and sampled. A minimum of three samples were collected of all suspect asbestos containing building materials found during the site visit based on conditions noted November 16, 2022. Practical precautions were used in collecting samples to ensure safety of all personnel. All samples were safely collected, placed in sealed containers, and transferred with a written chain-of-custody, to EMSL, an AIHA & NVLAP accredited laboratory, for analysis. All samples were analyzed using polarized light microscopy (PLM) analysis with dispersion staining (DS) according to U.S. Environmental Protection Agency (EPA) Method 600 IR-93/116 which is presently recommended by the EPA. Asbestos Containing Materials are defined by EPA as having greater than 1% asbestos as measured by PLM methods. The March 2021 asbestos field survey was used as a baseline for inspection and additional samples were collected in known areas of work within Building 1, the Engineering Building, and the Energy Center/Site.

Zero (0) of the 68 representative samples collected at Building 1, the Engineering Building, and the Energy Center/Site during this limited survey were detected as asbestos containing materials (ACM). No records were available identifying roof sampling. VACOR directed to not sample roof and presume as asbestos containing material. To avoid this, the impacted roofing materials will be considered as presumed asbestos containing materials (PACM).

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 3

A summary of asbestos sampling efforts, including sample numbers, descriptions, locations, quantities, category (friable or non-friable) and analytical results are presented in Table 1. The full laboratory analytical reports are included in Appendix A.

Lead Containing Materials – Assessment & Inspection Results

Dates of construction for all three buildings were post 2008, far past the industry accepted cutoff date of 1978 for lead-based paint to be present in new construction. However, as a precaution, the two inspectors performed a thorough inspection to verify that no lead-based paint was present in likely future project work areas. The inspection was non-destructive in nature and included the use of standard EPA/HUD compliant XRF (X-Ray Fluorescence) testing methods to identify lead painted and/or lead containing (i.e., lead glazing) building components, which is defined by the EPA as greater than or equal to 1.0 mg/cm2 lead by surface loading (as tested by an XRF instrument), potentially impacted by planned construction activities. As expected, zero of the 33 surfaces tested were above the threshold of ≥1.0 mg/cm2, verifying that the presence of lead-based paint or building components is not an issue for The Project. A summary of lead testing efforts, including sample numbers, floor area, sample location, component, substrate, condition, color, and analytical results are presented in Table 2.

It is currently unknown if/where radiation shielding, i.e., lead shielding, is present in building construction. To determine the presence of such shielding, destructive methods requiring minor patching of materials may be necessary. This issue can be addressed if the evolving scope of work will impact possible shielding materials.

Mold Impacted Buildings Materials – Assessment & Inspection Results

Historical records have not been provided regarding known mold impacted building materials at the VA campus. No suspected mold growth was encountered during the inspection, nor were the environments typical of microbial colonization observed. Furthermore, areas likely impacted by The Project aren’t typically areas where such growth is anticipated.

Hazardous Materials Summary

No known asbestos-containing materials, mold, lead-based paint, or lead glazed components residing within the impacted buildings are documented in this narrative as effecting The Project.

The results are based both on historical data and the RSH field investigation on 11/16/2022.

• Any suspect asbestos containing materials observed prior to or during renovation or demolition that have not been previously analyzed should be sampled to determine asbestos content. All work should stop until unknown materials have been sampled and determined by an accredited lab if asbestos is present.

• Although no paint or components were found to be in excess of the ≥1.0 mg/cm2 threshold, small amounts of lead were detected as evidenced by readings between zero and less than ≥1.0 mg/cm2. Any activity that would impact components and/or paint must use proper PPE and engineering controls, including but not limited to, the establishment of a negative exposure assessment, proper housekeeping, and hygiene facilities. It is not recommended to torch, weld, or conduct similar activities which could create lead containing smoke &/or vapors.

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 4

• No conditions favoring the colonization and growth of mold were observed. No roof damage, water leakage, or drainage issues were observed or reported to the inspection team. Wet areas and chases were not typically a part of this inspection scope. If suspected mold growth is encountered, it should be reported to the COR immediately.

Riverfront appreciates the opportunity to assist with this project. It is our intent that this information will assist with project development at this phase. Please feel free to contact us with any questions or concerns.

Sincerely, May 19, 2023 Justin R. Rhyneer, CIH Date Principal

Table 1: Asbestos Bulk-Sampling Summary Table 2: Lead XRF Reading Summary

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

SUBJECT Environmental Narrative – Table 1

TABLE 1: ASBESTOS BULK SAMPLING SUMMARY

Field Sampling on November 16, 2022

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

E1

2’x 4’ Ceiling Tile – Light Texture -

White

Room 106 Friable Engineering Good - None

Detected

SH1798-

111622-

E2

2’x 4’ Ceiling Tile – Light Texture -

White

Room 106 Friable Engineering Good - None

Detected

SH1798-

111622-

E3

2’x 4’ Ceiling Tile – Light Texture -

White

Room 106 Friable Engineering Good - None

Detected

SH1798-

111622-

E4

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E5

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E6

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E7

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E8

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E9

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E9

Penetration Caulk on

Conduits - White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

E10

Penetration Caulk on

Conduits - White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

E11

Penetration Caulk on

Conduits - White

Room

CAT II

Non-

Friable Engineering Good - None

Detected

SH1798-

111622-

EC1

2’x 2’ Ceiling Tile - White

Room 104 Friable EC Good - None

Detected

SH1798-

111622-

EC2

2’x 2’ Ceiling Tile - White

Room 104 Friable EC Good - None

Detected

SH1798-

111622-

EC3

2’x 2’ Ceiling Tile - White

Room 104 Friable EC Good - None

Detected

SH1798-

111622-

EC4

Door Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC5

Door Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC6

Door Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC7

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC8

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC9

4” Cove Base

– Gray w/

Yellow Adhesive

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC10

Fireproof Caulk - Red

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC11

Fireproof Caulk - Red

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC12

Fireproof Caulk - Red

Room

CAT II

Non-

Friable EC Good - None

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 3

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

EC13

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC14

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC15

Drywall and Drywall Joint Compound -

White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC16

Drywall to CMU Wall

Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC17

Drywall to CMU Wall

Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

EC18

Drywall to CMU Wall

Caulk - White

Room

CAT II

Non-

Friable EC Good - None

Detected

SH1798-

111622-

M1

Door Frame Caulk - White

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M2

Door Frame Caulk - White

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M3

Door Frame Caulk - White

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M4

4” Cove Base

– Light Tan w/

Brown Adhesive

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M5

4” Cove Base

– Light Tan w/

Brown Adhesive

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M6

4” Cove Base

– Light Tan w/

Brown Adhesive

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M7

12”x 12” Floor Tile – White w/ Clear Mastic

Room 1B609

CAT II

Non-

Friable M Good - None

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 4

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

M8

Duct Seam Sealant - Gray

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M9

Duct Seam Sealant - Gray

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M10

Duct Seam Sealant - Gray

Room 1B609

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M11

Fireproof Caulk - Red

Room 1A024

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M12

Spray on Fireproofing -

Tan

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M13

Spray on Fireproofing -

Tan

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M14

Spray on Fireproofing -

Tan

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M15

Duct Seam Sealant – Dark Gray

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M16

Duct Seam Sealant – Dark Gray

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M17

Duct Seam Sealant – Dark Gray

Room 1A457

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M18

Wood Panel Texture - Gray

Room 2B310 Friable M Good - None

Detected

SH1798-

111622-

M19

Wood Panel Texture - Gray

Room 2B310 Friable M Good - None

Detected

SH1798-

111622-

M20

Wood Panel Texture - Gray

Room 2B310 Friable M Good - None

Detected

SH1798-

111622-

M21

4” Cove Base

– Gray w/

Yellow Adhesive

Room 2B310

CAT II

Non-

Friable

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 5

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

M22

4” Cove Base

– Gray w/

Yellow Adhesive

Room 2B310

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M23

4” Cove Base

– Gray w/

Yellow Adhesive

Room 2B310

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M24

Concrete Expansion

Foam - Black

Room 2A004 Friable M Good - None

Detected

SH1798-

111622-

M25

Concrete Expansion

Foam - Black

Room 2A004 Friable M Good - None

Detected

SH1798-

111622-

M26

Concrete Expansion

Foam - Black

Room 2A004 Friable M Good - None

Detected

SH1798-

111622-

M27

Spray on Fireproofing -

Gray

Room 2A18 Friable M Good - None

Detected

SH1798-

111622-

M28

Spray on Fireproofing -

Gray

Room 2A18 Friable M Good - None

Detected

SH1798-

111622-

M29

Spray on Fireproofing -

Gray

Room 3A063 Friable M Good - None

Detected

SH1798-

111622-

M30

Spray on Fireproofing -

Gray

Room 3A063 Friable M Good - None

Detected

SH1798-

111622-

M31

Spray on Fireproofing -

Gray

Room 3A063 Friable M Good - None

Detected

SH1798-

111622-

M32

Spray on Fireproofing -

Gray

Room 3A063 Friable M Good - None

Detected

SH1798-

111622-

M33

Penetration Caulk at Wall to Deck - Black

Room 4A041

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M34

Penetration Caulk at Wall to Deck - Black

Room 4A041

CAT II

Non-

Friable

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

Environmental - 6

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content

SH1798-

111622-

M35

Penetration Caulk at Wall to Deck - Black

Room 4A041

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M36

Pedestal Floor Caulk - Tan

Room 4A201

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M37

Pedestal Floor Caulk - Tan

Room 4A201

CAT II

Non-

Friable M Good - None

Detected

SH1798-

111622-

M38

Pedestal Floor Caulk - Tan

Room 4A201

CAT II

Non-

Friable M Good - None

Detected

Notes:

1) Positive ACM samples are noted in bold type.

2) An asbestos-containing material is defined as a material that contains greater than 1% asbestos.

3) A friable asbestos-containing material is a material that can be pulverized, crumbled, or reduced to powder by hand pressure.

Likewise, a non-friable asbestos-containing material is a material that cannot be pulverized, crumbled, or reduced to powder by hand pressure.

3) A friable asbestos-containing material is a material that can be pulverized, crumbled, or reduced to powder by hand pressure.

Likewise, a non-friable asbestos-containing material is a material that cannot be pulverized, crumbled, or reduced to powder by hand pressure.

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

TABLE 2: RSH LEAD XRF READING SUMMARY

Field Readings November 16, 2022.

Sample No.

Floor Area

Sample Location Side Component Substrate Condition Color Result

(mg/cm²) 4227 Cal 1

4228 Cal 1

4229 Cal 1

4230 Eng.

Floor 1 106 N/A Door Frame Metal Intact White 0.1

4231 Eng.

Floor 1 106 N/A Wall Drywall Intact Beige -0.1

4232 Eng.

Floor 1 106 N/A Wall Drywall Intact White -0.1

4233 Eng.

Floor 1 106 N/A Door Metal Intact Beige 0.1

4234 Eng.

Floor 1 106 N/A Floor Concrete Intact Gray 0.2

4235 Eng.

Floor 1 106 N/A Wall Wood Intact Gray 0

4236 Eng.

Floor 1 106 N/A Floor Sleeves Metal Intact Gray -0.1

4237 Energy Floor 1 104 N/A Wall CMU Intact White 0.1

4238 Energy Floor 1 Near 105 N/A Wall Drywall Intact White 0.1

4239 Energy Floor 1 104 N/A Door Frame Metal Intact Beige -0.2

4240 Energy Floor 1 104 N/A Door Metal Intact Beige 0

4241 Energy Floor 1 104 N/A Floor Concrete Intact Eggshell 0

4232 Eng.

Floor 1 106 N/A Wall Drywall Intact White -0.1

4233 Eng.

Floor 1 106 N/A Door Metal Intact Beige 0.1

4234 Eng.

Floor 1 106 N/A Floor Concrete Intact Gray 0.2

4235 Eng.

Floor 1 106 N/A Wall Wood Intact Gray 0

4236 Eng.

Floor 1 106 N/A Floor Sleeves Metal Intact Gray -0.1

4237 Energy Floor 1 104 N/A Wall CMU Intact White 0.1

4238 Energy Floor 1 Near 105 N/A Wall Drywall Intact White 0.1

4239 Energy Floor 1 104 N/A Door Frame Metal Intact Beige -0.2

757-22-705 (1791.19) EHRM Infrastructure Upgrades Tier 2

TABLE 2: RSH LEAD XRF READING SUMMARY

Field Readings November 16, 2022.

Sample No.

Floor Area

Sample Location Side Component Substrate Condition Color Result

(mg/cm²) 4240 Energy

Floor 1 104 N/A Door Metal Intact Beige 0

4241 Energy Floor 1 104 N/A Floor Concrete Intact Eggshell 0

4242 Energy Floor 1 104 N/A Structural

Beam Steel Intact White 0.3

4243 Energy Floor 1 104 N/A Panel Wood Intact White 0.1

4244 Energy Floor 1 104 N/A Sprinkler Line Metal Intact Red 0.1

4245 Main Floor 1 1B609 N/A Door Frame Metal Intact Beige 0

4246 Main Floor 1 1B609 N/A Door Metal Intact Beige 0.1

4247 Main Floor 1 1B609 N/A Wall Drywall Intact White 0

4248 Main Floor 1 1B609 N/A Panel Wood Intact White 0.1

4249 Main Floor 1 1B006 N/A Floor Concrete Intact Gray 0.1

4250 Main Floor 1 1B006 N/A Door Frame Metal Intact Beige -0.1

4251 Main Floor 1 1B006 N/A Panel Wood Intact White 0

4252 Main Floor 1 1A014 N/A Floor Concrete Intact Gray 0

4253 Main Floor 1 1A014 N/A Wall Drywall Intact White 0

4254 Main Floor 1 1A024 N/A Floor Concrete Intact Gray 0.2

4255 Main Floor 1 1A024 N/A Door Frame Metal Intact Beige 0.1

4256 Main Floor 1 1A024 N/A Conduit Metal Intact Red 0.1

4257 Main Floor 1 1A106 N/A Conduit Metal Intact White 0.2

4258 Main Floor 2 2B310 N/A Panel Wood Intact Gray 0

4259 Main Floor 2 2A018 N/A Floor Concrete Intact Gray 0

Notes:

1. Lead threshold established by EPA/HUD as 1.0 mg/cm2.

2. Items highlighted in bold italics, if any, indicate established threshold has been exceeded.

Columbus Env Narrative
Dates of construction for all three buildings were post 2008, far past the industry accepted cutoff date of 1978 for lead-based paint to be present in new construction. However, as a precaution, the two inspectors performed a thorough inspection to v...
It is currently unknown if/where radiation shielding, i.e., lead shielding, is present in building construction. To determine the presence of such shielding, destructive methods requiring minor patching of materials may be necessary. This issue can ...
Table 1
Table 2

File details come from the government source that posted it. Updated .