Attachment 4 - EHRM Columbus Drawings Part 2.pdf
PDF 7 MB Posted
- Attached to
- Y1DA--757-22-705 EHRM Infrastructure Upgrades - Columbus, OH - Tier 2 Construction (VA-22-00108764)
- Solicitation number
- 36C77623R0150
About this file
This document package includes construction drawings and specifications for infrastructure upgrades at the Chalmers P. Wylie VA Medical Center in Columbus, Ohio. The project involves replacing aging HVAC systems in several buildings with new ductless split systems, mini-split heat pumps, Liebert computer room air conditioners, and associated controls. Upgrades are also planned for the main computer room, including installation of a temporary cooling system, new raised floor supply air diffusers, reinforced return air ducts, fire dampers, and backdraft dampers. The scope of work entails demolition of existing equipment, installation of new indoor and outdoor units, routing of refrigerant lines, and integration with the existing JCI Metasys control system. Construction is scheduled to take place from May 2023 to June 2023.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TELECOM
3A0041
TELECOM
3A0151
TELECOM
3A0631
4A041
TELECOM
4A0411
SERVER/MAIN
TELECOM
4A201 2
BREAKDOWN
AREA
4A200
STORAGE
E-4A202
HAZARD CLASSIFICATION LEGEND
LIGHT HAZARD
(0.10 GPM/FT² OVER 1,500 FT² WITH
100 GPM EXTERIOR HOSE DEMAND)
ORDINARY HAZARD 1
(0.15 GPM/FT² OVER 1,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
ORDINARY HAZARD 2
(0.20 GPM/FT² OVER 1,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
TELECOM
TELECOM
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:1 :4
P
M
ENLARGED FIRE SUPPRESION HAZARD
CLASSIFICATION PLAN
SAB 29 OF 78BLS
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
06/02/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
FX403
SPUR #: 1791.19
N
1/4" = 1'-0"
LEVEL 3 - HAZARD CLASSIFICATION PLAN - 3A0045
N
1/4" = 1'-0"
LEVEL 3 - HAZARD CLASSIFICATION PLAN - 3A0154
N
1/4" = 1'-0"
LEVEL 3 - HAZARD CLASSIFICATION PLAN - 3A0633
N
1/4" = 1'-0"
LEVEL 4 - HAZARD CLASSIFICATION PLAN - 4A0412
N
1/4" = 1'-0"
LEVEL 4 - HAZARD CLASSIFICATION PLAN - 4A2011
SHEET KEYNOTES
MARK KEYNOTE
1 THIS TELECOMMUNICATION SPACE HAS BEEN DESIGNATED
AS AN ANSI/TIA-942-B RATING 1 SPACE/NON-MISSION
CRITICAL IN ACCORDANCE WITH VA FIRE PROTECTION
DESIGN MANUAL SECTION 3.7.C. A QUICK-RESPONSE TYPE
SPRINKLER IS REQUIRED TO BE INSTALLED TO PROTECT
THIS SPACE. THE SPACE IS CURRENTLY PROTECTED WITH
A QUICK-RESPONSE SPRINKLER. CONTRACTOR TO FIELD
VERIFY SPIRNKLER LOCATION DOES NOT CONFLICT WITH
NFPA 13 OBSTRUCTION REQUIREMENTS WITH NEW ROOM
LAYOUT.
2 CONTRACTOR TO PROVIDE NEW ISOLATION VALVE
ASSEMBLY TO DESIGNATE ROOM 4A201 AS SINGLE FIRE
SPRINKLER ZONE. CONTRACTOR TO COORDINATE THE
LOCATION OF THE FLOW AND TAMPER SWITCHES WITH THE
FIRE ALARM CONTRACTOR. VALVE ASSEMBLY SHALL BE
INSTALLED IN AN ACESSIBLE LOCATION OUTSIDE OF THE
SPACE. CONTRACTOR TO COORDINATE WITH VA
PERSONNEL ON LOCATION OF CONTROL VALVE FOR THIS
ZONE BEFORE WORK BEGINS. CONTRACTOR TO
COORDINATE WITH VA ON IMPAIRMENT OF FIRE SPRINKLER
SYSTEM DURING CONTRUCTION.
3 THIS TELECOMMUNICATION SPACE IS TO BE PROTECTED IN
ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN
MANUAL 8TH EDITION. THIS SPACE HAS BEEN DESIGNATED
A ANSI/TIA-942-B RATING 1/NON-MISSION CRITICAL IN
ACCORDANCE WITH THE OI&T DESIGN GUIDE VERSION 3.1.
SPRINKLERS IN THIS SPACE ARE TO BE STANDARD
RESPONSE TYPE, FUSIBLE-LINK WITH PROTECTIVE CAGES.
N
1/4" = 1'-0"
ENGINEERING BUILDING - HAZARD CLASSIFICATION PLAN - 1066
N
1/4" = 1'-0"
BOILER PLANT - HAZARD CLASSIFICATION PLAN - 1047
No. REVISION DESCRIPTION DATE
06/02/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
SERVER/MAIN
TELECOM
4A201
P S
R S
F A
C U c d
B c d
R
K M
V S
S O
V
C A c d
B c d
R
A S
D
CA FCA
F
15cd
B
15cd
R
F
15cd
B
15cd
R
CAF CA
15 ASD DETECTOR - DISABLE • • • •
• PERFORM OPERATION/REPORT DEVICE STATUS
A B C D E F G H I J K L M N N O P Q R S T U
9 MAINTENANCE SWITCH • • • •
10 SOLENOID SUPERVISORY SWITCH • • • •
11 ACTUATOR PLACEMENT INDICATOR • • • •
12 DISCHARGE PRESSURE SWITCH • • • • • • • •
13 LOW PRESSURE SWITCH • • • •
11 SCP AC POWER FAILURE • • •
12 SCP SYSTEM LOW BATTERY • • •
13 OPEN CIRCUIT OR GROUND FAULT • • •
14 CLASS B NOTIFICATION CIRCUIT (NAC) - SHORT • • •
15 LOCAL MANUAL ACTUATOR ON TANK • • • • • • • • • •
13 ASD DETECTOR - URGENT FAULT • •
14 ASD DETECTOR - MINOR FAULT • •
3 ASD DETECTOR - FIRE 1 - 1.0% OBS/FT (w/ 15 SECOND DELAY) • • • • • • • • 4 ASD DETECTOR - FIRE 2 - 3.0% OBS/FT (w/ 30 SECOND DELAY) • • • • • • • • •
5 COMPLETION OF 30 SECOND COUNTDOWN TIMER AFTER FIRE 2 • • •
6 ABORT SWITCH - CONTINUOUSLY HELD DOWN • • • •
7 MANUAL RELEASING PULL STATION • • • • • • • • •
8 AFTER 10 SECOND AGENT RELEASE DELAY • • •
AT 4007ES SCP NOTIFICATION AND FIRE SAFETY CONTROLS
S Y
S T
E M
O U
T P
U T
S
A C
T U
A T
E C
O M
M O
N A
L A
R M
S
IG
N A
L I
N D
IC
A
T O
R
A C
T U
A T
E A
U D
IB
L E
A L A
R M
S
IG
N A
L
A C
T U
A T
E C
O M
M O
N S
U P
E R
V
IS
O R
Y S
IG
N
A L I
N D
IC
A
T O
R
A C
T U
A T
E A
U D
IB
L E
S U
P E
R V
IS
O
R Y
S
IG
N A
L
A C
T U
A T
E C
O M
M O
N T
R O
U B
L E
S
IG
N A
L I
N D
IC
A
T O
R
A C
T U
A T
E A
U D
IB
L E
T R
O U
B L E
S
IG
N A
L
D
IS
P L A
Y C
H A
N G
E O
F S
T A
T U
S
T R
A N
S M
IT
A
L A
R M
S
IG
N A
L T
O M
A
IN
F A
C
IL
IT
Y
F A
C P
T R
A N
S M
IT
S
U P
E R
V
IS
O R
Y S
IG
N
A L T
O M
A
IN
I F
A C
IL
IT
Y F
A C
P
T R
A N
S M
IT
T
R O
U B
L E
S
IG
N A
L T
O M
A
IN
F A
C
IL
IT
Y
F A
C P
A C
T U
A T
E S
U P
P R
E S
S
IO
N B
E L L
A C
T U
A T
E S
U P
P R
E S
S
IO
N H
O R
N A
T
B
P M
A C
T U
A T
E S
U P
P R
E S
S
IO
N H
O R
N A
T S
T E
A D
Y T
O N
E
A C
T U
A T
E P
R E
-D
IS
C H
A R
G E
S T
R O
B E
A C
T U
A T
E S
U P
P R
E S
S
IO
N S
T R
O B
E
B E
G
IN
S
E C
O N
D C
O U
N T
D O
W N
A G
E N
T R
E L E
A S
E I
N T
O A
L L H
A Z
A R
D S
P A
C E
S
B E
G
IN
S
E C
O N
D A
G E
N T
R E
L E
A S
E D
E L A
Y
H V
A C
S H
U T
D O
W N
D A
M P
E R
C L O
S U
R E
S
IL
E N
C E
S S
U P
P R
E S
S
IO
N B
E L L
S T
O P
S F
IR
E
-S
E C
O N
D C
O U
N T
D O
W N
T
IM
E R
SYSTEM INPUTS A B C D E F G H I J K L M N N O P Q R S T U
1 ASD DETECTOR - ALERT - 0.2% OBS/FT (w/ 30 SECOND DELAY) • • • • 2 ASD DETECTOR - ACTION - 0.6% OBS/FT (w/ 30 SECOND DELAY) • • • •
AIM AIM
PS VS
AIM
CT
AIM
CT
AIM
CT
RSFACU
S U
P E
R V
IS
O
R Y
T R
O U
B L E
A L A
R M
SPD
120VAC DEDICATED
BRANCH CIRCUIT
s CA CA
B R
KM
SOV
CA
AIM
CT
AIM
CT
AIM
CT
A L E
R T
T R
O U
B L E
A L A
R M
AIM
CT
A L A
R M
ASD
s
ASD
ASPIRATING SMOKE
DETECTION SYSTEM
TO PRIMARY
POWER SUPPLY
SEE SHEET
FA-001 FOR
CONTINUATION
F
WARNING!
LEAVE AREA IMMEDIATELY
WHEN ALARM SOUNDS
NOVEC 1230
BEING RELEASED
WARNING!
THIS AREA IS PROTECTED BY A
NOVEC 1230 EXTINGUISHING
SYSTEM. DO NOT ENTER
WITHOUT AUTHORIZATION
DURING OR AFTER DISCHARGE.
PUSH
PULL
PUSH/HOLD
SUPPRESSION SYSTEM ABORT
FIRE
SUPPRESSION
MANUAL
RELEASE
FIRE
SUPPRESSION
ABORT
PUSH BUTTON
AND HOLD
CLEAN AGENT LEGEND
SYMBOL DESCRIPTION
F FIRE ALARM MANUAL PULL STATION
FIRE ALARM HORN/STROBE COMBINATION DEVICE
SUPPRESSION HORN
VS VALVE SUPERVISORY SWITCH
WF WATER FLOW SWITCH
AIM ADDRESSABLE INPUT MODULE
AOM ADDRESSABLE OUTPUT MODULE
SYMBOL MODIFIERS
WP
nCD
C
WEATHERPROOF
CANDELA RATING
CEILING MOUNTED
CA CLEAN AGENT MANUAL PULL STATION
CA CLEAN AGENT ABORT STATION
KM KEYED MAINTENANCE SWITCH
CLEAN AGENT DISCHARGE STROBEB
CLEAN AGENT PRE-DISCHARGE STROBER
s
ASD
ASPIRATING SMOKE DETECTOR
SOV
CA
CLEAN AGENT ACTUATOR
DISCRETE OUTPUT - DRY CONTACTCT
PS PRESSURE SWITCH
FACU FIRE ALARM CONTROL UNIT
ASPIRATING SMOKE DETECTOR CONTROL PANEL
SURGE PROTECTIVE DEVICE
ASD
SPD
RSFACU RELEASING SERVICE FIRE ALARM CONTROL UNIT
F
SUPPRESSION BELL
CLEAN AGENT TANK
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:1 :4
P
M
CLEAN AGENT NOTES, DETAILS, AND
PLAN
SAB 30 OF 78BLS
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
06/02/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
SH001
SPUR #: 1791.19
N
1/4" = 1'-0"
LEVEL 4 - CLEAN AGENT PLAN - 4A2011
SCALE: NONE
CLEAN AGENT INPUT/OUTPUT MATRIX5
CLEAN AGENT GENERAL NOTES:
1. PROVIDE A NEW CLEAN AGENT (NOVEC 1230) FIRE EXTINGUISHING
SYSTEM THAT IS DESIGNED AND INSTALLED IN ACCORDANCE WITH
NFPA 2001, 2022 EDITION.
2. CLEAN AGENT TO BE USED IS NOVEC 1230 (FK-5-1-12) AT MINIMUM
DESIGN CONCENTRATION OF 6.1%. MINIMUM 4.5% TO BE INCREASED
TO 6.1% WITH 1.25 SAFETY FACTOR IN ACCORDANCE WITH NFPA 2001.
3. ALL PIPE AND FITTINGS SHALL BE IN ACCORDANCE WITH THE
REQUIREMENTS OF NFPA 2001.
4. ALL PIPE AN FITTINGS SHALL BE BLACK SCALE FREE STEEL
CONFORMING TO ONE OF THE FOLLOWING REQUIREMENTS:
A. ASTM A-106, SEAMLESS, GRADE A OR B SCHEDULE 40 THROUGH
8 INCHES
B. ASTM A-53, SEAMLESS, GRADE A OR B SCHEDULE 40 THROUGH 8
INCHES
C. ASTM A-53 ERW, GRADE A OR B SHALL NOT BE USED WITHOUT
PRIOR WRITTEN APPROVAL FROM AHJ.
D. ASTM A-53, CLASS F AND ASTM A-120 SHALL NOT BE USED.
5. STENCILED PIPE IDENTIFICATION SHALL NOT BE PAINTED OVER,
CONCEALED OR REMOVED PRIOR TO APPROVAL BY AHJ.
6. ALL FITTINGS SHALL BE BLACK MALLEABLE IRON OR FORGED STEEL
CONFORMING TO THE FOLLOWING REQUIREMENTS:
A. CLASS 300 MALLEABLE IRON THROUGH 3 INCHES
B. 1000# RATED FORGED STEEL GREATER THAN 3 INCHES
C. ALL GROOVED FITTINGS MUST BE UL LISTED AND CONFORM TO
THE PRESSURE REQUIREMENTS OUTLINED IN NFPA 2001
D. CAST IRON FITTINGS ARE NOT ACCEPTABLE.
7. ALL PIPE ENDS SHALL BE REAMED AFTER CUTTING.
8. EACH PIPE SECTION SHALL BE CLEANED INTERNALLY AFTER
PREPARATION AND BEFORE ASSEMBLY BY SWABBING WITH A
SUITABLE NONFLAMMABLE CLEANER.
9. TEFLON THREAD SEAL TAPE SHALL BE USED ON ALL MALE THREADED
JOINTS ONLY. ALL GROOVED COUPLING GASKETS SHALL BE
LUBRICATED PER THE MANUFACTURER'S SPECIFICATIONS.
10. ALL PIPING SHALL BE RIGIDLY AND SECURELY ANCHORED TO
BUILDING STRUCTURE USING U.L. APPROVED HANGERS. CONTRACTOR
TO PROVIDE SESIMIC BRACING, SITE IS CLASSIFIED AS SEISMIC
DESIGN CATEGORY "C". REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
11. ALL STORAGE CONTAINERS SHALL BE MOUNTED PLUMB AND LEVEL
AND SECURELY ANCHORED TO BUILDING STRUCTURE.
12. REFER TO ARCHITECTURAL SIGNAGE DETAILS FOR MATERIAL, FINISH
COLOR, ETC. OF CLEAN AGENT SIGNAGE AND START/STOP STATIONS.
SAMPLING PIPE NETWORK REQUIREMENTS (ASD):
1. ALL PIPING SHALL BE CPVC.
2. ATTACH PIPES TO STRUCTURE AS APPLICABLE, USING STANDARD
PIPE SECURING HARDWARE AT INTERVALS OF NO MORE THAN 5 FEET.
3. ALL CONNECTIONS AND JOINTS SHALL BE MADE WITH STANDARD
CONNECTIONS DESIGNED TO BE COMPATIBLE WITH PIPE MATERIAL.
4. ALL JOINTS SHALL BE AIR TIGHT TO PREVENT INFILTRATION AT OTHER
THAN SAMPLING PORT LOCATIONS.
5. COORDINATE THE LOCATION OF PIPING AND SAMPLING PORTS WITH
OTHER TRADES TO PERMIT PROPER ACCESS TO ALL EQUIPMENT.
6. THE SAMPLING PIPE NETWORK SHALL BE CLEARED OF ALL DIRT AND
DEBRIS BY RUNNING AIR THROUGH THE PIPE NETWORK FOR A
MINIMUM OF 30 MINUTES PRIOR TO CONNECTION AND OPERATION OF
THE SYSTEM.
7. ALL PIPING SHALL BE LABELED AT EACH SAMPLING PORT AND AT 20
FOOT INTERVALS USING MANUFACTURERS IDENTIFICATION LABELS.
8. DO NOT GLUE PIPE(S) INTO SOCKET(S) OF INLET MANIFOLD. PIPES
MUST BE INSERTED INTO THE SOCKET(S) AT A MINIMUM OF 1/2 INCH.
9. SENSITIVITY SETTINGS SHOWN IN THE MATRIX SHALL BE ACHIEVED AT
EACH SAMPLING PORT.
SCALE: NONE
CLEAN AGENT TYPICAL RISER DIAGRAM4
SCALE: NONE
CLEAN AGENT SIGNAGE3
SCALE: NONE
CLEAN AGENT START/STOP STATIONS2
SHEET KEYNOTES
MARK KEYNOTE
1 SPACE TO BE PROTECTED WITH A CLEAN AGENT
FIRE EXTINGUISHMENT SYSTEM. AIR-ASPIRATING
SMOKE DETECTION SAMPLING PORTS TO BE
PROVIDED THROUGHOUT SCOPE OF WORK AREA.
CALCULATION AND SYSTEM DESIGN ARE BASED ON F-K-5-1-12.
THE SYSTEM IS DESIGNED TO EXTINGUISH A SINGLE FIRE.
THE SYSTEM IS DESIGNED FOR TOTAL FLOODING.
HAZARD CLASSIFICATION: CLASS C
MINIMUM DESIGN CONCENTRATION: 4.5% (NFPA 2001, TABLE A.7.2.2.3(b))
MINIMUM ANTICIPATED TEMPERATURE: 70F
ELEVATION: APPROX. 31FT.
EQUIVALENT ALTITUDE: 0 FT.
(C) AGENT REQUIRED AT 70F: 0.04075 LBS/FT3 (NFPA 2001, TABLE A.7.3.1(a))
(A) ATMOSPHERIC CORRECTION FACTOR 1.00
**ALL AGENT QUANTITIES ARE ESTIMATED MINIMUM QUANTITIES AND ASSUME ROOM
INTEGRITY WITH NEGLIGIBLE AGENT LEAKAGE.**
PROTECTED SPACE: SERVER/MAIN TELECOM ROOM 4A201
RAISED FLOOR: NONE
AREA (A): 1066.96 SQ. FT.
HEIGHT (H): 8'-10 5/16"
(V) SPACE VOLUME
V=(A)(H)
V=9452 CU. FT.
(W) TOTAL DESIGN QUANTITY:
W=(V)(C)(A) W=(9452)(.04075)(1.00)
TOTAL DESIGN QUANTITY:385.2 LBS.
No. REVISION DESCRIPTION DATE
06/02/2023
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
ABBREVIATIONS
HVAC PIPING TYPES
GENERAL DUCT SYMBOLS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
A
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
FSD COMBINATION FIRE / SMOKE DAMPER
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIONALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
H
HU HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPC HIGH PRESSURE STEAM CONDENSATE RETURN
HPS HIGH PRESSURE STEAM (61-300 PSIG)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HC HOT WATER HEATING COIL
HHP HEATING HOT WATER PUMP
HHR HEATING HOT WATER RETURN
HHS HEATING HOT WATER SUPPLY
HHUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPC LOW PRESSURE STEAM CONDENSATE RETURN
CLPC LOW PRESSURE STEAM CONDENSATE (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM (0-15 PSIG)
CLPS LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
M
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPC MEDIUM PRESSURE STEAM CONDENSATE
RETURN
MPS MEDIUM PRESSURE STEAM (16-60 PSIG)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OSD ORGANIC SOIL FILTER
Q
Q INTENTIONALLY LEFT BLANK
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
DSD DUCT SMOKE DETECTOR
SD SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
T
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
U
X INTENTIONALLY LEFT BLANK
W
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFM WATER FLOWMETER
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
X
V
GENERAL NOTES:
A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE
SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY
FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.
C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT
DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS
ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS
COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND
NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR
INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.
D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION
"PAINTING".
E. COORDINATE FAN COIL (FCU) AND TERMINAL UNIT (TU/VAV/CV) REHEAT COIL RIGHT OR
LEFT HAND COIL CONNECTIONS WITH PIPING PLANS.
F. ALL FLUE AND COMBUSTION AIR PIPING FROM GAS-FIRED EQUIPMENT SHALL BE SIZED BY
THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND
ELEVATIONS FOR THIS PROJECT. REFER TO MANUFACTURERS INSTALLATION MANUAL AND
LOCAL CODE REQUIREMENTS FOR REQUIRED FLUE AND COMBUSTION AIR PIPING
MATERIALS.
G. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
H. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN
50' OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM
MAINS WITHIN 50' OF BOILER OR PRESSURE REDUCING VALVES.
I. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
J. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
K. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
L. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
M. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
CWR
CWS
CD
LPC
LPS
MPC
MPS
HPC
HPS
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
HIGH PRESSURE STEAM CONDENSATE
HIGH PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE
MEDIUM PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM SUPPLY
VACUUM RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
CONTINUOUS BLOWDOWN
CHEMICAL FEED
BOILER BLOWOFF BO
CF
CBD
FWPD
FWPS
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE
PIPING AND TO THE INVERT OF ALL GRAVITY PIPING.
C. MAINTAIN A MINIMUM OF 3′-6″ OF GROUND COVER OVER ALL UNDERGROUND HVAC PIPING
(EDIT DEPTH OF GROUND COVER TO SUIT FROST LINE DEPTH AND PROJECT
REQUIREMENTS).
D. UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE
3/4" SIZE (EDIT SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).
E. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED
WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT
PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
F. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
G. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
H. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT
OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.
I. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION
INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
J. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED
GREATER THAN 7′-0″ ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7′-0″ ABOVE FLOOR
LEVEL.
K. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.
L. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
M. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.
PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW
1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH
BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.
N. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER
FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE
ONE SIZE LARGER THAN NOTED.
O. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME
DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY
FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE
EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.
C. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN
THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN
THE SAME FIXTURE.
D. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4′-0″
(CENTERLINE) ABOVE FINISHED FLOOR.
E. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.
F. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING
THICKNESS.
G. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST
SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES
THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH
TURNING VANES.
H. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
I. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE
ARRANGED FOR REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS.
PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST
COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.
J. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.
K. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME,
CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT
HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
L. FINNED TUBE RADIATION ENCLOSURES SHALL BE WALL TO WALL UNLESS OTHERWISE
INDICATED.
M. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND
EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE
POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:
EXISTING TO BE DEMOLISHED
LIMIT OF DEMOLITION
CONNECT NEW TO EXISTINGEXISTING TO REMAIN
NEW DUCT (INSIDE DIMENSIONS: W" X D")
RS
RL
REFRIGERANT SUCTION
REFRIGERANT LIQUID
SUPPLY AIR DUCT UP
SUPPLY AIR DUCT DOWN
H
T
H
T
26-P-3
MH-100
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DETAIL NUMBER
SHEET NUMBER
SHEET NUMBER
SECTION NUMBER
THERMOSTAT
HUMIDISTAT
TEMPERATURE SENSOR
HUMIDITY SENSOR
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
26-DS-100-A
ROOM NUMBER (ROOM NO. 100)
ITEM (DUCTLESS SPLIT)
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
UNIT IDENTIFIER
DUCTLESS SPLIT UNIT TAG
MECHANICAL EQUIPMENT TAG
1 OWNER FURNISHED, CONTRACTOR
INSTALLED EQUIPMENT DESIGNATION
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
NEW PIPE
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
GENERAL PIPING SYMBOLS
GENERAL ANNOTATIONS
AV
STRAINERFLOAT & THERMOSTATIC
STEAM TRAP
INVERTED BUCKET
STEAM TRAP
FLANGE CONNECTION PIPE DROP
PIPE RISER TEE DOWN
TEE UP
UNION
PRESSURE REDUCING
VALVE
BALL VALVE
ANGLE GLOBE VALVE
SAFETY RELIEF VALVE
GLOBE VALVE
MANUAL OR
AUTOMATIC AIR VENT
EXPANSION JOINT
EJ
PRESSURE AND
TEMPERATURE TEST PLUG
QUICK-COUPLE HOSE
CONNECTOR
FLOW METER
HVAC PIPING SYMBOLS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHR
CHS
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
HHR
HHS QV CRYOGEN VENT
DR DRIP RETURN
CAP
REDUCER (ECCENTRIC)
TYPE
AIRFLOW (CFM)
SD-1
TYPE
AIRFLOW (CFM)
RG-1
TYPE
AIRFLOW (CFM)
EG-1
SQUARE TO ROUND TRANSITION
ELBOW WITH TURNING
VANES
ROUND ELBOW
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT DOWN
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT UP
RETURN DUCT DOWN
RETURN DUCT UP
BRANCH DUCT WITH HIGH EFFICIENCY
TAKE-OFF (HETO) BRANCH FITTING &
MANUAL VOLUME DAMPER
BRANCH DUCT WITH CONICAL
FITTING & MANUAL VOLUME
DAMPER
DAMPERS: (BD, FD, FSD, MD, SD, VD)
BD
XX-XX
ANCHOR
TEEDIRECTION OF FLOW
S
N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND
LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL
BE 4". PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4" ON EACH SIDE.
CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT
SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE
AND LOCATION OF CONCRETE HOUSEKEEPING PADS.
O. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS SUB-CONTRACTED, IT
SHALL BE THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO COORDINATE
SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL
CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR
ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
P. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
Q. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN
IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL
BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
R. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED
TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED
MECHANICAL EQUIPMENT.
S. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL
BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS
MEETING MSS STANDARDS.WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
T. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL
CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. COORDINATE
INSTALLATION WITH GENERAL CONTRACTOR.
U. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
V. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.
W. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND
ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P-TRAP, AND
PIPED TO NEAREST DRAIN. SEE DETAILS AND SPECIFICATIONS FOR DEPTH OF AIR
CONDITIONING CONDENSATE TRAP.
X. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
P. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE
DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,
RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE
REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.
Q. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP
LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE
DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO
THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.
R. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.
S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
U. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
V. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
W. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS,
CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE
TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
X. SLOPE REFRIGERANT PIPING ONE PERCENT IN THE DIRECTION OF OIL RETURN. LIQUID
LINES MAY BE INSTALLED LEVEL.
Y. INSTALL HORIZONTAL REFRIGERANT HOT GAS DISCHARGE PIPING WITH 1/2″ PER 10'
DOWNWARD SLOPE AWAY FROM THE COMPRESSOR.
Z. INSTALL HORIZONTAL REFRIGERANT SUCTION LINES WITH 1/2″ PER 10' DOWNWARD SLOPE
TO THE COMPRESSOR, WITH NO LONG TRAPS OR DEAD ENDS WHICH MAY CAUSE OIL TO
SEPARATE FROM THE SUCTION GAS AND RETURN TO THE COMPRESSOR IN DAMAGING
SLUGS.
AA. PROVIDE LINE SIZE LIQUID INDICATORS IN MAIN LIQUID LINE LEAVING CONDENSER OR
RECEIVER. INSTALL MOISTURE LIQUID INDICATORS IN LIQUID LINES BETWEEN FILTER
DRYERS AND THERMOSTATIC EXPANSION VALVES AND IN LIQUID LINE TO RECEIVER.
BB. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF
VALVE ON EACH SIDE OF STRAINER.
CC. PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS
USING HERMETIC COMPRESSORS.
DD. PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE-WAY VALVE BYPASS A
ASSEMBLY FOR SOLENOID VALVES, ADJACENT TO RECEIVERS.
EE. PROVIDE REFRIGERANT CHARGING VALVE CONNECTIONS IN LIQUID LINE BETWEEN
RECEIVER SHUTOFF VALVE AND EXPANSION VALVE.
N. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF
THE STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.
M. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.
O. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
P. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE
DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS,
AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRE SERVICE AND/OR
INSPECTION.
Q. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND
MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.
R. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO
BOTH THE EQUIPMENT AND THE DUCT.
S. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR.
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE
DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH
MANUFACTURER’S PRINTED INSTRUCTIONS.
T. TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS
WASHER, HIGH PRESSURE CLEANER, AND OTHER GAS APPLIANCES A MINIMUM OF 3′-0″
ABOVE ROOF WITH RAIN CAP (NOTE TO DESIGNER: EDIT APPLIANCES AND HEIGHT ABOVE
ROOF TO MEET CODE AND TO SUIT PROJECT REQUIREMENTS).
U. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER
REQUIREMENTS.
V. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE COORDINATED WITH
OTHER TRADES INVOLVED. REFER TO ARCHITECTURAL SPECIFICATIONS FOR DETAILED
DESCRIPTIONS.
DIRECTION OF PIPE
PITCH (DOWN)
FM
MV
HVAC VALVE SYMBOLS
PC PUMPED CONDENSATE
ROOM TAG
FLEXIBLE CONNECTOR
PUMP
REDUCER (CONCENTRIC)
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
THERMOMETER
PRESSURE GAUGE
STRAINER WITH BLOWOFF
AND HOSE CONNECTION
YR YEAR
Y
Z INTENTIONALLY LEFT BLANK
Z
M
CONTROL VALVE
CONTROL VALVE, THREE WAY
MOTOR CONTROLLED
VALVE
M
M
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
A. MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND REMOVED AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS AS REQUIRED. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE ENGINEER OF RECORD IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL COST.
B. DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK REQUIRED TO KEEP
NON-SCOPE AREAS IN OPERATION. COORDINATE UTILITY SHUT-OFFS AND TEMPORARY POWER,
STORAGE, AND ACCESS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTOR AND COR.
C. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL REQUIRE ISOLATION OF EXISTING PIPING BRANCHES AND/OR MAINS USING SHUTOFF VALVES. INSTALL NEW ISOLATION VALVES AS REQUIRED TO
COMPLETION DEMOLITION WORK.
D. REMOVAL OF EXISTING PLUMBING FIXTURES AND EQUIPMENT WILL REQUIRE CAPPING AND SEALING EXISTING MAINS OR BRANCHES, WITHOUT LEAVING DEAD LEGS, TO KEEP REMAINING SYSTEMS IN OPERATION. THE CONTRACTOR SHALL PROVIDE PROTECTIVE MEASURES TO PROTECT THE EXISTING
OCCUPIED AREAS AND EQUIPMENT DURING THE CONSTRUCTION WORK. THE CONTRACTOR SHALL
CLEAN THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE WORK.
E. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED AND PROPERLY VENTED BY THE
CONTRACTOR ONCE NEW WORK HAS BEEN COMPLETED.
F. COORDINATE REMOVAL, REPLACEMENT, AND/OR REPAIRS OF ANY EXISTING WALLS, CEILING, ETC.
REQUIRED FOR MECHANICAL DEMOLITION WORK WITH GENERAL CONTRACTOR.
G. PROVIDE TIGHTLY SEALED AND INSULATED TERMINATIONS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT REMOVED FROM THE PROJECT. THERE SHALL BE NO "DEAD LEG" SECTIONS OF PIPING
WHERE WATER CAN SIT AND BECOME STAGNANT.
H. REFER TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR INSTRUCTIONS REGARDING THE
REMOVAL AND RETURN OR DEMOLITION OF EXISTING EQUIPMENT AND FIXTURES.
I. PORTIONS OF EXISTING SYSTEMS ARE SHOWN FOR CLARITY AND MAY NOT BE NECESSARY TO MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE SHOWN BASED ON AVAILABLE AS-BUILT DRAWINGS AND SITE SURVEYS OF ACCESSIBLE AREAS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS.
J. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE TO ENSURE THE LEAST AMOUNT OF DISRUPTION OF BUILDING ACTIVITIES AS
POSSIBLE.
K. ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK SHALL BE REMOVED AND PROPERLY DISPOSED
OF.
L. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE TO
EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
GENERAL DEMOLITION NOTES:
DS DUCTLESS SPLIT UNIT
ROOM NAME
000A
150 SF
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
CONTROLLED UNCLASSIFED INFORMATION (CUI)
CONTROLLED UNCLASSIFED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
E D
I N
F O
R M
A T
IO
N
C
U I)
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:3 :2
P
M
LEGEND AND ABBREVIATIONS
BAJ 31 OF 78JRM
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
05/19/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
M-000
1, ENERGY, & ENGINEERING
No. REVISION DESCRIPTION DATE
M-401
M-401
M-401
M-401
M-401
M-401
M-401
M-401
M-402
M-402
M-401
M-401
M-401
M-401
TELECOM
1A014
TELECOM
1A457
TELECOM
1A024
TELECOM
1A106
TELECOM
1B002
TELECOM
1B609
TELECOM
1B006
M-403
M-403
M-402
M-402
M-402
M-402
M-402
M-402
M-402
M-402
M-402
M-402
TELECOM
2A004
TELECOM
2A143
TELECOM
2A018
TELECOM
2B102
TELECOM
2B310
TELECOM
2B003 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
CONTROLLED UNCLASSIFED INFORMATION (CUI)
CONTROLLED UNCLASSIFED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
E D
I N
F O
R M
A T
IO
N
C
U I)
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:3 :2
P
M
REFERENCE PLANS - BLDG 1 - LEVELS 1
& 2
BAJ 32 OF 78JRM
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
05/19/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
M-101
1, ENERGY, & ENGINEERING
N
1" = 40'-0"
BLDG 1 - LEVEL 1 - REFERENCE PLAN1
N
1" = 40'-0"
BLDG 1 - LEVEL 2 - REFERENCE PLAN2
KEYNOTES
1 EXISTING MECHANICAL SYSTEMS TO BE DEMOLISHED AND REPLACED WITH NEW COOLING ONLY DUCTLESS SPLIT-SYSTEM.
REFER TO ENLARGED PLANS FOR MORE INFORMATION.
DN
VD
M-403
M-403
M-403
M-403
M-403
M-403
2B-CU-003
1B-CU-006
1B-CU-609
2B-CU-3101A-CU-106
2A-CU-143
3A-CU-063
4A-CU-041
TELECOM
3A004
TELECOM
3A063
TELECOM
3A015
2B-CU-102
1B-CU-002
M-403
M-403
M-406
2 1A-CU-014
2A-CU-018
3A-CU-0153A-CU-004
2A-CU-004
1A-CU-024
1A-CU-457 8
M-406
M-404
M-404
M-404
SERVER/MAIN TELECOM
4A201
TELECOM
4A041
M-406
M-406
TELECOM
M-406
M-406
TELECOM
ENE-CU-104 8
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
CONTROLLED UNCLASSIFED INFORMATION (CUI)
CONTROLLED UNCLASSIFED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
E D
I N
F O
R M
A T
IO
N
C
U I)
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:3 :2
P
M
REFERENCE PLANS - BLDG 1 - LEVELS 3
& 4, ENERGY, & ENGINEERING
BAJ 33 OF 78JRM
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
05/19/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
M-102
1, ENERGY, & ENGINEERING
N
1" = 40'-0"
BLDG 1 - LEVEL 3 - REFERENCE PLAN1
N
1" = 40'-0"
BLDG 1 - LEVEL 4 - REFERENCE PLAN4
KEYNOTES
1 EXISTING MECHANICAL SYSTEMS TO BE DEMOLISHED AND REPLACED WITH NEW COOLING ONLY DUCTLESS SPLIT-SYSTEM.
REFER TO ENLARGED PLANS FOR MORE INFORMATION.
4 EXISTING MECHANICAL SYSTEMS TO REMAIN IN PLACE AND BE REUSED.
8 CONTRACTOR SHALL INSTALL NEW OUTDOOR CONDENSING UNIT IN THE LOCATION SHOWN. ENSURE THE UNIT HAS SUFFICIENT CLEARANCE SPACE, IS MOUNTED PROPERLY, AND IS PROTECTED AS NECESSARY. ROUTE AND CONNECT REFRIGERANT PIPING
TO THE ASSOCIATED INDOOR UNIT(S) AS SHOWN AND PER MANUFACTURER INSTRUCTIONS.
N
1" = 40'-0"
ENERGY BLDG - LEVEL 1 - REFERENCE PLAN2
N
1" = 40'-0"
ENGINEERING BLDG - LEVEL 1 - REFERENCE PLAN5
N
1" = 40'-0"
ENERGY BLDG - LEVEL 2 - REFERENCE PLAN3
D1
D3
D6
CD RL
RS
TELECOM
1A014
1A-DS-014-B2
1A-DS-014-A2
TELECOM
1A014
RS
RL
RL
RS Y-BRANCH
SELECTOR
D1
D3
D6
D4
VAV TSTAT
8"x8" SA
RL
RS
TELECOM
1A024
1A-DS-024-A
1A-DS-024-B
8"x8" SA
VAV TSTAT
TELECOM
1A024
Y-BRANCH
SELECTOR
3/4" RL
3/4" RS
RS
RL
D6
D1
D3
12"x10" SA
D4
VAV TSTAT
VAV
12"ø SA
TELECOM
1A106
3/4" RS
3/4" RL
12"x10" SA
VAV
VAV TSTAT
1A-DS-106-A
1A-DS-106-B
12"ø SA
TELECOM
1A106
Y-BRANCH
SELECTOR
"x
S A
10"x10" SA
RS
RL
FCU
FCU TSTAT
D2
D4
D6
TELECOM
1A457
10"x10" SA
"x
S A
1A-DS-457-B
1A-DS-457-A2
TELECOM
1A457
Y-BRANCH
SELECTOR
18"x8" RA
12"x10" SA
8"ø SA
VAV
VAV TSTAT
D812"ø SA
TELECOM
1B002
18"x8" RA
1B-DS-002-B
1B-DS-002-A
12"x10" SA
8"ø SA
VAV
VAV TSTAT
12"ø SA
TELECOM
1B002
Y-BRANCH
SELECTOR
20"x14" SA
VAV TSTAT
10"ø SA
TELECOM
1B006
20"x14" SA
VAV TSTAT1B-DS-006-A
1B-DS-006-B2
TELECOM
1B006
Y-BRANCH
SELECTOR
RS
RL
RS
RL
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project NumberCONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH FIRM REG. NO. 20314270 EXP. 06/30/2023
ENGR FIRM REG. NO. 06253 EXP. 06/30/2024
FIRE PROTECTION ENGR
POOLE FIRE PROTECTION
19910 WEST 161ST ST.
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT (RSH)
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
STRUCT ENGR
STAND (SEI)
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
COMMISSIONING
ES2
13401 N SANTE FE AVE
OKLAHOMA CITY, OK
(405) 528-4500
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
CONTROLLED UNCLASSIFED INFORMATION (CUI)
CONTROLLED UNCLASSIFED INFORMATION (CUI)
C O
N T
R O
L L
E D
U N
C L
A S
S
IF
E D
I N
F O
R M
A T
IO
N
C
U I)
TELECOMMUNICATION
ASPEN COMMUNICATIONS
7 KIJI-DAVA CIRCLE, STE A
PRESCOTT, AZ 86301
(928) 774-0992
MECH / ELEC / PLUMB ENGR
SPUR DESIGN
2519 MADISON AVENUE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
PHYSICAL SECURITY
/1
/2
:3 :2
P
M
ENLARGED PLANS - BLDG 1 - LEVEL 1
BAJ 34 OF 78JRM
FINAL BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADE - TIER 2
05/19/2023
757-22-705
CHALMERS P. WYLIE VA
420 NORTH JAMES ROAD
COLUMBUS, OHIO 43219-1834
M-401
1, ENERGY, & ENGINEERING
1/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A014 - DEMO11/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A014 - NEW21/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A024 - DEMO31/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A024 - NEW4
1/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A106 - DEMO51/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A106 - NEW61/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A457 - DEMO71/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1A457 - NEW8
1/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1B002 - DEMO91/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1B002 - NEW101/4" = 1'-0"
BLDG 1 - LEVEL 1 - 1B006 - DEMO111/4" = 1'-0"
BLDG 1 -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .