Attachment 12 - 09_Narrative_Telecom.pdf

PDF 755 KB Posted

Attached to
Y1DA--757-22-705 EHRM Infrastructure Upgrades - Columbus, OH - Tier 2 Construction (VA-22-00108764)
Solicitation number
36C77623R0150
Issued by

About this file

This narrative document outlines the scope of work for a telecommunications infrastructure upgrade project at a Department of Veterans Affairs medical center in Columbus, Ohio. The project involves replacing outdated Category cabling and equipment across multiple buildings on the medical center campus, including the main hospital building, an engineering building, and an energy center building. Key aspects of the scope of work include demolishing existing cabling and installing new Category 6A cabling to all areas and telecommunications rooms, installing fiber optic cabling between buildings, upgrading server room infrastructure, and carefully coordinating all work with the VA and hospital departments to minimize disruptions. The project will require phased work during nights, weekends, and off-hours as many circuits must remain active. Proper safety protocols will need to be followed when working in occupied areas.

View the file

Other files

File Type Posted
Amd 11 Att - RFI Responses_3.12.24.pdf PDF
36C77623R0150 0011.docx DOCX document
36C77623R0150 0010.docx DOCX document
Amd 10_1791.19 - RFI Responses_3.11.24.pdf PDF
Amd 10 23 07 11 HVAC and Boiler Plant Insulation2.pdf PDF
36C77623R0150 0009.docx DOCX document
36C77623R0150 0008.docx DOCX document
OIT Infrastructure Standard for Telecommunications Spaces - Version 3.1.pdf PDF
36C77623R0150 0007.docx DOCX document
Amendment 6 All Files.zip ZIP file
36C77623R0150 0006.docx DOCX document
36C77623R0150 0005.docx DOCX document
36C77623R0150 0004.docx DOCX document
757-22-705 Pre-Bid Site Visit Sign In.pdf PDF
04_Architectural.pdf PDF
36C77623R0150 0003.docx DOCX document
02_Hazardous Materials.pdf PDF
01_General.pdf PDF
06_Mechanical_Drawings.pdf PDF
07_Electrical.pdf PDF
03_Structural.pdf PDF
08_Telecom.pdf PDF
05_Fire Protection.pdf PDF
Columbus EHRM FINAL SPECS VOL 1.pdf PDF
Columbus EHRM FINAL SPECS VOL 2.pdf PDF
36C77623R0150 0002.docx DOCX document
36C77623R0150 0001.docx DOCX document
Attachment 15 -Site Visit Instructions Revised.docx DOCX document
Attachment 11 - 07_Narrative_Electrical.pdf PDF
Attachment 9 - 05_Narrative_Fire Protection.pdf PDF
Attachment 6 - 01_Narrative_Architectural.pdf PDF
Attachment 2 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 13- Wage Rates.pdf PDF
Attachment 8 - 03_Narrative_Structural (1).pdf PDF
Attachment 15 -Site Visit Instructions.docx DOCX document
36C77623R0150_1.docx DOCX document
Attachment 14 - EHRM FULL SET 07122023.pdf PDF
Attachment 4 - EHRM Columbus Drawings Part 2.pdf PDF
Attachment 16- VA Engineering Map.pdf PDF
Attachment 3 - EHRM Columbus Drawings Part 1.pdf PDF
Attachment 10 - 06_Narrative_Mechanical.pdf PDF
Attachment 1- Limitations on Subcontracting - Construction.docx DOCX document
Attachment 5 - EHRM Columbus Drawings Part 3.pdf PDF
Attachment 7 - 02_Narrative_Environmental.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

SUBMITTAL Final Bid Documents SUBJECT Narrative – Telecommunications

Telecommunications - 1

Telecommunications Design

Project Overview and Background

Following is a description of work to be performed for the Data Communications and Structured Cabling systems in this project.

The main areas of work for this project are:

1. Buildings:

1.1. 1A

1.2. Engineering

1.3. Energy Center

2. Demolition of the old Category cabling, associated Outlet Faceplates, Jacks, and Patch Panels. If the Patch Panel is populated with Category cabling for other critical systems Leave in place or coordinate punch-down to a new patch panel.

3. Installation of UTP cabling (Cat6A) to all areas.

4. TRs: BLDG 1A: 4A201, 4A041, 3A004, 3A063, 3A015, 2A004, 2A143, 2A018, 2B102, 2B003, 2B310, 1A457, 1A024, 1A106, 1A014, 1B002, 1B006, 1B609. BLDG Eng: 106.

BLDG EC: EC104.

5. SR/MCR/DC: BLDG 1A: 4A201

NOTE: Be aware that above ceiling near 1A014, 1A106, 2B102 & 2A143 is highly congested with utilities. Contractor will most likely not be able to install new 4” Sleeves in these TRs, and will have to phase new cable installation/old cable removal carefully.

Design Criteria

OEHRM Site Infrastructure Requirements

ISTS (Latest iteration)

TIA-568, 569, 942.

TR and General construction phasing and nightwork.

All construction phasing shall be coordinated with the VA as regards to work times for day, night and weekend work. Contractor to coordinate with VA AHJ for code and life safety related measures associated with phasing of demolition and construction work in order to maintain life safety measures. Coordinate work with hazardous materials contractor to ensure that any area identified to have asbestos or lead paint is properly handled. If walls contain lead paint or asbestos plaster -contractor to provide abatement procedures as necessary for this room and adjacent spaces.

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 2

The following construction phasing description shall be incorporated into the proposed construction schedule and phasing for use in preparing the construction cost estimate.

This project involves working in and re-configuring mostly occupied and active data closets and spaces. New data cabling will be installed to replace or augment existing locations in occupied areas. Reuse existing data drop locations wherever possible. In addition, because it is a hospital, most circuits are considered critical and cannot be interrupted at random.

Coordinate scheduling and hours of work with facilities and OIT personnel. Some work may need to be performed after normal working hours and/or on weekends. Provide 14 days advance notice whenever possible before commencing work in any given area.

In most cases, work in the data closets can be confined to the tr room itself and work can be performed during regular hours, causing only minimal disruptions to the area. A small area outside the data closet shall be blocked off to provide a safe working space. Use a plastic barrier that meets ICRA requirements. Extreme care must be taken in order to ensure that no data or telephone circuits are disrupted. The contractor will need to be immediately responsive to restore any service interrupted due to accidental disconnects/cuts.

When installing new data cabling within the ceiling areas of building 1A (main hospital) carefully remove ceiling tiles and install new cabling into the existing cable tray. An ICRA-approved mobile dust containment unit or approved area containment will need to be employed. Coordinate with facilities department to schedule areas of work. Existing cable will need to be moved out of the way and temporarily supported in order to facilitate installation of new cable into the existing cable trays and other pathways. Existing cabling shall be removed after cut-over to the new cable. Any broken ceiling tiles will need to be replaced at contractor’s expense.

The new data cables shall be staged above the ceiling in the area adjacent to where they will be dropped and terminated in each room and/or work area. Cabling will need to be supported from the cable tray to above where the cable is dropped down to the work area outlet. Use appropriate hanger wire, threaded rod and j-hooks. The new data cables can be terminated in the TR at any time. Coordinate the dropping, termination and testing of the cable onto new jacks at the work area outlet with facilities. Once the work area outlet has been cut over to the

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 3 new cable the old cable(s) can be removed. Ensure that the old cable is maintained active until the cutover. Cutover will need to be coordinated with OIT.

Begin all cable demolition at the termination ends, where identification can be verified. Starting demolition at the tr end will be the most effective in ensuring that cables that are not to be demolished are not disturbed

Installation of new cabling above the ceiling in building 1A will not require an ICRA-approved mobile dust containment unit. However, reasonable care should be taken to protect workers and VA personnel in the area from dust and falling debris. Care will also need to be taken when removing ceiling tiles. Broken tiles will need to be replaced at contractor’s expense.

Install new fiber from other buildings to server room. Most of this work can be done during normal work hours as it is mostly limited to outside or TR areas. However, there may be some areas within building 1A where work will need to be done in occupied corridors. In these areas

IRCA-approved containment procedures will need to be employed. Contractor to coordinate cable cutover by VA OIT for new fiber. Once the cutover to the new fiber has been completed contractor can demolish the old fiber and associated hardware and termination equipment.

Actual cutover to the new fiber will be accomplished by OIT.

Contractor to coordinate with VA COR for anticipated work during normal working hours and hours at night and weekends for any switchover for the telecom, mechanical or electrical systems to limit any VA downtime. Contractor to work with VA COR and user groups for coordination of installation.

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 4

Description of work to be performed in each TR room

General

1. Contractor shall ensure network connections remain active an all existing equipment.

2. Contractor shall install 4 post channel racks as displayed on plans.

3. Contractor shall install new UTP Patch Panel. 48 position, Angled, one Rack Unit (RU) high per panel, with rear cable manager.

4. Contractor shall terminate all new CAT6A cables on 6A component-compliant 8P8C

Media interface Connectors.

5. Contractor shall Install CAT6A from TR to locations depicted on T-100 plans.

Coordinate this with AHJ.

6. Contractor shall verify existing or Install new cable pathway, wire-mesh (wire basket) cable tray – 18”W x 4”D, in hallway above drop ceiling. Install J-hooks where cable tray is inappropriate.

7. Contractor shall coordinate cutover in each TR with ONIT/AHJ.

8. Contractor shall demolish all existing Category cabling and associated hardware in all locations from WAO back to associated TR, after cutover. Do not leave demolished category cabling in walls or ceiling areas, remove it completely.

Typical Telecommunications Room.

1. TRs: BLDG 1A: 4A201, 4A041, 3A004, 3A063, 3A015, 2A004, 2A143, 2A018, 2B102, 2B003, 2B310, 1A457, 1A024, 1A106, 1A014, 1B002, 1B006, 1B609. BLDG Eng: 106.

BLDG EC: EC104

2. Move existing racks while maintaining network connection activity.

3. Provide and install 4 post channel racks. Number of Racks will be noted on plans.

4. Provide and Install new UTP Patch Panel(s).

5. Provide and install new fire-rated sleeves from the TR room out to the corridor ceiling area for all new cabling. Provide and install new fire-rated sleeves in all fire-rated walls along the cable pathways.

6. Install new CAT6A UTP from TRs to associated area. Coordinate TR service area location with AHJ.

7. Label and test all installed cables according to Div 27 Specs.

8. DO NOT disturb UTP cabling for specialty systems served by TRs (e.g. Wireless

Network cabling and television cabling).

9. Completely remove old UTP, Cat6/Cat5e, from all areas. Remove old UTP cabling from

WAO(s) to originating TR Rack.

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 5

Description of work to be performed SR/MCR/DC

General

1. Contractor shall coordinate all work with ONIT for execution and phasing for all work to be done in SR/MCR/DC. Phasing will be included on Telecom Plans.

2. Contractor shall move existing server cabinets and cabling racks without interrupting network connection.

3. Contractor shall install New Network/Server Cabinets as displayed on plans.

4. Horizontal Distribution Area refers to UTP CAT6A cabling to Work Area Outlets (WAOs) in all office and clinical spaces for network connections.

5. In Horizontal Distribution Area (HDA), Contractor shall install new UTP Patch Panel. 48 position, Angled, one Rack Unit (RU) high per panel, with rear cable manager.

6. In HDA, Contractor shall terminate all new CAT6A cables on 6A component-compliant

8P8C Media interface Connectors.

7. In HDA, Contractor shall install CAT6A from TR to locations depicted on T-100 plans.

Coordinate this with AHJ.

8. Verify existing or Install new cable pathway in SR/MCR/DC and HDAs (in hallways above drop ceiling), wire-mesh (wire basket) cable tray – 18”W x 4”D, in SR/MCR/DC.

Install J-hooks where cable tray is inappropriate.

9. Contractor shall demolish all existing Category cabling and associated hardware in all locations from WAO back to associated HDA rack, after cutover. Do not leave demolished category cabling in walls or ceiling areas, remove it completely.

10. Contractor shall install new server cabinets as displayed on plans.

Server Room / Main Computer Room / Data Center Horizontal Distribution Areas.

1. SR/MCR/DC: BLDG 1A: 4A201.

2. Move/reconfigure existing racks while maintaining network connection activity.

3. Provide and install Network/Server Cabinets. Number and location of Cabinets will be noted on plans.

4. Provide and Install new UTP Patch Panel(s) in Horizontal Distribution Area racks only.

5. Provide and install new fire-rated sleeves from the TR room out to the corridor ceiling area for all new cabling. Provide and install new fire-rated sleeves in all fire-rated walls along the cable pathways.

6. Install new CAT6A UTP from SR/MCR/DC to associated HDA service area. Coordinate

HDA service area location with AHJ.

7. Label and test all installed cables according to Div 27 Specs.

8. DO NOT disturb UTP cabling for specialty systems served by TRs (e.g. Wireless

Network cabling and television cabling).

9. Completely remove old UTP, Cat6/Cat5e, from all areas. Remove old UTP cabling from

WAO(s) to originating HDA Rack.

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 6

MCR Internal Structured Cabling (Server Rack Cabling/Cross-Connects)

The MCR-internal structured cabling system shall use a redundant, diversely-routed end-of-row (EOR) HDA distribution model supported by redundant MDAs where the main cross-connect is located as defined by ANSI/TIA 942-B specifications.

All elements of the data center structured cabling system shall be located in the data center installed in overhead cable tray systems. Both HDAs, which serve as the distribution point for horizontal cabling and houses horizontal cross-connects and equipment for connecting to the equipment distribution area and the MDA, should be located adjacent to switching components within the rack to minimize patch cord length and cable management requirements.

All IT equipment will be supported from the HDA elements using the structured cabling system.

All networking equipment will be located in the network channel racks and all server/storage equipment will be located in the server cabinets provided in these designs. NSCs using a server cabinet shall follow a modified structured cabling environment appropriate to the specific requirements of the environment.

The use of top-of-rack (TOR) switches and similar networking equipment within server cabinets is prohibited.

The use of pre-terminated structured cabling elements is required in the data center.

Specification of data center structured cabling (both copper and fiber) requires calculation of total length of the link pathway in all dimensions (orthogonally) from dimensionally accurate plans. Procure structured cabling elements to not exceed 6 ft/2 m at each end from the calculated length to avoid coiling of excess cabling.

Media and patch panel quantities for the computer room structured cabling system are based on the Standard Density server cabinet. Equipment Distributors in standard density server cabinets support A/B redundant cabling with each side consisting of a minimum of 12 duplex

LC (two 12-strand MPO cables) and a minimum of 24 UTP cables. Upstream requirements in

HDAs and MDAs are based on the quantity of server cabinets in the data center’s master plan.

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 7

757-22-705 (1791.19) EHRM Infrastructure Upgrades – Tier 2

Telecommunications - 8

Execution (Phasing)

This project involves working in and re-configuring mostly occupied and active data closets and spaces. New data cabling will be installed to replace or augment existing locations in possibly occupied areas. In addition, because it is a hospital, most circuits are considered critical and cannot be interrupted at random. Therefore, this work will require careful coordination with both the departments being affected and the hospital IT department.

Because of the critical nature of these data circuits, night work may be required in some instances and extra care will need to be taken so as not to create excessive noise, dust or debris.

In each area the work consists of rough installing of the new cable, (unterminated and coiled for future extension to the work station) and terminating the new cable onto the new CAT6A patch panels in the associated TR. The next step is to extend and terminate the new cable at each station and then testing the cable. Once all the cables in the work area have been tested and certified, all the old cable can be demolished all the way back to the TR.

In most cases, work in the data closet can be confined to the TR room itself. Work in these spaces can be performed during regular hours and will only cause minimal disruptions to the area. Small areas outside the data closet can be blocked off to provide a safe working space.

Extreme care must be taken to ensure that no data circuits are disrupted. The contractor will need to be immediately responsive to restore any service interruption due to accidental disconnects/cuts.

In addition, extensive work will likely be performed in main corridor areas, and this will create disruptions to the flow of personnel in and out of those areas. Care will need to be taken to protect personnel and guests from dust, hazardous materials and falling debris. This will probably involve ICRA procedures.