Attachment 8 - Specs 508-22-105.pdf

PDF 12 MB Posted

Attached to
Y1DA--508-22-105 | 6th Floor CLC 16-Bed Bldg. C
Solicitation number
36C24725R0029
Issued by

About this file

This file contains construction specifications for renovating the 6th floor of Building C at the Atlanta VA Medical Center to create a 16-bed Community Living Center (CLC). The specifications detail requirements across multiple building systems including HVAC, plumbing, electrical, communications, and fire protection systems.

The technical specifications cover detailed requirements for installation of ductwork, piping, electrical wiring, lighting controls, panelboards, fire dampers, testing and balancing of HVAC systems, and communications infrastructure. Key systems to be installed include terminal units, variable air volume boxes, smoke detectors, LED lighting, nurse call systems, and data/telecommunications cabling. The work involves demolition of existing systems and installation of new infrastructure while maintaining operations in adjacent occupied areas. Contractors must comply with VA safety and infection control requirements, coordinate with facility operations, and provide all necessary testing and documentation. The specifications reference multiple industry standards including NFPA, ASHRAE, UL and VA design guidelines that must be followed.

View the file

Other files

File Type Posted
E001 - ELECTRICAL - LEGENDS-SYMBOLS-DRAWING INDEX.pdf PDF
ES100 - ELECTRICAL - LEVEL 06 - NEW WORK - SPECIAL SYSTEMS.pdf PDF
E005 - ELECTRICAL - SPECIAL SYSTEM DETAILS.pdf PDF
E006 - ELECTRICAL - PARTIAL RISER DIAGRAMS.pdf PDF
Images.pdf PDF
01 01 45 35 - Special Inspections Worksheet.xlsx XLSX spreadsheet
36C24725R0029 0005.docx DOCX document
01 45 35 - Special Inspections.docx DOCX document
ED100 - ELECTRICAL - LEVEL 06 - DEMOLITION.pdf PDF
E007 - ELECTRCIAL - PANEL SCHEDULES.pdf PDF
RFI Responses.xlsx XLSX spreadsheet
36C24725R0029 0004.docx DOCX document
RFI Response Renovate 6th Floor CLC Bldg C.pdf PDF
DBA Wages 2-7-2025.pdf PDF
RFI ATTACHMENTS.zip ZIP file
36C24725R0029 0003.pdf PDF
36C24725R0029 0002.pdf PDF
Site Visit Attendance Sheet 508-22-105.pdf PDF
36C24725R0029 0001.docx DOCX document
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 7 - Construction Drawings 508-22-105.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
36C24725R0029 Solicitation.docx DOCX document
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Dev.pdf PDF
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 6 - Invoicing.docx DOCX document
Attachment 5 - DBA Wages GA20250305 01-03-2025.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHARLOTTE ENGINEERS, LLP

5838 Monroe Road | Charlotte, NC 28212

704-531-3000 | www.CharlotteEngineers.com

ATLANTA VA HEALTHCARE SYSTEM:

Renovate 6th Floor for 20-Bed Short-

Stay CLC

100% SUBMISSION (UNSEALED)

VA Contract No.: 36C24721R0133 Project No.: 508-22-105

CE Project No.: 4714

Department of Veterans Affairs, Atlanta, GA Darryl Ray, COR

BASIS OF DESIGN NARRATIVE

July 10, 2023

SPECIFICATIONS

September 21, 2023

100% SUBMISSION

ATLANTA VA HEALTHCARE SYSTEM:

Renovate 6th Floor for 16-Bed Short- Stay CLC

100% SUBMISSION

VA Contract No.: 36C24721R0133

Project No.: 508-22-105

CE Project No.: 4714

Department of Veterans Affairs, Atlanta, GA

Bob Cousseillant, COR

AVAHCS – Atlanta, GA VA Project 508-22-105 Renovate 6th Floor for CLC 09-21-2023 1670 Clairmont Rd, Decatur, GA 30033 100% Construction Documents

CERTIFICATIONS PAGE

CERTIFICATIONS PAGE

Architect and Coordinating Professional:

Typed or Printed Name: Luke J. Leising

License Number: 012872

License Expiration Date: 06/30/2025

Professional Engineer: (Mechanical and Plumbing)

Typed or Printed Name: Gregory Turner, PE

License Number: 033510

License Expiration Date: 12/31/2023

Professional Engineer: (Fire)

Typed or Printed Name: John Callahan, PE

License Number: 031384

License Expiration Date: 12/31/2023

Professional Engineer: (Electrical)

Typed or Printed Name: John Edwards, PE

License Number: 050482

License Expiration Date: 12/31/2023

- - - END

Renovate 6th Floor for 16 Bed Short Stay CLC 508-22-105 Atlanta VA Medical Center 100% Construction Documents Clairmont Rd, Decatur, GA 30033 September 21, 2023

VERSION 07-01-23

Renovate 6th Floor for 16 Bed Short Stay CLC 508-22-105 Atlanta VA Medical Center 100% Construction Documents Clairmont Rd, Decatur, GA 30033 September 21, 2023

VERSION 07-01-23

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 01 10 1-Hour Construction Smoke Barrier 10-20 01 01 10.1 Fire and Safety Control (FSS) 10-20 01 01 10.2 IC Infection Control 10-20 01 32 16.15 Project Schedules 11-21 01 33 23 Shop Drawings, Product Data, and Samples 02-23 01 33 24 Electronic Submittals 10-20 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 84 16 Handling & Disposal of Fluorescent Tubes and Batteries

DIVISION 03 – Concrete

03 30 53 (Short-Form) Cast-in-Place Concrete

DIVISION 05 – METALS

05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 27 27 Fluid-Applied Membrane Air Barriers, Vapor Retarding 01-21

Clairmont Rd, Decatur, GA 30033 September 21, 2023

VERSION 07-01-23

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

07 81 00 Applied Fireproofing 07-23 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 17 10 Integrated Door Assemblies 01-21 08 31 13 Access Doors and Frames 04-22 08 33 13 Coiling Counter Doors 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 51 13 Aluminum Windows 01-21 08 71 00 Door Hardware 05-22 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation of Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 54 23 Linear Metal Ceilings 01-21 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 65 19 Resilient Tile Flooring 05-18 09 67 23.20 Resinous (Epoxy Base) With Vinyl Chip Broadcast (RES-2) 12-21 09 77 53 Vegetative Wall Systems 01-21 09 78 23 Phenolic Interior Wall Paneling 01-21 09 84 33 Sound-Absorbing Wall Units 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 73 00 Ceiling Mounted Patient Lift System 08-20

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

Clairmont Rd, Decatur, GA 30033 September 21, 2023

VERSION 07-01-23

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-18

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 12-22 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 05-23 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-23

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment 03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 36 00 Air Terminal Units 03-23 23 37 00 Air Outlets and Inlets 03-23

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 09 23 Lighting Controls 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 11-22

Clairmont Rd, Decatur, GA 30033 September 21, 2023

VERSION 07-01-23

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

Clairmont Rd, Decatur, GA 30033 September 21, 2023

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G1000 COVER SHEET

GI101 LIFE SAFETY PLAN

ARCHITECTURAL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AD101 SIXTH FLOOR DEMOLITION PLAN

AE101 SIXTH FLOOR ARCHITECTURAL PLAN

AE102 SIXTH FLOOR DIMENSION PLAN

AE111 SIXTH FLOOR REFLECTED CEILING PLAN

AE401 ENLARGED PLANS AND ELEVATIONS

AE501 SECTIONS & DETAILS

AE601 DOOR SCHEDULE & DETAILS

AE602 WINDOW SCHEDULE & DETAILS

AI101 SIXTH FLOOR INTERIOR FINISH PLAN

AI102 SIXTH FLOOR WALL PROTECTION PLAN

AI103 SIXTH FLOOR DETAIL FLOOR FINISHES & PATTERNS

AI201 ENLARGED PLANS & INTERIOR ELEVATIONS

AI202 ENLARGED PLANS & INTERIOR ELEVATIONS

AI203 ENLARGED PLANS & INTERIOR ELEVATIONS

AI204 ENLARGED PLANS & INTERIOR ELEVATIONS

AI205 ENLARGED PLANS & INTERIOR ELEVATIONS

AI206 FINISH SCHEDULE

AI501 CASEWORK DETAILS

AI502 CASEWORK DETAILS

AI801 SIGNAGE PLAN AND SCHEDULE

AI802 SIGNAGE TYPE

QH101 SIXTH FLOOR EQUIPMENT PLAN

QH102 EQUIPMENT AND FURNITURE SCHEDULES

Clairmont Rd, Decatur, GA 30033 September 21, 2023

00 01 15 - 2

FIRE DETECTION

FA001 FIRE DETECTION – SYMBOLS, NOTES & DRAWING INDEX

FA002 FIRE DETECTION – DETAILS

FA003 INPUT-OUTPUT MATRIX & TEMPORARY REQUIREMENTS

FA100 FIRE DETECTION – LEVEL 06 – DEMOLITION

FA101 FIRE DETECTION – LEVEL 06 – NEW WORK

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION – GENERAL NOTES AND LEGENDS

FX002 FIRE SUPPRESION – DETAILS

FX003 FIRE SUPPRESION – DETAILS

FX004 FIRE SUPPRESSION – IMPAIRMENT & TEMP

SUPPRESSION REQMTS

FX005 FIRE SUPPRESSION – UL DETAILS

FX100 FIRE SUPPRESSION – LEVEL 06 – DEMOLITION

FX101 FIRE SUPPRESSION – LEVEL 06 – DESIGN CRITERIA

PLUMBING

P001 PLUMBING – SCHEDULES, NOTES AND DRAWING INDEX

P002 PLUMBING – DETAILS

PD100 PLUMBING – LEVEL 06 – DEMOLITION

PP100 PLUMBING – LEVEL 06 – NEW WORK – DOMESTIC

PP101 PLUMBING – LEVEL 06 – NEW WORK – SANITARY

MECHANICAL

M001 MECHANICAL – LEGENDS, SYMBOLS AND DRAWING INDEX

M002 MECHANICAL – DETAILS

M003 MECHANICAL – SCHEDULES

M004 MECHANICAL – SEQUENCE OF OPERATIONS

MD100 MECHANICAL – LEVEL 06 – DEMOLITION – DUCTWORK

MD101 MECHANICAL – LEVEL 06 DEMOLITION – PIPING

MH100 MECHANICAL – LEVEL 06 – NEW WORK – DUCTWORK –

OVERALL

MH100-A MECHANICAL – LEVEL 06 – NEW WORK – DUCTWORK –

AREA A

MH100-B MECHANICAL – LEVEL 06 – NEW WORK – DUCTWORK –

AREA B

Clairmont Rd, Decatur, GA 30033 September 21, 2023

00 01 15 - 3

MH100-C MECHANICAL – LEVEL 06 – NEW WORK – DUCTWORK –

AREA C

MP100 MECHANICAL – LEVEL 06 – NEW WORK – PIPING

ELECTRICAL

E001 ELECTRICAL – LEGENDS, SYMBOLS AND DRAWING INDEX

E002 ELECTRICAL – SPECIAL SYSTEMS SYMBOLS AND NOTES

E003 ELECTRICAL – DETAILS AND LUMINAIRE SCHEDULE

E004 ELECTRICAL – SPECIAL SYSTEM DETAILS

E005 ELECTRICAL – SPECIAL SYSTEM DETAILS

E006 ELECTRICAL – PARTIAL RISER DIAGRAMS

E007 ELECTRICAL – PANEL SCHEDULES

E008 ELECTRICAL – PANEL SCHEDULES

E009 ELECTRICAL – PANEL SCHEDULES

ED100 ELECTRICAL – LEVEL 06 – DEMOLITION

EL100 ELECTRICAL – LEVEL 06 – NEW WORK – LIGHTING

EP100 ELECTRICAL – LEVEL 06 – NEW WORK – POWER

ES100 ELECTRICAL – LEVEL 06 – NEW WORK – SPECIAL

SYSTEMS

- - - END - - -

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 508-22-105

Renovate 6th Floor for Short-Stay CLC as required by drawings and specifications.

B. Before placement and installation of work subject to tests by testing laboratory retained by the Contractor, the Contractor shall notify the COR in sufficient time to observe testing laboratory personnel in the taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

C. All employees of general contractor and subcontractors shall comply with VA security background check program , be identified by project and employer.

D. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR

1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

E. Training

1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and

/or other relevant competency training, as determined by VA CP with input from the ICRA team.

2. GC’s superintendent(s)/Project Manager shall have completed the 30-hour construction training OSHA certification. The GC shall submit an appointment letter on the General Contractor’s company letter head containing, the name of the designated

OSHA certified superintendent(s), state the name of the

Competent Person (if different than the superintendent), as

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -2 well as credentials for both. The letter shall be accompanied by a copy of the individual(s) safety training records.

3. Submit training records of all such employees for approval before the start of work.

4. All personnel working on VA property are required to complete VA Privacy training.

F. VHA Directive 2011-36, Safety and Health during Construction, dated 9/22/2011 in its entirety is made a part of this section:

VHA Construction Safety Directive 2011-36

Offerors Must Submit OSHA, EPA and EMR Information with Proposals

VHA Directive 2011-036 is incorporated into this solicitation by reference. All offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three

(3) serious, or one (1) repeat or one (1) willful OSHA or any

EPA violation(s) in the past three years. All Bidders/Offerors shall submit information regarding their current Experience

Modification Rate (EMR). This information shall be obtained from the bidder’s/offeror’s insurance company and be furnished on the insurance carrier’s letterhead, verifying that the contractor’s current Experience Modification Rate (EMR) is equal to or less than 1.0. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on

Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI.

Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for obtaining this information from their prospective subcontractors.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -3

1.2 STATEMENT OF BID ITEM(S)

ITEM I, GENERAL CONSTRUCTION Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items as indicated in the Contract Documents. Electrical Work; Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including lighting, receptacles, data/voice/video systems, fire alarm systems and associated infrastructure.

Mechanical Work; Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including ductwork, plumbing lines, sprinkler modifications and associated infrastructure.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.4 ADMINISTRATIVE WORKING HOURS

A. ADMINISTRATIVE WORKING HOURS FOR THE MEDICAL CENTER ARE NORMALLY

BETWEEN THE HOURS OF 7:00 A.M. TO 4:30 P.M. EXCLUDING SATURDAY

AND SUNDAY. IF THE CONTRACTOR DESIRES TO WORK DURING PERIODS

OTHER THAN ABOVE, THE CONTRACTOR SHALL MAKE HIS/HER REQUEST TO

THE COR THREE (3) WORKDAYS IN ADVANCE OF HIS/HER INTENTION TO

WORK DURING OTHER PERIODS AND WAIT FOR APPROVAL FROM THE COR.

B. No work will be scheduled on the following federal holidays or any other day specifically declared a federal holiday by the

President of the United States.

New Year’s Day Labor Day

Birthday of Martin Luther King, Jr. Columbus Day

Washington’s Birthday Veterans Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -4

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. The Security and Safety Requirements. The Security and Safety

Requirements pertains to station policy for construction projects performed at the Atlanta VA Health Care System, Decatur, GA.

Safety and health concerns are taken seriously at this facility.

All employees of the Contractor are expected to strictly adhere to these regulations and requirements. This is exceedingly important, since we must be primarily concerned for the safety and health of our patients. In this regard, OSHA Standards may protect worker safety and health, but they have minimal benefit for protecting the safety and health of our patients, due primarily to their differing medical conditions. Review this information as orientation with your personnel performing work on site. Where the requirements as outlined in this or other regulations are differing, the more stringent shall apply.

B. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

C. Security Procedures:

1. Secure all construction areas, especially mechanical and electrical rooms against entry of unauthorized individuals including patients.

2. Unless specified, contractor working hours other than regular working hours will require authorization by the contracting officer. Regular contractor work hours for the medical center are Monday–Friday, 7:00 a.m. to 4:30 p.m.

3. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -5

D. Atlanta VA Health Care System Contractor Badging Procedure

1. Fill out the PIV VA form 0711 form along with the below forms

a. Form 306

b. Self-Certification Form

c. VA Form 0710

2. The contractor shall provide an email address and working title mail or email copies of all forms plus copies of OSHA certificates for each employee.

3. Call 404-321-6111 Ext 1201539 or Ext 1207865, or Ext 1202775 to set up an appointment for fingerprint

a. One Person from each company shall call to schedule appointments for all employees.

b. Hours to call are Mon-Fri, 7:30am to 3:00pm (Police Service

Hours)

4. After an appointment has been scheduled. Bring the forms to the Engineering Service the COR in Room GC126 along with OSHA certificate card on same day to have their fingerprints taken.

5. Fingerprint will be taken in Modular bldg. M between parking decks D and E.

6. Bring one picture ID when fingerprints are taken.

7. Typically fingerprint results may take 7- 10 calendar days, after 10 calendar days they may contact 404-3214-6111 EXT

1206240 or Ext 1204376, or Ext 1207594, or Ext 1121674 to check if results are ready for ID pictures.

a. Ask for and Request from HR a SAC date.

b. One person from your company can call to check fingerprint results for multiple people.

c. Hours to call are Monday-Friday, 7:30am to 3:00pm.

8. With the SAC date from HR, call 404-321-6111. Ext 1201539 or

Ext 1207865. or Ext 1202775 to set up an appointment for picture ID.

a. The contractor shall appoint one person to schedule picture

ID’s.

b. Hours to call are Monday-Friday, 7:30am to 3:00pm.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -6

9. On the same day but prior to ID picture, contractor employees need to report to Room GA-130 obtain receipt of their fingerprint results.

10. Return to Modular Building M to take ID picture.

11. Bring two forms of identification when taken ID picture: a picture ID (ex: drive license, US passport) and a non-picture

ID to take picture ID (SS card, certified birth certificate, gun registration card, voter registration card).

a. You should receive a copy of the badge before leaving the

VA. If this does not occur, the contractor should be notified immediately.

b. If badge is not received, call periodically to see when the badge is ready to pick up. Call the same numbers listed in

Item 3 above.

c. Each person will be required to pick up their badge (cannot send someone else to pick up badge).

E. Other Requirements:

1. For working outside the “regular contractor hours” as defined in the contract, The General Contractor shall give 3 working days’ notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

2. No photography of VA premises is allowed without written permission of the Contracting Officer.

3. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

F. Key Control:

1. The general contractor's superintendent will be issued necessary keys daily for those areas outside the construction barriers that require their access (i.e. utility closets, Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -7 electrical closets, mechanical spaces, etc.) and return these keys at the end of each business day. No more than two keys/day will be issued. The Engineering Office will maintain a logbook to account for these keys. Contractors that fail to return these keys will be assessed a $25.00 charge.

2. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons (i.e. patients, staff).

G. The General Contractor shall provide security locks for the construction area. Duplicate keys or lock combinations are to be provided to the COR for the purpose of security inspections of every area of the project including tool boxes, powered equipment, and parked machines and take any emergency action.Motor Vehicle Restrictions

1. Contractor and associated sub-contractor vehicles shall be parked within the staging area of the project. The staging area shall be determined at the time of the pre-bid meeting.

Parking in patient/visitor/staff will require a request and approval for such parking through the COR.

H. General Safety:

1. Follow all federal, state and local safety and health regulations.

2. Maintain safety in the construction site/area in accordance with the provisions of the contract that includes the

Occupational Safety and Health Administration (OSHA)

Regulations; National Electrical Codes; National Fire

Protection Association, etc . Work in a safe manner and take all proper precautions while performing your work. Extra precautions shall be taken when working around persons occupying the building during construction.

3. Provide Personal Protective Equipment (PPE) for your employees.

4. Post appropriate signs in specific hazardous areas.

5. Tools, ladders, etc. are to be secured when not in use.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -8

6. Weekly Safety Inspections: The Construction Safety Committee at this facility will perform safety inspections of all contract operations periodically throughout the month. Written reports of unsafe practices or conditions will be reported to the COR and Contracting Officer for immediate attention and resolution.

I. Environmental Protection:

1. No hazardous materials will be disposed of on Government property. All waste will be hauled off-site or disposed in contractor owned and operated waste removal containers.

2. A copy of all waste manifests for special or hazardous wastes will be forwarded to the COR. Environmental requirements will be strictly enforced.

J. Fire Alarms:

1. The General Contractor is responsible for reviewing locations of fire alarm systems within their construction area.

2. In the event of a fire alarm sounding, you are to remain in your area, unless medical center personnel (Safety, Nursing or

Engineering) instruct otherwise, or unless a fire situation is in your area, in which case you should immediately evacuate.

3. Any work involving the fire protection systems will require written permission to proceed from the COR and requires 48 hours’ notice. An impairment number will be issued through the

COR by the Fire Safety Manager.

4. Do not tamper with or otherwise disturb any fire alarm system components without prior written permission. To do so without written permission will result in an adverse action.

5. Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks.

Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.

K. Permit Required Confined Spaces:

1. Contractors performing work on this facility will follow all requirements outlined in OSHA Standards for working in

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -9 confined spaces. There are numerous permits required for confined spaces on this facility. These spaces have been identified. Some spaces have been posted, but the majority have not due to their configuration. A complete listing of these areas will be provided upon request by the contractor at the NTP meeting.

2. Confined spaces are areas that are large enough to be entered have limited egress/exit potential and are not designed for permanent human occupancy. If you encounter any space that meets this definition, and if it is a suspected confined space, please contact the COR.

3. Contractors performing work in confined spaces are responsible for compliance with all applicable standards and regulations.

L. Housekeeping:

1. Protect patients and VA personnel in occupied areas from the hazards of dust, noise, construction debris and material associated with a construction environment. Keep work area clear, clean and free of loose debris, construction materials and partially installed work that would create a safety hazard or interfere with VA personnel duties and traffic.

2. Clean and remove any accumulation of dust/debris from any surface at the end of each workday.

3. Make every effort to keep dust and noise to a minimum at all times. Take special precautions to protect VA equipment from damage including excessive dust.

4. Maintain clear access to mechanical, electrical devices, equipment and main corridors. This will ensure access to existing systems in the event of an emergency.

5. Clean area of all construction debris and dust upon completion of demolition and/or renovation.

6. During construction operations, keep existing finishes protected from damage. Cover and protect all flooring materials during construction. Any flooring materials or surfaces damaged as a result of construction activities will be replaced at the expense of the contractor.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -10

M. Emergency Medical Services: Emergency medical services for stabilization purposes are available for contractors at this facility. For medical emergencies, dial “0” when inside any building. Report the nature of the emergency and location. The operator will dispatch in-house personnel or coordinate an outside emergency assistance based on the nature of the emergency.

N. Use of Government-Owned Material and Equipment: Use of

Government-owned material and equipment is prohibited.

O. Superintendent and Construction Manager Communications: At all times during the performance of this contract, the Contractors

Superintendent shall be on site and available by cellular phone.

At the beginning of the contract and prior to beginning any construction, provide the COR with the cellular telephone number for the Contractor’s Superintendent and the Construction Manager.

P. Traffic:

1. Traffic hazards are minimal at this facility. Drivers should be particularly concerned with pedestrian traffic.

2. Seat belt use is mandatory on the station.

3. Federal police officers maintain 24-hour control of the area.

Q. Contractor's Trailers: Contractor's trailers shall be located at the area assigned. All utility connections to the trailer shall be installed at the contractor expense. Trailer removal is required upon completion of the contract, unless approved by the

CO to leave in place.

R. Smoking: Atlanta VA Health Care System is a smoke-free campus.

Any smoking inside a government building or on the campus grounds is subject to a fine without warning.

1.6 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-2009...........Surface Burning Characteristics of Building Materials

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -11

2. National Fire Protection Association (NFPA):

NFPA 10............Standard for Portable Fire Extinguishers

NFPA 30............Flammable and Combustible Liquids Code

NFPA 51B...........Standard for Fire Prevention During Welding, Cutting and Other Hot Work

NEC 70.............National Electrical Code

NFPA 241...........Standard for Safeguarding Construction, Alteration, and Demolition Operations

NFPA 101 ………………………… Life Safety Code

NFPA 99……………………………… Health Care Facilities

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926........Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to beginning work, all the contractor’s employees and the sub-contractors shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate Temporary Facilities: Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with

NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Fire Protection During Contruction:

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -12

1. Coordinate with the facility prior to and concurrent with design.

2. In the event that the fire protection systems within the construction space are disabled, one-hour fire protection is required from floor to deck per NFPA requirements.

3. Coordinate construction as necessary to ensure that obstruction of any exit is minimized or avoided. If exits are obstructed during construction, provide alternate exit routes during each phase of construction, and identify the alternate routes on the construction drawings.

4. Minimize or avoid disruptions to fire alarm and sprinkler systems. Delineate phasing of construction to ensure that installations of new systems are expedited, and where possible, maintain existing systems in service until the replacement system is operational. If fire protection systems are to be disrupted, ensure procedures are incorporated to maintain equivalent levels of fire protection and provide formal notification to the facility while systems are down.

5. Separations are to be maintained daily by the contractor

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA

70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR. When necessary an Interim Life Safety

Measure (ILSM) survey will be provided by the Life Safety

Manager. This document will be adhered to the construction barrier as with locations identified by the COR.

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Contractor shall report findings and corrective actions weekly to COR.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with

29 CFR 1926, NFPA 241 and NFPA 10.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -13

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

K. Coordination: Coordinate with COR for modifications to sprinkler system so as to maintain fire protection to all portions of the building. 48 hours prior to shutting down any and all fire protection devises, submit a verbal request to the COR. An impairment number will be issued by the facility Life Safety manager for a period not to exceed four hours. Anticipated shutdowns of these systems will require written notice five workdays prior to the anticipated shutdown.

L. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with

COR and facility Safety Officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.

M. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR and facility Safety Officer.

N. Hot Work: Any hot work operations including cutting, welding, thermal welding, brazing, soldering, grinding, thermal spraying, thawing pipes or any other similar activity, will require a Hot

Work Permit to be obtained from the COR. The Contractor will be responsible for conforming to all Medical Center regulations, policies and procedures concerning Hot Work Permits as outlined below:

a. Prior to the performance of hot work in occupied buildings, a request for a Hot Work Permit will be made to the COR.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -14

b. The COR will inspect the area and ensure that the requirements of NFPA 241, 51b and OSHA standards have been satisfied. Approved Hot Work Permits will be posted in the immediate area of the work.

c. The Hot Work Permit will apply only to the location and work identified on the permit. If additional areas involve hot work, additional permits must be requested.

d. Upon completion of all hot work, the COR will be notified by the responsible individual to perform a re-inspection of the area.

1. Do not use any of the extinguishers in the medical center for standby purpose while conducting hot work. Contractors are required to supply their own Class ABC extinguishers. Medical center extinguishers are only to be used in the event of a fire.

2. Hot work is not permitted on any roofing area unless authorized by the Authority Having Jurisdiction.

O. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COR and facility Safety Officer.

P. Smoking: Atlanta VA Health Care System is a smoke-free campus.

Any smoking inside a government building or on the campus grounds is subject to a fine without warning.

Q. Waste Disposal: Dispose of waste and debris in accordance with

NFPA 241. Remove from buildings daily.

R. Other Construction: Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

S. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.

1.7 OPERATIONS AND STORAGE AREAS

A. Working space and space available for storing materials shall be as determined by the COR.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -15

B. Workmen are subject to rules of Medical Center applicable to their conduct.

C. Keep roads clear of construction material, debris, standing construction equipment and vehicles at all times.

D. Execute work in such a manner as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical

Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

E. Phasing requirements: To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates as required by the drawings on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

F. Coordinate with COR for removal of existing furnishings and equipment to permit Work to proceed.

G. Contractor shall provide the COR with a copy of their LOTO procedure within ten calendar days of receiving the NTP.

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -16

H. Building(s) will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in the affected areas of construction against dust and debris, so that any equipment and affected areas of the occupied Medical

Center Operations will not be hindered. Contractor shall permit access to the Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.

Coordinate alteration work with the COR in areas occupied by

Department of Veterans Affairs in order to facilitate uninterrupted Medical Center operations during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

I. When a building or construction site is turned over to

Contractor, Contractor shall accept entire responsibility, therefore.

1. Contractor shall maintain a minimum inside temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m

(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -17 fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. The Contractor shall be responsible for control over access to the site and keep gates closed at all times during working hours and shall secure them with locks at the end of each workday and outside of working hours. Remove the fence when directed by COR.

K. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -18 cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center

Director’s prior knowledge and written approval.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, a minimum of five (5) working days in advance of proposed minor interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. Interruptions that affect the daily operations of the facility are to be performed on non-business days. Contractor is responsible for the cost of performing this work on weekends or off hours.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours at the contractor’s expense.

4. Major interruptions of any system must be requested, in writing, at least 15 workdays prior to the desired time and shall be performed in cooperation with the COR and facility maintenance department during non-business days and at the expense of the contractor. Outages, restoration and their impact to patient of services and operations are coordinated on a case by case basis.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -19 indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces. All abandoned lines that remain in place are to be tagged as “abandoned in place” and dated. All abandoned lines are to be documented on the as-built drawings.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

O. Hazardous Communication (HAZCOM): Contractor is to comply with the requirements for HAZCOM as per OSHA 1926 standards applicable to hazardous materials. SDS’ are to be readily available to all employees of the GC and employees of VA. Prior to performing work that could result in dust, chemicals, fumes, etc. entering any occupied space, the GC shall notify the COR 48 hours in advance.

Written approval from the COR is required prior to proceeding with the operation.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk

Assessment (ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group as specified here. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COR and Facility ICRA team for review for compliance

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -20 with contract requirements in accordance with Section 01 33 23, Shop Drawings, and Product Data And Samples and Section 01 33 24.

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical Center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, the following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by COR. Contractor shall blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

2. Do not perform dust producing tasks within occupied areas without the approval of the COR. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:

a. Provide dust proof one-hour fire-rated temporary drywall construction barriers from floor to deck to completely separate construction from the operational areas of the

Clairmont Rd, Decatur, GA 30033 September 21, 2023

01 00 00 -21 hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access.

Maintain negative air at all times. A fire-retardant polystyrene, 6-mil thick or greater plastic barrier from floor to deck meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the COR and Medical Center.

b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents or building openings.

Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other prefilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.

c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x

900mm (24” x 36”), shall be used at all interior transitions from the construction area to occupy medical center area.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .