RFI Responses.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Y1DA--508-22-105 | 6th Floor CLC 16-Bed Bldg. C
Solicitation number
36C24725R0029
Issued by

About this file

This file contains Request for Information (RFI) Responses for VA Project 508-22-105, a renovation project for the 6th Floor Clinical (CLC) Building C at a VA medical facility. The RFIs cover multiple technical disciplines including electrical, access control, video surveillance, telecommunications, HVAC controls, infection control, and construction waste management. Key technical details include requirements for new systems integration, such as connecting new video surveillance cameras to existing systems, implementing a new access control system with C-CURE server and licensing, and managing asbestos abatement with a new comprehensive survey.

Significant project specifications involve specific technical requirements like using Tridium front-end system, Bacnet over IP and Ethernet for controls, non-proprietary HVAC controls, and compliance with strict infection control measures including an ante room with negative pressurization and dust mitigation protocols. The project involves renovating an unoccupied 6th floor and abandoned 5th floor, with complex coordination requirements for existing systems, shop drawings, and integration of new technologies. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7, with the project number 36C24725R0029.

View the file

Other files

File Type Posted
E001 - ELECTRICAL - LEGENDS-SYMBOLS-DRAWING INDEX.pdf PDF
ES100 - ELECTRICAL - LEVEL 06 - NEW WORK - SPECIAL SYSTEMS.pdf PDF
E005 - ELECTRICAL - SPECIAL SYSTEM DETAILS.pdf PDF
E006 - ELECTRICAL - PARTIAL RISER DIAGRAMS.pdf PDF
Images.pdf PDF
01 01 45 35 - Special Inspections Worksheet.xlsx XLSX spreadsheet
36C24725R0029 0005.docx DOCX document
01 45 35 - Special Inspections.docx DOCX document
ED100 - ELECTRICAL - LEVEL 06 - DEMOLITION.pdf PDF
E007 - ELECTRCIAL - PANEL SCHEDULES.pdf PDF
36C24725R0029 0004.docx DOCX document
RFI Response Renovate 6th Floor CLC Bldg C.pdf PDF
DBA Wages 2-7-2025.pdf PDF
RFI ATTACHMENTS.zip ZIP file
36C24725R0029 0003.pdf PDF
36C24725R0029 0002.pdf PDF
Site Visit Attendance Sheet 508-22-105.pdf PDF
36C24725R0029 0001.docx DOCX document
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 7 - Construction Drawings 508-22-105.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
36C24725R0029 Solicitation.docx DOCX document
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Dev.pdf PDF
Attachment 8 - Specs 508-22-105.pdf PDF
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 6 - Invoicing.docx DOCX document
Attachment 5 - DBA Wages GA20250305 01-03-2025.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Second Round RFIs

ASSIGNED TORESPONSE
Place Services, Inc. (PSI) - Jon Hanlon
1RFI responses regarding Asbestos appear to indicate that the Contractor is to provide a new ACM survey. Is this the case, or can we bid for ACM abatement based off the quantities in the partial Castle Hill report dated 5/27/202VAContractors will be able to use acm report for pricing but will still need to produce a Asbestos Baseline Survey before commencement of construction to ensure employee safety and scope.
2RFI response regarding attachments for 01 45 35 (Harbor Services #4) stated the attachments are in that spec at 1.4.L.4.a.3).a). There are two images of file icons with file names, but it seems these are not clickable links and that nothing is embedded within the PDF. Can you provide these as separate files?CHARLOTTE ENGINEERSAttachments will be provided separately.
3Response regarding recycling 50% of waste stated that it must be met if "economically feasible". Please define "economically feasible." It will cost substantially more to deconstruct, sort, and recycle. We would prefer to not include these costs to be more competitive, which would make recycling economically infeasible within our bid/budget.VARefer to Spec Section 01 74 19 - Part 1 Part I. for minimum waste categories that shall be diverted from landfills.
4RFI responses state that the location of dumpsters is TBD. Without a location, we cannot know labor time required to convey material to the dumpsters. Please provide a location to use for bidding purposes.VADumpster location will be provided during pre-construction meeting. Assume worst case scenario on site for pricing. Potentailly atop employee parking decks (Parking Deck E or Parking Deck F).
5Regarding the System Surveillance Riser Diagram on Sheet E004. Is the noted NVR an existing unit to be relocated to the Telecom rack from the Electrical Room? Is a separate storage unit required for the new or existing NVR? Is the Telecom rack one and the same as what is shown for the TR Room on Sheet E005?CHARLOTTE ENGINEERS/VAThree questions are being asked.
1.Response to Question 1: Yes, if compatible with the new video surveillance system, confirm with the VA Contracting Officer’s Representative.
2.Response to Question 2: TBD, post award.
3.Response to Question 3: Yes, the telecom rack is existing to remain.
6Based on previous RFI answers, the standard TCO will consist of (3) Cat-6A jacks, all terminated on patch panels. Excluding Camera & WAP outlets, TCO cable counts indicate over 300 cables to be terminated, plus a minimum of 50% spare growth capacity. Will the use of 1U high-density patch panels installed per the OIT Design Guide Templates be acceptable?CHARLOTTE ENGINEERSRefer to Addendum 2 Drawings. The design intent is to not include 50% spare growth capacity since that will be addressed in the future EHRM project. Provide what is called out in the specification and on the drawings unless otherwise directed by the VA Contracting Officer’s Representative. (Reference specification 27 15 00 2.2.B.2.b., 24 port fiber optic modular panels with “LC” couplers.)
7Based on a previous RFI answer, can we confirm that the existing fiber cable as noted in the Rack Elevation on Sheet E005 is to be replaced with (1) new 12-strand single mode OS2 with SC connectors?CHARLOTTE ENGINEERSThe existing fiber from the Main IT Room to the 6th Floor TR in detail 1 on sheet E005 is existing to remain.
8Will the fiber enclosure in the Rack Elevation on Sheet E005 be new or will we use the existing enclosure?CHARLOTTE ENGINEERShe existing fiber enclosure shall be removed from the existing telecom rack. Provide new fiber enclosure as called out in the specifications and on the drawings, unless otherwise directed by the VA Contracting Officer’s Representative. (Reference detail 1 on sheet E005.)
9Regarding the Nurse Call Portion. Would the new nurse call equipment need to interface with the current Jeron 790 system or could it run independently?VANeeds to interface with Existing nuse call system
10Please provide Cable manufacturer details.VAto be compatible with existing nurse call system
11Please provide CCTV manufacturer details. Also provide recording parameters.VARefer to RFI Response April 10th for manufacturer. Min. Recording Parameters, refer to spec 28 23 00 Section 2.11.
12Existing Access Control system is Software house. Please provide who is the account holder for existing access control.VAAccount Holder Access TBD at pre-construciton meeting
13Please provide manufacturer information for Nurse call system.VARefer to RFI Response April 10th for existing manufacturer. Nurse Call System to be compatible with Existing.
14Please provide information what type of fiber is required.CHARLOTTE ENGINEERSFiber Optics Backbone Cable is specified in 27 15 00 2.2.B.5. Fiber-Optic Cross-Connection Subsystems is specified in 27 15 00 2.2.I. Fiber-Optic Backbone Distribution Cable is specified in 27 15 002.3.B.5. Fiber-Optic Outlet Connection Cable is specified in 27 15 00 2.3.C.3. (VA Contracting Officer’s Representative to inform contractor of type of fiber used on the campus.)
15Please provide distance/location of 2C271 Nurse call head-end.VA90ft. 2C271 closet adjacent to Elevator 3. Elevator 3 is the same shaft as existing elevator shaft P6-3 in the construction drawings.
Birmingham Industrial Construction (BIC) - Antonio Cabello
1Interior Finish Schedule on Drawing Sheet Number AI206 is calling for:

RF-1 Rubber Flooring - Interface or Equal - Noraplan Linee - 7309 Quartzite

Do we need to send an RFI to be able to substitute?

GUIDONProduct for RF-1 will be reviewed during the submittal process. The provided product must meet the specification and receive the approval of the VA Interior Designer.
2The elevation details on sheet AI202 Typical Patient restrooms - Is there a shower pan at all patient showers, or are we to carry PT-1 floor tile into the showers?GUIDONThere is a shower pan in all the typical patient rooms except the spinal cord rooms.
3Is PT-2 going on the shower floor in 1/AI205 Typical Spinal Cord Restrooms? Finish plan hatch shows PT-2, but finish room legend has only PT-1 (to match the rest of the restroom)GUIDONYes, PT-2 is used on the shower floor in the spinal cord patient restrooms
4GT-1 is specified as a 4'x8' tile. Is this supposed to be 4"x8"?GUIDONGT-1 is a 12" x 13" mosaic sheet
5PT-3 is not used. Can you confirm this?GUIDONPT-3 is not used
Harbor Services, Inc. - Sam Zion + Kim Thompson
1Follow up to previous RFI #4 from "Harbor Services, Inc - Kim Thompson": These links on page 5 are not functional in the specsCHARLOTTE ENGINEERSAttachments will be provided separately.
2Follow up to previous RFI #6 from "Harbor Services, Inc - Kim Thompson": This response states 50% shall be met if exceptions are not applicable and references part 1.1 and 1.4 of the specs. There are no "exceptions" listed in these parts. Part 1.4 provides definitions of terms. Part 1.1 only lists reasonable means the contractor should follow to meet the 50% but even if these are followed - 50% may not be obtained. It should also be clarified that multiple dumpsters will be required onsite to separate materials as indicated in part 1.1 and the VA should identify the area where these dumpsters will be located on site. The location will affect price and should be identified so all GC's are bidding the same scope.VAVendor to determine number of dumpsters based on scope and min. waste categories. If 50% not met min waste category separation required per specs. Exceptions determined case by case basis.
3Follow up to previous RFI #7 from "Harbor Services, Inc - Kim Thompson": Based on this response, GC's will assume the dumpster will be located in the most cost efficient location and if this changes during pre-con - there could be a changeVADumpster location will be provided during pre-construction meeting. Assume worst case scenario on site for pricing. Potentailly atop employee parking decks (Parking Deck E or Parking Deck F).
4Follow up to previous RFI #14 from "Harbor Services, Inc - Kim Thompson": Based on this response, all GC's will assume no requirements will be needed at doors and elevators outside the construction area other than tacky mats. If barriers are needed they would need to be identified on the drawings.GUIDONAlthough VA infection control measures may not be required, Ante room with negative pressurization required due to scope of work. 6th floor will be unoccupied and fully available to the contractor for construction. The 5th floor is also abandoned.
5Follow up to previous RFI #21 from "Harbor Services, Inc - Kim Thompson": This response is indicating that all workers will need to completed work throughout the course of the project with Tyvek coveralls and shoe covers. This requirement will most likely detract some subs from bidding the job and will also cause prices from subs to increase. We just want to make sure this will be required even if tacky mats are used at both sides of the entrances/exits. It may be more cost effective for the VA to require the GC to construct an "ante room" at the elevator that is sealed off from construction area. However, this should be noted on the plans.VARequired Ante Room sealed off from construction area outside of elevator lobby with dust matts at both entries with compressed air blower in ante room for self cleaning due to scope of work. Ante room allowed substitute for coveralls and suites to reduce contamination exposure outside of construction area.
6Follow up to previous RFI #22 from "Harbor Services, Inc - Kim Thompson": As explained, we have concerns the overall project duration does not allow for this process. The reason for this is as follows: The coordination drawings as required by this spec cannot begin until all demo work is complete. This creates a major problem. Once demo is complete, we would essentially have to stop all work, have multiple site meetings with various trades to document existing conditions and if the VA has no accurate as-builts of Steel structures in place, and as buildings of existing Fire sprinkler drawings (since the existing system will have to remain functional per previous RFI response), these drawings will have to be created which takes time. Once these are created, this will then be distributed to all subcontractors who will then begin the process of creating shop drawings and coordination drawings for items within their scope of work - this takes a significant amount of time. As conflicts are found amongst trades, these drawings have to be updated - multiple times in order to try and get an "accurate" set of shop drawings submitted as defined by the specs. This all has to be finalized and submitted 20 days prior to starting work again. We also technically wouldn't be able to order any equipment above the ceiling until these drawings were finalized in case of conflicts. This extends to the lead time of these materials. This entire process will take several months from the time demo is complete to the time coordination drawings are "accurate "and approved. This is one of the reasons the project on the 5th floor was terminated for owner convenience - there were several issues with the design and existing conditions. I imagine we will have similar conflicts on this project due to the low height from floor to decking above. This process should really be completed prior to bidding the job. Maybe too late on this project, but the cost upfront will be far less than costs due to delays during constructionVAMarkup and redline existing drawings. No need to draft new plans. Markup existing A/E demo plans to reflect existing conditions and use as base to provide coordination drawings. No cost time extension may be used for completion.
7Follow up to previous RFI #4 from "Place, Inc - Andrew Martin": What is meant by "Contractor furnished ACM report required for materials associated with 6th floor CLC project" Are we simply having the existing report updated since 3 years have passed or do we have to complete an entirely new report from scrath and is there a requirement for what is to be included in this report. Also, the project duration may need to be adjusted for this requirement. If this was already figured in the overall project duration, please confirm how much time was allowed to complete this process from start to finish.GUIDONThe GC will be required to do a new report. This would inlcude material testing and inspection of suspected asbestos materials. The GC will be required to provide a plan for the abatement. This is included as part of the overall project duration. Refer to the VA Asbestos Abatement Design Manual and Asbestos Management Program for additional information.
8There is a spec for epoxy flooring, but did not see any rooms on the schedule. Is any epoxy flooring is required? Is there is an option for epoxy?GUIDONThe epoxy Spec is for Sherwin Williams water based epoxy Coating (SC) which is a washhable and scrabbable coating used on walls in clean and soiled rooms. Color to match wall paint specified for walls.
Trane Technologies - Ankur Bhatia
1We are looking for some feedback on the approved vendor for HVAC controls. At another recent project in Building C for pharmacy (VA Project No. 508-21-107) an RFI stated that it should be Trane controls, but we have not seen any such direction for this project.VANon-proprietary controls module and bacnet over IP and Ethernet
2Please confirm Trane controls is acceptable for DDC system to be integrated into the Trane front end.VABacnet over IP and Ethernet required
Johnson Controls - Jaden Godbout
1Regarding HVAC controls: Do you know if the front end is Trane or Tridium where you would see the building graphicsVAFront end system is Tridium. ALC ( automated logic) pulled in on tridium building management system platform. Global Controller Preferred for scope of work.
Net Planner - Joe Ciampini & Randy Major
1Per Amendment 4, RFI date extension, we respectfully submit the following RFI in Attachment 8, Spec Section 28 23 00 – Page 17 subsection J – Video Surveillance System

J. Existing Equipment

1. The Contractor shall connect to and utilize existing video equipment, video and control signal transmission lines, and devices as outlined in the design package. Video equipment and signal lines that are usable in their original configuration without modification may be reused with Contracting Officer approval.

Please provide the design package information referenced above (we did not find it in the specs or drawings provided) and/or provide the make and model of the existing Video Surveillance equipment so we can determine if our proposed equipment could be tied-in?

Our approach will be to include new coverage cameras to be connected to existing video system. (If design cameras are also existing just advise.) R Refer to RFI response April 10th for existing manufactuer. Model number to be confirmed post award. New coverage camera to be connected to existing.

Johnson Controls - Andrew Hinkle
1Drawing note reads "Existing access control panels shall be relocated to the location shown. contractor shall provide all wiring and integration to make system whole and functional." Will the owner be providing sufficient control panels & power supplies to connect all credential readers and REX devices included in this project's scope of work? If so, what is the quantity of each control panel and power supply that will need to be reinstalled, and will these be installed in a single head-end?CHARLOTTE ENGINEERSRefer to Addendum 2 drawings. Per the demolition keyed notes on sheet ED100, the existing access control and power supply panels are not operational, the contractor shall provide all wiring, accessories, and programming to make them become active as part of their contract. The existing access control and power supply panels shall remain in their current location and not be relocated. Existing access control panels and power supply not connected.
2Drawing note on 5 credential readers are to "connect existing card reader to access control panel. splice and extend as required." Please confirm that we are to provide and install 8 new readers, and the owner will be providing 4 readers. Also, are the 4 existing readers already at the correct locations, or do we need to move them?CHARLOTTE ENGINEERSRefer to Addendum 2 Drawings. All card readers shall be new and provided by the contractor, who is responsible for the quantity shown on the drawings, wiring, and them being compatible with the existing access control and power supply panels, that are not currently operational.
3Door 661 is indicated on drawing as an existing access-controlled door. However, in the door schedule and hardware set information (Drawing sets), it is not listed as a controlled access door. Please clarify if door 661 is to be controlled by Div 28.GUIDONDoor 661 is to be access controled. The the existing electric strike and card reader should be reused with new door hardware.
4Will all conduits and stub-ups for Div 28 cable be provided and installed by others?CHARLOTTE ENGINEERSConduits and stub-ups for Division 28 cables shall be provided and installed by Division 26 per the specifications and drawings.
5Does the owner need us to provide a new, additional C-CURE access control server and licensing to accommodate the 12 doors in the renovation, or will we be able to use the existing server and licensing by LAN connection? If the latter, please provide the C-CURE system ID number for the existing Software House system so that we may validate licensing and reader capacity.VAowner to provide a new, additional C-CURE access control server and licensing to accommodate the 12 doors in the renovation
6Is system redundancy or high availability components required for the C-CURE access control system?VAyes
7Specific make/model of credential readers are not listed in the plans or specs. Please provide the make/model of readers that the owner requires, if applicable.VAThe manufacturer shall regularly and presently produce, as one of the manufacturer's principal products, the

equipment and material specified for this project, and shall have manufactured the item for at least three years. Physical Access Control System (PACS) shall consist of:

1. Head-End equipment server,

2. One or more networked PC-based workstations,

3. Physical Access Control System and Database Management Software,

4. Credential validation software/hardware,

5. Field installed controllers,

6. PIV Middelware,

7. Card readers,

8. Supportive information system,

9. Door locks and sensors,

10. Power supplies,

11. Interfaces with:

a. Video Surveillance and Assessment System,

b. Intrusion Detection System,

c. Fire Protection System,

8Do you want us to include access control credentials or a badge printer?VANo.
9Please confirm that the video surveillance system will be a new, standalone installation; not to be tied into any existing video surveillance system.CHARLOTTE ENGINEERSThe video surveillance system will be new. CCTV to be tied into and compatible to existing video surveillance.
10What are the video streaming and recording requirements, if any? Specifically, frame/image rate and video retention time.VATo be determined pre construction meeting. Refer to RFI 1 for existing cctv manufacturer
11Do you want us to include uninterruptible power supplies?CHARLOTTE ENGINEERSProvide what is called out in the specifications and shown on the drawings. (Reference detail 1 on sheet E005.)
12Do you want us to include network switches?CHARLOTTE ENGINEERSRefer to Addendum 2 Drawings. Per the drawings, existing active electronics in the telecom rack shall be removed by the Owner. Coordinate with the VA Contracting Officer’s Representative regarding the reuse of the existing active electronics and any new required equipment/hardware.
13Do you want us to include network racks?CHARLOTTE ENGINEERSRefer to Addendum 2 Drawings. No, the telecom rack is existing to remain. The contractor shall upfit the existing telecom rack with all the components called out in the specifications and shown on the drawings. (Reference detail 1 on sheet E005.)
Angel Electric LLC - Angel R. Ocasio
1WHAT IS THE AMPERAGE SIZE OF DISCONNECT T-6LB1 TO BE FED FROM
PANEL NHL-C6-4(6HB) TO INCLUDE CIRCUIT NUMBER?CHARLOTTE ENGINEERSRefer to Addendum 2 drawings. Disconnect T-6LB1 is not being replaced. A 100 Ampere, 3 pole circuit breaker is being added to panelboard NHL-C6-4 (6HB) to feed transformer T-6LB-1 and the panelboard is being changed from 42 poles to 24 poles.
2SECTION 264313 2.1 5. PANELBOARD SPD. INTEGRAL DISCONNECT SWITCH NOT AVAILABLE PLEASE ADVISE.CHARLOTTE ENGINEERSCharlotte Engineers has confirmed integral disconnect switches are available for surge protective devices for panelboards.
3PANEL CHL-C6-2 (6HXB) STAIR-WAY LIGHTING. DURING DEMOLITION PHASE WILL THE STAIR WAYS BE OFF LIMIT TILL POWER IS RESTORED?CHARLOTTE ENGINEERSGeneral Project Note CC on sheet E001 required the Electrical Contractor to provide temporary power to maintain the Owner’s operations. Coordinate all required power outages with the VA Contracting Officer’s Representative per General Project Note B.
4IS THE 5TH FLOOR AVAILABLE FOR USE OF TEMPORARY POWER ON THE 6TH FLOOR DURING CONSTRUCTION?VAAssume 5th floor not available for temporary power. Floor will be under construction and under GC survelience executing a separate construction contract.
5IS THE DEMOLITION SUBCONTRACTOR RESPONSIBLE FOR THE REMOVAL OF EXISTING ELECTRICAL SYSTEM AND SAFE OFF ACTIVE CIRCUIT?CHARLOTTE ENGINEERSDivision 26 demolition is typically performed by the Division 26 contractor. If the general contractor chooses to have the Division 26 demolition performed by a demolition subcontractor, it will be the general contractor’s responsibility to coordinate their work and confirm everything is demolished in a same manner in compliance with NFPA 70E.
6DURING CONSTRUCTION THERE WOULD BE DRILLING OF THE CONCRETE CEILING DECK FOR ELECTRICAL SUPPORT. IS THE 7TH
FLOOR ACTIVE, IF SO, WHAT WOULD BE THE SLOTTED TIME TO COMMENCE WORK?VA7th floor active inpatient area. Drilling to take place during business hours.
7WORK THAT HAS TO BE CONDUCTED ON THE 6TH FLOOR INVOLVES OTHER FLOOR LEVELS, WILL THE FLOOR LEVEL BE ACCESSIBLE DURING BUSINESS HOURS?VAOn a case by case basis. Access to be coordinated with COR and Integrated Project Team.
8ARE LOCK-OUT TAG-OUT OF BREAKERS BE TURN-OFF INSTEAD OF THE ENTIRE PANEL TO WORK ON FED CIRCUITS ON THE 6TH FLOOR BE ALLOWED?VAAll work shall be performed in a safe manner in compliance NFPA 70E. Charlotte Engineers takes no exception to locking out and tagging out circuit breakers but this needs to be confirmed by the VA Contracting Officer’s Representative.

File details come from the government source that posted it. Updated .