36C24725R0029 0005.docx

DOCX document 122 KB Posted

Attached to
Y1DA--508-22-105 | 6th Floor CLC 16-Bed Bldg. C
Solicitation number
36C24725R0029
Issued by

About this file

This document is a Standard Form 30 amendment to a Department of Veterans Affairs solicitation for a construction project at the Atlanta VA Medical Center. The amendment serves three primary purposes: 1) provide official government responses to the second round of Request for Information (RFI), 2) extend the proposal submission deadline to June 11, 2025, at 1:00 PM Eastern Time, and 3) update certain provisions and clauses due to Executive Orders 14148 and 14208. The solicitation (36C24725R0029) is for the 6th Floor CLC 16-Bed Building C project, with the specific project number 508-22-105, located in the VISN 7 Network service area. The amendment includes several attached technical documents related to electrical systems, special inspections, and other construction-related specifications, indicating this is a complex infrastructure renovation or construction project for the Veterans Health Administration.

View the file

Other files

File Type Posted
E001 - ELECTRICAL - LEGENDS-SYMBOLS-DRAWING INDEX.pdf PDF
ES100 - ELECTRICAL - LEVEL 06 - NEW WORK - SPECIAL SYSTEMS.pdf PDF
E005 - ELECTRICAL - SPECIAL SYSTEM DETAILS.pdf PDF
E006 - ELECTRICAL - PARTIAL RISER DIAGRAMS.pdf PDF
Images.pdf PDF
01 01 45 35 - Special Inspections Worksheet.xlsx XLSX spreadsheet
01 45 35 - Special Inspections.docx DOCX document
ED100 - ELECTRICAL - LEVEL 06 - DEMOLITION.pdf PDF
E007 - ELECTRCIAL - PANEL SCHEDULES.pdf PDF
RFI Responses.xlsx XLSX spreadsheet
36C24725R0029 0004.docx DOCX document
RFI Response Renovate 6th Floor CLC Bldg C.pdf PDF
DBA Wages 2-7-2025.pdf PDF
RFI ATTACHMENTS.zip ZIP file
36C24725R0029 0003.pdf PDF
36C24725R0029 0002.pdf PDF
Site Visit Attendance Sheet 508-22-105.pdf PDF
36C24725R0029 0001.docx DOCX document
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 7 - Construction Drawings 508-22-105.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
36C24725R0029 Solicitation.docx DOCX document
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Dev.pdf PDF
Attachment 8 - Specs 508-22-105.pdf PDF
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 6 - Invoicing.docx DOCX document
Attachment 5 - DBA Wages GA20250305 01-03-2025.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24725R0029 0005

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

05-09-2025

508-22-105 36C247 Department of Veterans Affairs VISN 7 Network Contracting Office Atlanta VAMC 1670 Clairmont Rd, Room GC125 Decatur GA 30033

36C247 Same as block 6

To all Offerors/Bidders

36C24725R0029 02-28-2025

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-11-2025 13:00 EDT

The purpose of this amendment is as follows:

1) Provide Official Government Responses to the 2nd round of RFI's.

2) Extend the proposal submission deadline to June 11, 2025,at 1:00 PM Eastern Time.

3) See follow-on page for details on updated Provisions and Clauses.

All other terms and conditions remain unchanged.

Joyce Powers Contracting Officer

VA-VHA-RPOE-2023-0023

Due to the issuance of Executive Orders 14148 and 14208, the Provisions and Clauses below have been edited and updated through the following Deviations:

· 52.204-8, Annual Representations and Certifications (JAN 2025) (DEVIATION FEB 2025)

· 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024) (DEVIATION FEB 2025)

· 52.223-10, Waste Reduction Program (MAY 2024) (DEVIATION FEB 2025)

· 52.223-23, Sustainable Products and Services (MAY 2024) (DEVIATION FEB 2025)

***Please note: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

See attached document: RFI Responses.

See attached document: 01 01 45 35 - Special Inspections Worksheet.

See attached document: 01 45 35 - Special Inspections.

See attached document: E001 - ELECTRICAL - LEGENDS, SYMBOLS, AND DRAWING INDEX.

See attached document: E005 - ELECTRICAL - SPECIAL SYSTEM DETAILS.

See attached document: E006 - ELECTRICAL - PARTIAL RISER DIAGRAMS.

See attached document: E007 - ELECTRCIAL - PANEL SCHEDULES.

See attached document: ED100 - ELECTRICAL - LEVEL 06 - DEMOLITION.

See attached document: ES100 - ELECTRICAL - LEVEL 06 - NEW WORK - SPECIAL SYSTEMS.

See attached document: Images.

File details come from the government source that posted it. Updated .