This is an electrical demolition plan for the 6th floor renovation at a VA Medical Center in Decatur, Georgia. The detailed drawing provides comprehensive demolition specifications for electrical systems, telecommunications, and related infrastructure on Level 06. Key demolition requirements include removing all electrical devices and branch circuits on the level, demolishing communications wire and conduit, removing the nurse call control panel, and carefully managing existing fiber backbone cables. Specific instructions mandate that the electrical contractor remove all electrical items associated with the work, preserve certain existing equipment like transformers and access control panels, and coordinate with the owner's IT staff for cable management. The document is part of a 100% construction document set for renovating the 6th floor into a 16-bed short stay Clinical Logistics Center (CLC), with the project located at 1670 Clairmont Road in Decatur, Georgia.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
J
SSSS
WAP
PS
S
J
S
MSPS
MS
S S
SS SS
WAP
S S
S S
SSS
C R
PS
WAP
PS
WAP
S
PSPS
PS
S
CR
C R
CR
C R
C R
C R
133 4 5 6 7 8 9 10 11 12
D
E
F
G
F A
C P
(TYP.)
(TYP.)
(TYP.) 2 2
(TYP.)
2 2
2 2
2 2
(TYP.)
12 2
2 2
(TYP.)
4 -
ED100
11 11
GENERAL SHEET NOTES
A. PURPOSES. THE SCALE, WHEN INDICATED, IS INTENDED FOR
REFERENCE PURPOSES ONLY.
B. ELECTRICAL CONTRACTOR SHALL REMOVE ALL ELECTRICAL ITEMS
ASSOCIATED WITH THE WORK INDICATED TO BE REMOVED ON THE
ARCHITECTURAL, PLUMBING, MECHANICAL AND FIRE PROTECTION
DRAWINGS.
C. ELECTRICAL WORK SHOWN IS BASED ON FIELD OBSERVATIONS AND
EXISTING DRAWINGS AND IS PROVIDED TO CONVEY THE GENERAL
SCOPE OF DEMOLITION WORK TO BE ACCOMPLISHED. THE
ELECTRICAL CONTRACTOR SHALL VISIT THE SITE AND OBSERVE
EXISTING CONDITIONS PRIOR TO BIDDING.
ALL PANELBOARDS AND DISCONNECTS HOUSED ON LEVEL 06
SHALL BE DEMOLISHED. PANELBOARD FEEDERS ARE EXISTING TO
REMAIN.
ALL ELECTRICAL DEVICES AND BRANCH CIRCUITS SUPPLYING THE
DEVICES ON LEVEL 06 SHALL BE DEMOLISHED. REMOVE DEVICES
AND DEMOLISH WIRE AND CONDUIT BACK TO PANELBOARD. THIS
INCLUDES LUMINAIRES, SECURITY, AND COMMUNICATIONS
DEVICES.
NURSE CALL CONTROL PANEL IN ELECTRICAL ROOM 125 IS TO BE
DEMOLISHED. REMOVE PANEL, NURSE CALL DEVICES, AND WIRES
BACK TO SOURCE.
COMMUNICATIONS WIRE, CONDUIT, AND CABLE TRAY SERVING
LEVEL 06 SHALL BE DEMOLISHED. REMOVE BACK TO
TELECOMMUNICATIONS RACK.
THE OWNER SHALL REMOVE EXISTING ACTIVE ELECTRONICS
FROM THE EXISTING TELECOM RACK
THE CONTRACTOR SHALL MEET WITH THE OWNERS IT STAFF AND
TAG ALL CABLES TO REMAIN IN THE TELECOM ROOM. THE CABLES
SHALL BE WRAPPED IN CAUTION TAPE AND TAGGED - DO NOT CUT
OR REMOVE - FOR THE DEMOLITION CONTRACTOR.
THE CONTRACTOR SHALL CAREFULLY COIL THE EXISTING FIBER
AND ENCLOSURE OVERHEAD AND OUT OF THE WAY DURING THE
DEMOLITION TIME. THE EXISTING PANEL WILL BE RELOCATED TO
THE TOP OF THE EXISTING RACK.
ALL FIBER BACKBONE CABLES WILL BE RETESTED AND IF
REQUIRED, RETERMINATED.
EXISTING RACK AND VERTICAL WIRE MANAGEMENT TO BE SET
ASSIDE DURING DEMO AND TO BE RE-INSTALLED AND REUSED.
COORDINATE WITH DESIGNER EXACT LOCATION IN THE
RENOVATED TELECOM TO INSURE CLEARANCES.
EXISTING ACCESS CONTROL PANEL AND POWER SUPPLY ARE
INSTALLED BUT NOT OPERATIONAL. CONTRACTOR SHALL MAKE
THE EXISTING PANELS OPERATIONAL IN NEW WORK.
EXISTING CARD READER AND DOOR HARDWARE ARE EXISTING
BUT NOT OPERATIONAL. NOTED CARD READERS SHALL BE
REPLACED, ACTIVATED AND CONNECTED TO EXISTING ACCESS
CONTROL PANEL IN NEW WORK.
DEMOLITION KEYED NOTES
EXISTING KEYED NOTES
ENERGY EFFICIENT TRANSFORMERS AND AUTOMATIC TRANSFER
SWITCH ON LEVEL 06 ARE EXISTING TO REMAIN. SEE ENLARGED
PLANS FOR LOCATION OF TRANSFORMERS AND ATS.
CONTROL PANELS IN ELECTRICAL ROOM 125 ARE EXISTING TO
REMAIN, UNLESS OTHERWISE NOTED.
TELECOMMUNICATIONS CHANNEL RACK THAT SERVES LEVEL 06 IS
EXISTING TO REMAIN.
KEY PLAN: (NOT TO SCALE)
AREA OF WORK
5 6 87 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Engineering Discipline:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
U D
B e n d e r\ L o c a l R e v it F ile s \2
\4
V A
M C
A tl a n ta th f l\
C E
C e n tr a l M o d e l.
rv t
/5 /2
:1
:3
P M
ED100
ELECTRICAL - LEVEL 06 -
DEMOLITIONCHARLOTTE ENGINEERS
5838 MONROE ROAD, SUITE 100
CHARLOTTE, NC 28212
704.531.3000
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS STREET
317.800.6388
RENOVATE 6TH FLOOR FOR 16
BED STORT STAY CLC
1670 CLAIRMONT RD, DECATUR, GA
508-22-105
C
9/21/2023 JCE NMG
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
1/8" = 1'-0"
ELECTRICAL - LEVEL 06 - DEMOLITION
GRAPHIC SCALE
( in Feet )
1 inch = 8 ft.
8 84 16 32
1/4" = 1'-0"ED100
2 DEMOLITION - TELECOMMUNICAITONS ROOM
Revisions: Date:
Addendum 2 05-06-2025
NOT A CERTIFIED DOCUMENT AS TO THE ORIGINAL DOCUMENT
BUT ONLY AS TO THE REVISION - THIS DOCUMENT ORIGINALLY
ISSUED AND SEALED BY JOHN C. EDWARDS, JR. 050482, 09-21-23
THIS DOCUMENT IS ONLY CERTIFIED AS TO THE REVISIONS.
| Sheets |
| E001 - ELECTRICAL - LEGENDS, SYMBOLS, AND DRAWING INDEX |
| E004 - ELECTRICAL - SPECIAL SYSTEM DETAILS |
| E005 - ELECTRICAL - SPECIAL SYSTEM DETAILS |
| E006 - ELECTRICAL - PARTIAL RISER DIAGRAMS |
| E007 - ELECTRCIAL - PANEL SCHEDULES |
| ED100 - ELECTRICAL - LEVEL 06 - DEMOLITION |
| ES100 - ELECTRICAL - LEVEL 06 - NEW WORK - SPECIAL SYSTEMS |
| 2025-05-05T16:40:25-0400 | |
| Nicholas Esposito |
File details come from the government source that posted it. Updated .