Attachment 8 - Relay 3 for GMR 3 Wiring.pdf

PDF 1007 KB Posted

Attached to
Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND Federal contract opportunity
Solicitation number
FA4528-25-Q-SP02
Issued by
Department of the Air Force Global Strike Command

About this file

The document contains wire diagrams for Veeder Root TLS-450 PLUS fuel monitoring system installations, specifically showing wiring configurations for GMR3 and GMR5 versions. The diagrams detail the electrical connections between various components including the monitor panel, interstitial sensors, sump sensors, J-boxes, and power sources (120VAC and 24VDC). Key elements include:

The wire diagrams illustrate complex interconnections for sensors and monitoring equipment across different system configurations, with specific annotations for power connections, spare wires, and sensor interface points. The documentation appears to be part of a technical specification for a Department of the Air Force Global Strike Command contract to upgrade fuel monitoring systems at Minot Air Force Base missile facilities, involving replacement of existing Veeder Root 350/350PLUS systems with new 450PLUS systems across multiple missile alert and launch facilities.

View the file

Other files for this federal contract opportunity

Other files attached to Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND, newest first.
File Type Posted
Amendment 6 18 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Amendment 5 13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 2 - Amendment 4 Statement of Work Veeder Root - 13 Aug 25.pdf PDF
Attachment 15 - W3 MAF 450 PLUS Programming.pdf PDF
Attachment 1 - Veeder Root TLS 450PLUSUpgrade Minot AFB Combo.pdf PDF
Attachment 16 - W3 LF 450PLUS Programming.pdf PDF
13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 1 - AMENDMENT Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 20 - WD 2015-6025 and WD 2015-5383.pdf PDF
Attachment 13 - LF Electrical Schematic with GMR 3 Alarm.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 4 - Limited Sources Justification - Veeder Root_Redacted.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 16 - W3 LF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 15 - W3 MAF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 11 - LF Wire Routing with GMR 3 Alarm.pdf PDF
Attachment 3 - Quote Sheet Veeder Root TLS 450PLUS.xlsx XLSX spreadsheet
Attachment 12 - LF Wire Routing with GMR 5 Alarm.pdf PDF
Attachment 7 - Junction and Conduit for Power and Relay Bay.pdf PDF
Attachment 5 - Financial Questionnaire Sheet.pdf PDF
Attachment 17 - Typical LF Site Layout 3 Configurations Typical MAF Site Layout Exterior.pdf PDF
Attachment 19 - Mileage to MAFS.xlsx XLSX spreadsheet
Attachment 18 -Site Security.docx DOCX document
Attachment 14 - LF Electrical Schematic with GMR 5 Alarm.pdf PDF
Attachment 10 - TLS-450 Plus Component Locations.pdf PDF
Attachment 9 - LF EMC Enclosure Layout.pdf PDF
Attachment 2 - Statement of Work Veeder Root.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Current wire diagram with GMR3:

(21-SM80B-2-26-2, After completion of MCL 2162 6-16)

450+ wire diagram with GMR3:

NO

Pictures for reference:

Magnetostrictive

B1.S1.1 MAG SmartSensor

B1.S1.2

Interstitial

B1.S1.3

Current wire diagram with GMR5:

(21-SM80B-2-26-2, 6-16)

450+ wire diagram with GMR5:

This is only necessary if W3 installs a 450+ at a site that has not converted to GMR3 (MCL 2162). From what our office had heard the GMR5 to GMR3 MCL should all be completed before 450+ installs, but I am including just in case.

NO

File details come from the government source that posted it. Updated .