Attachment 17 - Typical LF Site Layout 3 Configurations Typical MAF Site Layout Exterior.pdf
PDF 629 KB Posted
- Attached to
- Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND Federal contract opportunity
- Solicitation number
- FA4528-25-Q-SP02
About this file
This document is a comprehensive site layout guide for Launcher Facilities (LF) and Missile Alert Facilities (MAF), detailing three distinct site configurations for Veeder Root fuel monitoring systems. The configurations include detailed technical diagrams showing the placement of key components such as day tanks, LSB sensor junction boxes, cable anchors, ladders, power systems, EMC enclosures, DETA batteries, and wall/conduit routing. The images also showcase generator room interiors and exterior facility views, including diesel storage tanks and alarm/monitoring equipment.
The technical drawings provide post-installation layouts for south and east walls across three different site configurations, illustrating precise equipment positioning, cable routing, and structural considerations. Exterior photographs complement the technical drawings by showing actual implementation of these design specifications, including equipment mounting, piping, signage, and infrastructure details. These layouts appear directly related to the Minot Air Force Base contract for upgrading Veeder Root fuel monitoring systems across missile launch and alert facilities in northwestern North Dakota.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Typical LF Site Layouts – (3) Configurations & Typical MAF Site Layout & Exterior
Configuration 1 – Existing Configuration (Fig. 1)
Configuration 1 Post-Installation LSB South Wall Layout (Fig 1A)
Configuration 1 Post-Installation LSB East Wall Layout (Fig 1B).
Configuration 2 – Existing Configuration (Fig. 2)
Configuration 2 Post-Installation LSB South Wall Layout (Fig 2A)
Configuration 2 Post-Installation LSB East Wall Layout (Fig. 2B)
Configuration 3 – Existing Configuration (Fig. 3)
Configuration 3 Post-Installation LSB South Wall Layout (Fig 3A)
Configuration 3 Post-Installation LSB East Wall Layout (Fig. 3B)
Generator Room
Exterior
Exterior
File details come from the government source that posted it. Updated .