Attachment 7 - Junction and Conduit for Power and Relay Bay.pdf

PDF 426 KB Posted

Attached to
Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND
Solicitation number
FA4528-25-Q-SP02
Issued by

About this file

The document contains two technical images related to junction boxes and wire splicing for a Veeder Root TLS450 PLUS Upgrade project at Minot Air Force Base. The first image shows the interior of an electrical panel with tightly packed wires, with a note that a panel will cover the slot and wires, and there is limited space for wire splicing. The second image depicts a junction box in a white room with various electrical conduits and wiring, with annotations indicating that all wires are spliced in this junction box, and it is located at a W1 MAF where an EMI enclosure is not required. The images provide technical details about wire management and splicing requirements for the upgrade project, specifically noting that W3 will need a similar setup but within an EMI enclosure.

View the file

Other files

File Type Posted
Amendment 6 18 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Amendment 5 13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 15 - W3 MAF 450 PLUS Programming.pdf PDF
Attachment 16 - W3 LF 450PLUS Programming.pdf PDF
13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 2 - Amendment 4 Statement of Work Veeder Root - 13 Aug 25.pdf PDF
Attachment 1 - Veeder Root TLS 450PLUSUpgrade Minot AFB Combo.pdf PDF
Attachment 1 - AMENDMENT Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 2 - Statement of Work Veeder Root.pdf PDF
Attachment 17 - Typical LF Site Layout 3 Configurations Typical MAF Site Layout Exterior.pdf PDF
Attachment 14 - LF Electrical Schematic with GMR 5 Alarm.pdf PDF
Attachment 10 - TLS-450 Plus Component Locations.pdf PDF
Attachment 18 -Site Security.docx DOCX document
Attachment 9 - LF EMC Enclosure Layout.pdf PDF
Attachment 8 - Relay 3 for GMR 3 Wiring.pdf PDF
Attachment 13 - LF Electrical Schematic with GMR 3 Alarm.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 19 - Mileage to MAFS.xlsx XLSX spreadsheet
Attachment 12 - LF Wire Routing with GMR 5 Alarm.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 20 - WD 2015-6025 and WD 2015-5383.pdf PDF
Attachment 4 - Limited Sources Justification - Veeder Root_Redacted.pdf PDF
Attachment 5 - Financial Questionnaire Sheet.pdf PDF
Attachment 16 - W3 LF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 15 - W3 MAF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 11 - LF Wire Routing with GMR 3 Alarm.pdf PDF
Attachment 3 - Quote Sheet Veeder Root TLS 450PLUS.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

There will be a panel covering this slot and wires.

Very tight and not a lot of room to splice wires.

All wires are spliced in this junction box.

This image is at a W1 MAF so an EMI enclosure is not required.

W3 will need something like this to splice the wires but it will need to be within the EMI enclosure.

Slide 1
Slide 2

File details come from the government source that posted it. Updated .