Attachment 7 - Junction and Conduit for Power and Relay Bay.pdf

PDF 426 KB Posted

Attached to
Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND Federal contract opportunity
Solicitation number
FA4528-25-Q-SP02
Issued by
Department of the Air Force Global Strike Command

About this file

The document contains two technical images related to junction boxes and wire splicing for a Veeder Root TLS450 PLUS Upgrade project at Minot Air Force Base. The first image shows the interior of an electrical panel with tightly packed wires, with a note that a panel will cover the slot and wires, and there is limited space for wire splicing. The second image depicts a junction box in a white room with various electrical conduits and wiring, with annotations indicating that all wires are spliced in this junction box, and it is located at a W1 MAF where an EMI enclosure is not required. The images provide technical details about wire management and splicing requirements for the upgrade project, specifically noting that W3 will need a similar setup but within an EMI enclosure.

View the file

Other files for this federal contract opportunity

Other files attached to Veeder Root TLS 450 PLUS Upgrade Minot AFB, ND, newest first.
File Type Posted
Amendment 6 18 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Amendment 5 13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 2 - Amendment 4 Statement of Work Veeder Root - 13 Aug 25.pdf PDF
Attachment 15 - W3 MAF 450 PLUS Programming.pdf PDF
Attachment 1 - Veeder Root TLS 450PLUSUpgrade Minot AFB Combo.pdf PDF
Attachment 16 - W3 LF 450PLUS Programming.pdf PDF
13 Aug 25 Q A Veeder Root TLS 450 PLUS upgrade.pdf PDF
Attachment 1 - AMENDMENT Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 17 - Typical LF Site Layout 3 Configurations Typical MAF Site Layout Exterior.pdf PDF
Attachment 19 - Mileage to MAFS.xlsx XLSX spreadsheet
Attachment 18 -Site Security.docx DOCX document
Attachment 14 - LF Electrical Schematic with GMR 5 Alarm.pdf PDF
Attachment 10 - TLS-450 Plus Component Locations.pdf PDF
Attachment 9 - LF EMC Enclosure Layout.pdf PDF
Attachment 8 - Relay 3 for GMR 3 Wiring.pdf PDF
Attachment 2 - Statement of Work Veeder Root.pdf PDF
Attachment 20 - WD 2015-6025 and WD 2015-5383.pdf PDF
Attachment 13 - LF Electrical Schematic with GMR 3 Alarm.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 4 - Limited Sources Justification - Veeder Root_Redacted.pdf PDF
Attachment 1 - Veeder Root TLS 450 PLUS Upgrade Minot AFB Combo.pdf PDF
Attachment 16 - W3 LF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 15 - W3 MAF TLS 450 PLUS Programming Instructions.pdf PDF
Attachment 11 - LF Wire Routing with GMR 3 Alarm.pdf PDF
Attachment 3 - Quote Sheet Veeder Root TLS 450PLUS.xlsx XLSX spreadsheet
Attachment 12 - LF Wire Routing with GMR 5 Alarm.pdf PDF
Attachment 5 - Financial Questionnaire Sheet.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

There will be a panel covering this slot and wires.

Very tight and not a lot of room to splice wires.

All wires are spliced in this junction box.

This image is at a W1 MAF so an EMI enclosure is not required.

W3 will need something like this to splice the wires but it will need to be within the EMI enclosure.

Slide 1
Slide 2

File details come from the government source that posted it. Updated .