Attachment 8-Contractor Release.pdf

PDF 19 KB Posted

Attached to
MMAC Base Maintenance Renovation Federal contract opportunity
Solicitation number
6973GH-20-R-00062
Issued by
Department of Transportation Federal Aviation Administration Non-Franchise Acquisition Services

About this file

This document contains a contractor release form and information about a federal contract opportunity for renovation services. The contractor release form is a standard template to be signed upon completion of a contract in order to release the government from further liabilities or claims from the contractor. The related federal contract opportunity is a solicitation from the Department of Transportation Federal Aviation Administration to provide renovation services for the Base Maintenance Building at the Mike Monroney Aeronautical Center, including all labor, supplies, equipment, materials, and other items required as specified in the solicitation documentation.

View the file

Other files for this federal contract opportunity

Other files attached to MMAC Base Maintenance Renovation, newest first.
File Type Posted
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 Drawing Revisions.pdf PDF
Amendment 0003.pdf PDF
20. Amendment 0002.pdf PDF
Revised Attachment 10-BMB Past Performance Survey-dated 6-29-2020.pdf PDF
Amendment 0001.pdf PDF
Attachment 12-OCAT 00320 Business Relationship Affidavit (002).pdf PDF
Attachment 3b-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1-R1 pages 26thru45.pdf PDF
Attachment 3c-MMAC-BMB Type BFinal IFC Drawings-VOLUME 1_R1 pages 46thru90.pdf PDF
Attachment 3d-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 91thru140.pdf PDF
Attachment 2 MMAC-BMB-Type B-Final IFC Specifications-R1.pdf PDF
Attachment 1-Section B-Supplies or Services-Prices.pdf PDF
Attachment 4-Chapter_33 Construction Safety.pdf PDF
Attachment 7-SF25A.pdf PDF
Attachment 10-BMB Past Performance Survey.pdf PDF
Attachment 5-DAVIS BACON WAGE DETERMINATION.pdf PDF
Attachment 11-Client Authorization Letter.pdf PDF
Attachment 6-SF 25.pdf PDF
Attachment 3-Volume 2-MMAC-BMB Type B-Final IFC Drawings-VOLUME 2-R1.pdf PDF
16. 6973GH-20-R-00062.pdf PDF
Attachment 13 OCAT 00310 Anti Non-Collusion Affidavit.pdf PDF
Attachment 9-Operational Control Docs.pdf PDF
Attachment 3e-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 141thru173.pdf PDF
Attachment 3a-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 1thru25.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form DOT F 4220.4 (Rev. 5/05) (word) PREVIOUS EDITION OBSOLETE AUTHORIZED FOR LOCAL REPRODUCTION

DEPARTMENT OF TRANSPORTATION

CONTRACTOR'S RELEASE

CONTRACTOR (Name and Address)

CONTRACT NO.

ENTER SUM OF TOTAL OF AMOUNTS PAID

AND PAYABLE

Pursuant to the terms of the above numbered contract and in consideration of the sum stated above, which has been paid or is to be paid to the Contractor, or its assignees, the Contractor, upon payment of the said sum by the UNITED STATES OF AMERICA (hereinafter called the Government), does remise, release, and discharge the Government, its officers, agents, and employees, of and from all liabilities, obligations, claims, and demands whatsoever under or arising from the said contract, except:

1. Specified claims in stated amounts or in estimated amounts where the amounts are not susceptible of exact statement by the Contractor, as follows: (or state "None")

2. Claims, together with reasonable expenses incidental thereto, based upon the liabilities of the Contractor to third parties arising out of the performance of this contract, which are not known to the Contractor on the date of the execution of this release and of which the Contractor gives notice in writing to the Contracting Officer within the period specified in the said contract; and

3. Claims for reimbursement of costs (other than expenses of the Contractor by reason of his indemnification of the Government against patent liability) including reasonable expenses incidental thereto, incurred by the Contractor under any provisions of the said contract relating to patents.

The Contractor agrees, in connection with patent matters and with claims which are not released as set forth above, that it will comply with all provisions of the said contract, provisions of the said contract, including without limitation those provisions relating to notification to the Contracting Officer and relating to the defense or prosecution of litigation.

IN WITNESSES WHEREOF, this release has been executed this _______ day of ___________________, 19 ___.

WITNESSES

(Contractor)

BY _______________________

____________________________________ TITLE _______________________

NOTE: In the case of a corporation, witnesses are not required but the below statement must be completed.

I, _________________________________, am the _______________________ secretary of the corporation named as Contractor in the foregoing release; that _____________________ who signed said release on behalf of the Contractor was then _______________________ of said corporation; release was duly signed for and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

Signature

File details come from the government source that posted it. Updated .