Attachment 1-Section B-Supplies or Services-Prices.pdf
PDF 80 KB Posted
- Attached to
- MMAC Base Maintenance Renovation Federal contract opportunity
- Solicitation number
- 6973GH-20-R-00062
About this file
This document includes a price sheet and description for a federal solicitation seeking renovation services. The successful offeror will provide all labor, materials, equipment and supplies necessary to complete the renovation of the Base Maintenance Building at the Mike Monroney Aeronautical Center for the Federal Aviation Administration. Services include seismic concrete work, steel installation, exterior walls and doors, various utility and system installations, roof replacement, electrical work excluding telecommunications and security, and mechanical and fire suppression systems. Offerors should provide pricing for the base renovation project and three optional additions involving a north canopy, west canopy and patio, and a parking lot expansion. The solicitation also requires a price for maintenance security.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM SUPPLIES/SERVICES TOTAL
0001 Base Maintenance Building Renovation $
0002 Optional Item 1 - North Canopy $
Add canopy, perforated metal screen wall and foundations. Refer to Drawing Sheet A-102
0003 Optional Item 2 - West Canopy, Planter and Patio $
Add canopy, performated metal screen wall and foundations, concrete planter and bench, planter drainage and concrete patio. Refer to Drawing Sheet A-103.
0004 Optional Item 3 - Parking Lot $
Construct parking lot addition and associated sidewalks, lighting, etc., as shown in drawings. Refer to Drawing Sheets C-101, C-102 and C-105
0005 Maintenance/Defect Security $
Constractor shall provide cost of providing the Maintenance/Defect Security as required in Clause H.8.
Total Proposal Including All Options $
CLIN Worksheet The contractor shall furnish a price for all labor, tools, materials, equipment, and supplies, necessary to accomplish the following breakout items. The pricing of these items will not affect the project award. These prices should be included in prices above and are only for FAA internal use.
0001 Base Maintenance Building
Seismic Concrete $
Seismic Steel $
Exterior Walls, Doors and Windows $
Plumbing - Utility Services and Roof Drain System (Restrooms and Break Areas not included) $
Roof Replacement (not including Shop Area) $
Electrical (not including telecommunication or security) $
Mechanical $
Natural Gas $
Fire Suppression $
DTFAAC-17-R-00187
PART I - SECTION B
SUPPLIES OR SERVICES AND PRICES/COST
The contractor shall furnish all personnel, materials, equipment, training, supplies, and other items necessary to perform all work necessary for the Base Maintenance Building Renovation in accordance with all terms, conditions, and provisions set forth herein.
Table 1