20. Amendment 0002.pdf

PDF 496 KB Posted

Attached to
MMAC Base Maintenance Renovation Federal contract opportunity
Solicitation number
6973GH-20-R-00062
Issued by
Department of Transportation Federal Aviation Administration Non-Franchise Acquisition Services

About this file

This solicitation requests proposals for the renovation of the Base Maintenance Building at the Mike Monroney Aeronautical Center. Key requirements include providing all labor, supplies, equipment, and materials to complete renovations in accordance with specifications and drawings. Offerors should submit pricing for line items in Attachment 1, Section B of the solicitation. The Department of Transportation Federal Aviation Administration Non-Franchise Acquisition Services is the contracting agency. The response due date is not provided.

View the file

Other files for this federal contract opportunity

Other files attached to MMAC Base Maintenance Renovation, newest first.
File Type Posted
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 Drawing Revisions.pdf PDF
Amendment 0003.pdf PDF
Revised Attachment 10-BMB Past Performance Survey-dated 6-29-2020.pdf PDF
Amendment 0001.pdf PDF
Attachment 2 MMAC-BMB-Type B-Final IFC Specifications-R1.pdf PDF
Attachment 1-Section B-Supplies or Services-Prices.pdf PDF
Attachment 4-Chapter_33 Construction Safety.pdf PDF
Attachment 7-SF25A.pdf PDF
Attachment 10-BMB Past Performance Survey.pdf PDF
Attachment 5-DAVIS BACON WAGE DETERMINATION.pdf PDF
Attachment 11-Client Authorization Letter.pdf PDF
Attachment 6-SF 25.pdf PDF
Attachment 8-Contractor Release.pdf PDF
Attachment 3-Volume 2-MMAC-BMB Type B-Final IFC Drawings-VOLUME 2-R1.pdf PDF
16. 6973GH-20-R-00062.pdf PDF
Attachment 13 OCAT 00310 Anti Non-Collusion Affidavit.pdf PDF
Attachment 9-Operational Control Docs.pdf PDF
Attachment 3e-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 141thru173.pdf PDF
Attachment 3a-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 1thru25.pdf PDF
Attachment 12-OCAT 00320 Business Relationship Affidavit (002).pdf PDF
Attachment 3b-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1-R1 pages 26thru45.pdf PDF
Attachment 3c-MMAC-BMB Type BFinal IFC Drawings-VOLUME 1_R1 pages 46thru90.pdf PDF
Attachment 3d-MMAC-BMB Type B-Final IFC Drawings-VOLUME 1_R1 pages 91thru140.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

0002 06/19/2020

AAQ-731 FAC. & AVIATION SAFETY ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ0731-AFN

OKLAHOMA CITY OK 73125

AAQ-731 FAC. & AVIATION SAFETY ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ731-AFN

OKLAHOMA CITY OK 73125

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

6973GH-20-R-00062

1 copies to the issuing office.

06/19/2020

(x)

NOTE: The Line Items listed in Section B of this SIR are for Government use only.

Offerors shall complete Attachment 1, Section B/Pricing of this document for the contract line item pricing.

The purpose of Amendment 0002 is to advise potential offerors of a site visit to the mechanical room that was not available during the original site visit held on July 1, 2020 as well as provide Questions and Answers, dated July 9, 2020.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-20-R-00062/0002

FIRST: Since the mechanical room was not available during the site visit that was conducted on July 1, 2020, a site visit of the mechanical room only will be held on Tuesday, July 12, 2020 starting at 9:00 am. Attendees for the site visit should enter the Aeronautical

Center's main west entrance gate on South Regina

Avenue and proceed to the Security Command Center just inside this entrance. Service trucks will need to enter through the Commercial

Entrance on SW 74th Street. NOTE: During the site visit, the FAA will not be providing transportation to the Base Maintenance Building in order for potential offerors to view the worksite; therefore, offerors will be required to register their vehicles and provide documentation in order to travel to the Base Maintenance

Building. Due to COVID-19 pandemic, potential offerors are limited to one attendee ONLY at the site visit. Please, advise the

Contracting Officer (Cynthia Cooper, cynthia.cooper@faa.gov) in writing of your intent to attend by 5:00p.m., July 10, 2020. Telephone requests will NOT count as notification of attendance. Your request should include the name of the attendee, title of attendee, name of company and contact information to include phone number and email address. Due to the COVID-19 mandate restricting gatherings of 10 or less people, it will be necessary to conduct the site visits in shifts; therefore, it is very important that potential offerors notify the Contracting

Officer of your intent to attend the site visit as previously stated in this paragraph. At this time the FAA has already scheduled a site visit for 9:00 am and a second site visit for 10:00 am.

Depending on the number of responses, a third site visit may need to be scheduled.

DO NOT ASSUME THAT YOU CAN SIMPLY SHOW UP FOR THE

SITE VISIT UNLESS YOU HAVE NOTIFIED THE

CONTRACTING OFFICER IN ADVANCE PER THE

REQUIREMENTS STATED IN THIS PARAGRAPH.

SECOND: Questions and Answers dated July 9, 2020 are hereby incorporated into this amendment.

There are a number of questions that have been submitted and not yet answered. The FAA is

Continued ...

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-20-R-00062/0002

providing the complete list of questions so that potential offerors can see what questions have already been submitted in order to prevent duplications. Answers to the remaining questions will be provided in a SIR amendment in the near future.

THIRD: Potential offerors are reminded that SIR

Provision L.3 INSTRUCTIONS FOR PREPARATION AND

SUBMISSION OF PROPOSALS, paragraph (b) was specifically designed to say “Documentation shall be submitted electronically in accordance with

Section L, Provision 3.2.2.3-20. Clause

3.2.2.3-20 OFFERS (JAN 2018), paragraph (a) says

“The offeror (you) must submit responses to this

SIR by the following electronic means pdf version provided via email”. Potential offerors are advised that failure to comply with these instructions may result in your proposal not being considered. Potential offerors are further advised that there are size restrictions on attachments to emails that may be submitted in response to this SIR and are cautioned to not wait until the very last minute to submit proposals. AMS Clause 3.2.2.3-14 Late

Submissions, Modifications and Withdrawals of

Submittals is included in Section L of this SIR and will apply to any late proposals received.

BASE MAINTENANCE RENOVATION

6973GH-20-R-00062

QUESTIONS AND ANSWERS

JULY 9, 2020

Question 10: Specification 00 0102 Project information states Hazardous material removal is in our scope. However it does not elaborate on what the material is nor does it quantify the material. Could you please lets us know what this material is and approximately how much so we can properly quote?

Answer 10: FAA is performing the Asbestos remediation under another contract.

Lead-Based Paint removal/remediation is required to be performed by the contractor, and is addressed on drawing G-002, General Note 4. Please see attached Lead Paint Survey and attached floor plans.

Drawing AD100, Demo General Note 6, instructs the contractor to treat any PCB ballasts discovered, as hazardous waste. Presence of such ballasts is unknown.

We are not aware of any other hazardous materials in the building.

(Attachments)

Question 11: In chapter 33 construction safety, there is a reference made to follow OSHA regulations and MMAC policy (33-2). Can you please inform us as to the MMAC safety policy for construction projects?

Answer 11: The Reference is to FAA AC Order 3900.21, Chapter 33, Section 2, which states that “all” personnel including construction contractors must adhere to the Construction Safety requirements in Chapter 33 of the order. Please see attached FAA AC Order 3900.21, Chapter 33 and referenced FAA AC Order 3900.19 Chapters 13 and 17.

(Attachments)

Question 12: The mechanical and electrical sub-contractors are required to submit past performance surveys (or questionnaires). To whom do they submit them? Our discussion at the site lead me to believe that the General Contractors would submit ONE electrical PPS and ONE Mechanical PPS with our bid package. Please confirm.

Answer 12: The FAA envisions that the general contractor will decide who will be their mechanical and electrical subcontractor prior to submitting their proposal in response to this SIR. Provision L.3 of the SIR entitled Instructions for Preparation and Submission of Proposals, paragraph (f), Section II – Past Performance Information, states that the Offeror, along with their Mechanical and Electrical subcontractors, will send PPS to clients who are familiar with the work demonstrated through previous contracts of a similar nature. This paragraph also states that Offerors shall request a minimum of two

(2) with a maximum of four (4) Past Performance Surveys as a general contractor as well as a minimum of two (2) with a maximum of four (4) Past Performance Surveys for their mechanical subcontractor and a minimum of two (2) with a maximum of four (4) Past Performance Surveys for their electrical subcontractor. All completed PPS’s shall be submitted directly to the contracting officer at cynthia.cooper@faa.gov.

Question 13: Referencing the term mechanical contractor: Do BOTH the plumbing and HVAC sub-contractors need to submit a past performance survey or only the HVAC?

Answer 13: If the general contractor has selected a subcontractor that will be performing the plumbing portion of the contract and a separate subcontractor performing the HVAC portion of the contract, then PPS’s will be required for both subcontractors.

Question 14: The HVAC Duct Specification 230713 only list the outside air ducts and mixed air plenums to received insulation, what is the intent for the supply, return air & exhaust?

Answer 14:

Question 15: The HVAC Equip. 230716 & HVAC Piping 230719 list the equipment and piping systems but no schedule of materials or thicknesses, can this information be provided prior to bid?

Answer 15:

Question 16: Mechanical and Electrical Subcontractors are requesting a site visit to look at the basement area of the building. We understand that this area is still being abated and that access to this area was unavailable during the initial walkthrough. We request an additional walkthrough to this area and additional time of 2.5 weeks following the additional site visit in order for the mechanical/ electrical subcontractors to process the site visit information and complete their estimates.

Answer 16: BMB basement site visit to take place Tuesday, July 14th. Potential offerors shall follow the notification instructions included in SIR Amendment 0002 in order to register to attend this site visit.

Question 17: Page number G002 references that the general contractor is responsible for lead abatement. Can you provide an environmental report as to the locations of the lead contaminated areas?

Answer 17: Please see response to Question 10.

Question 18: The HVAC Duct Specification 230713 only list the outside air ducts and mixed air plenums to received insulation, what is the intent for the supply, return air & exhaust?

Answer 18:

Question 19: The HVAC Equip. 230716 & HVAC Piping 230719 list the equipment and piping systems but no schedule of materials or thicknesses, can this information be provided prior to bid?

Answer 19:

Question 20: Page PD 121 has a note (remove storm drain piping in hatched area) however there is no roof drain piping shown. Please advise.

Answer 20:

Question 21: What is the depth of the drilled piers shown the Detail 1/S-102?

Answer 21: Based on the geotech report, bidders should assume the bearing stratum is 19’-0” below finish floor.

Question 22: The bidding notes on sheet AD100 call for us to palletize and deliver carpet to building 50. Can you please identify where building 50 is, presuming it is on campus.

Answer 22:

Question 23: Sheet AD213 shows equipment X02 to be moved and stored and reinstalled (demo note Q06). What is equipment X02? (presume a copier)

Answer 23: X02 is an ice maker and X04 is a refrigerator.

Question 24: Regarding low voltage systems conduit

a. Will all systems be required complete pipe back to control source/closet?

Or

b. Can a cable tray be used in corridors back to closets and low voltage stub ups be routed to the tray?

c. If tray is acceptable can the systems cabling be installed on same tray system?

Answer 24:

Question 25: In the working hour clause F.1 it clearly indicates that all demo work is to be after hours 6 pm to 6 am. I want to inquire if this is a correct clause so I can communicate that to our bidding subcontractors.

My understanding is the building will be occupied in portions, but not necessary in the areas we are working and the building will not be fully occupied.

Can the demo take place during normal working hours?

Answer 25:

Question 26: When the structural criteria for the job is entered on the ISAT website for seismic design it says there is no seismic bracing required. Is Seismic bracing required for this job? If so, please provide required seismic criteria for seismic bracing design.

Answer 26:

Questions 27:

Doors C116B and C116C on the door schedule are referred to as being elevation 16.

Elevation 16 is not shown on the drawings. Please provide clarification.

Answer 27:

Questions 28:

Unit prices identified in 01 2700 are not listed on the bid form. Are the unit prices required to be submitted with our bid? If yes, please provide a revised bid form.

Answer 28:

Questions 29:

Drawing S-100 calls for unit pricing for drilled pier casings per lf and per pier. Is this unit pricing to be provided? If so, please add to the list of unit prices.

Answer 29:

Questions 30:

The solicitation F.3 Work by others, states that asbestos containing materials will be removed by others. Drawing G-002 Demo General Note 5 states that there is also lead-based paint to be mitigated/removed by the general contractor. Is the lead-based paint mitigation/removal by others as well? If not, what are the extents of the lead-based paint that needs to be mitigated/removed? Is there a test report defining the extent of this work? If so, please provide.

Answer 30: Please see response to Question 10.

Questions 31:

The solicitation F.3 Work by others, states that asbestos abatement must be accommodated by the general contractor in the construction schedule. It is our understanding that the asbestos abatement is currently taking place. Will the abatement be complete prior to the start of construction? If not, please provide the anticipated durations, by phase that need to be accommodated in the construction schedule.

Answer 31:

Questions 32: Please confirm that the standard warranty on the project is one year.

Answer 32: Refer to Clause 3.10.1-20 for construction warranties.

Question 33: During the site visit, there were some areas that were inaccessible. Will an additional site visit be available? If so, will subcontractors be permitted to attend?

Answer 33: Site visit for the BMB basement will be scheduled for Tuesday, July 14th.

Potential offerors shall follow the notification instructions included in SIR Amendment 0002 in order to register to attend this site visit.

Question 34: With the possibility of another site visit, will the proposal due date be extended?

Answer 34: Given that there are still quite a few questions that have been submitted and not answered at this time, it is likely that the SIR closing date will be extended. At this time, the FAA does not know what the new SIR closing date will be.

Question 35: Section 01 10 00, Paragraph 1.03, Item C, Phase #1 Completion of Work states the period of performance for this work 820 calendar days. Item D, Phase #2, states this work cannot start for 60 days after Phase #1 is complete. However, a period of performance is not provided. Please provide POP for Phase #2.

Answer 35: 820 calendar days is for the complete project all phases included. The 60 days is for the time in between Phase 1 and Phase 2.

Question 36:

Here is another RFI asking for clarifications about duct types and insulation requirements. The Plumbing Spec seems to have enough of the information needed, but the HVAC Duct (230713) only lists the Outside Air Ducts and Mixed Air Plenums to receive insulation, what will the S/A and R/A require? The HVAC Equip. (23016) and HVAC Pipe (230719) lists all of the Equip. & Pipe Systems but no schedule of materials or thicknesses. There appears to be quite a bit of exposed areas on this project as well and that is not addressed in any of the spec. sections. Will the exposed ducts receive external insulation, will they be lined or is no insulation required?

Answer 36:

Question 37: Can proposals in response to this SIR be submitted in person?

Answer 37: Potential offerors need to keep in mind that access to the Mike Monroney Aeronautical Center has been reduced due to COVID-19 restrictions. Potential offerors also need to keep in mind that contracting personnel from AAQ have been working remotely for several months due to COVID-19 restrictions and will continue to work remotely for some time to come. Because of these situations, SIR Provision L.3

INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF PROPOSALS,

paragraph (b) was specifically designed to say “ Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20. Clause 3.2.2.3-20 OFFERS (JAN 2018), paragraph (a) says “The offeror (you) must submit responses to this SIR by the following electronic means pdf version provided via email”. Potential offerors are advised that failure to comply with these constructions may result in your proposal not being considered. Potential offerors are further advised that there are size restrictions on attachments to emails that may be submitted in response to this SIR and are cautioned to not wait until the very last minute to submit proposals. AMS Clause 3.2.2.3-14 Late Submissions, Modifications and Withdrawals of Submittals is included in Section L of this SIR and will apply to any late proposals received.

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

BASE MAINTENANCE BUILDING

AutoCAD SHX Text 1st Floor

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 144A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

VENDING

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text 137A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 106A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SLIDING GATE

AutoCAD SHX Text E-105

AutoCAD SHX Text E-105A

AutoCAD SHX Text S-129

AutoCAD SHX Text W-120B

AutoCAD SHX Text W-120C

AutoCAD SHX Text W-120

AutoCAD SHX Text W-120A

AutoCAD SHX Text W-117

AutoCAD SHX Text W-116A

AutoCAD SHX Text W-138

AutoCAD SHX Text N-144

AutoCAD SHX Text E-114C

AutoCAD SHX Text E-109

AutoCAD SHX Text E-114B

AutoCAD SHX Text E-114A

AutoCAD SHX Text E-105G

AutoCAD SHX Text E-109A

AutoCAD SHX Text E-105F

AutoCAD SHX Text E-105E

AutoCAD SHX Text E-105D

AutoCAD SHX Text E-105C

AutoCAD SHX Text E-105B

AutoCAD SHX Text

N-114RH

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

HATCH

AutoCAD SHX Text

AN-WALL-HEAD

AutoCAD SHX Text

AN-WALL

AutoCAD SHX Text

AN-DOOR

AutoCAD SHX Text E.P.

AutoCAD SHX Text E.P.

AutoCAD SHX Text 106A1

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

PROJECTOR SCREEN

AutoCAD SHX Text 106B

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CABINET

AutoCAD SHX Text 24x48

AutoCAD SHX Text

OVERHEAD

AutoCAD SHX Text

PROJECTOR

AutoCAD SHX Text 137F

AutoCAD SHX Text 137E

AutoCAD SHX Text 137B

AutoCAD SHX Text 137K

Elizabeth M King Rectangle

Elizabeth M King Rectangle

Elizabeth M King Polygonal Line

Elizabeth M King Rectangle

Elizabeth M King Text Box

LEAD POSITIVE

Elizabeth M King Text Box

LEAD POSITIVE

Elizabeth M King Text Box

LEAD POSITIVE

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

BASE MAINTENCE BUILDING

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

CHASE

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

UP

Elizabeth M King Text Box

LEAD POSITIVE

Elizabeth M King Rectangle

Base Maintenance Building

Lead Paint Survey – 11/15/2018

Location Lead Results Location Results mg/cm2 Positive mg/cm2 Positive

Building Exterior North Vend Area Walls 0.0 Negative

South Entrance Blue Green

Paint

1.82 Positive North Main Hall Walls 0.0 Negative

South Entrance Blue Green

Paint

1.05 Positive

South Wall Blue Green Paint 1.04 Positive Men/Women Rest Room Walls

(North Side)

0.0 Negative

West Side Gas Line Yellow 0.0 Negative Men/Women Rest Room Floors

(North Side)

0.0 Negative

West Doors Tan 0.02 Negative Room 144/143/138 Walls 0.0 Negative

West garage doors 0.06 Negative Room 144/143/138 Windows 0.0 Negative

Generator Green 0.0 Negative Room 136 Walls 0.0 Negative

Mechanical Room Double Door

Tan

0.02 Negative Room 136 Windows/Doors 0.0 Negative

Mechanical Room Garage Door

Tan

0.0 Negative Room 115 Walls 0.0 Negative

Mechanical room door Tan 0.0 Negative Room 115 Doors 0.0 Negative

Window Frame Tan 0.0 Negative Room 118 Walls 0.0 Negative

HVAC 3 0.0 Negative Room 118 Doors 0.0 Negative

HVAC 2 0.0 Negative Room 113 Walls 0.0 Negative

HVAC 1 0.0 Negative Room 113 Doors 0.0 Negative

North entrance canopy cover 0.0 Negative Room 117 Walls 0.0 Negative

North Ballard post 0.0 Negative Room 117 Doors 0.0 Negative

Inside Building Room 112 Walls 0.0 Negative

R137 Walls

Room

Doors

Negative Room 112 Doors 0.0 Negative

R137 Doors

Room

Walls

Negative Room 111 Walls 0.0 Negative

Location Lead Results

Location Results mg/cm2 Positive mg/cm2 Positive

Room 111 Doors 0.0 Negative Mechanical Room Chiller 1

Pipes

0.0 Negative

Room 110 Walls 0.0 Negative Mechanical Room Chiller 2

Pipe

0.41 Positive

Room 110 Doors 0.0 Negative Vent Hood North Shop R136 1.75 Positive

Room 128 Walls 0.0 Negative

Room 128 Doors 0.0 Negative

Room 108 Walls 0.0 Negative

Room 108 Doors 0.0 Negative

Room 106 Walls 0.0 Negative

Room 106 Doors 0.0 Negative

Room 104 Walls 0.0 Negative

Room 104 Doors 0.0 Negative

Room 129 Walls 0.0 Negative

Room 129 Doors 0.0 Negative

Room 109 Walls 0.0 Negative

Room 109 Doors 0.0 Negative

Vent Hood Room 136 1.75 Positive

E105B Shop Wall West 0.59 Positive

E105C Wall 0.0 Negative

E105D Wall 0.0 Negative

Mechanical Room Walls 0.0 Negative

Mechanical Room AHU’s 0.0 Negative

03/11/2019 3900.19C

Chapter 13. Welding, Cutting, and Brazing

13-1. Introduction. This chapter establishes policy for welding, cutting, and brazing operations performed at FAA workplaces or on FAA projects. This chapter primarily addresses 29 CFR § 1910 Subpart Q Welding, Cutting, and Brazing. Respiratory Protection regulatory requirements are found in Chapter 9 and air contaminants regulatory requirements in Chapter 15.

13-2. Welding, Cutting, and Brazing Policy.

a. Scope. This scope includes, but is not limited to, employees involved in welding, cutting, and brazing activities as well as associated and unassociated bystanders. The policy includes minimizing occupational exposure to welding, cutting, and brazing hazards and proactively preventing injury or damage resulting from fire by providing guidance on fire hazard guards, fire extinguishing equipment, fire watches, ventilation requirements, and other fire prevention methods.

b. Objectives. The primary objective of this policy is the prevention of welding, cutting, and brazing-related injuries and illnesses through established and implemented safety and healthy activities and controls.

c. Regulatory Requirements. The FAA OSH Policy is to comply with all the following regulations and IBR standards listed below, as applicable to each LOB, Staff Office’s, or Center’s occupational hazards:

(1) 29 CFR § 1910.251 to 255 (Subpart Q) Welding, Cutting, and Brazing.

(a) 29 CFR § 1910.251 Definitions.

(b) 29 CFR § 1910.252 General requirements.

(i) API 1104 (1968) Standard for Welding Pipelines and Related Facilities.

(ii) API 2201 (1963) Welding or Hot Tapping on Equipment Containing Flammables.

(iii) ANSI Z54.1-63 Safety Standard for Non-Medical X-Ray and Sealed Gamma Ray Sources.

(iv) ANSI Z87.1-2003, American National Standard Practice for Occupational and Educational Eye and Face Protection.

(v) ASTM B 88-66A, Seamless Copper Water Tube.

(vi) NFPA 51B-1962 Standard for Fire Protection in Use of Cutting and

Welding Processes.

(c) 29 CFR § 1910.253 Oxygen-fuel gas welding and cutting.

(i) ANSI A13.1-56 Scheme for the Identification of Piping Systems.

(ii) ANSI B31.1-67 Power Piping.

(iii) ANSI B57.1-65 Compressed Gas Cylinder Valve Outlet and Inlet

Connections.

13-1 https://osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10133 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9852 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9853 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9854

(iv) CGA 1957 Standard Hose Connection Standard.

(v) CGA 1958 Regulator Connection Standard.

(vi) CGA and Rubber Manufacturer’s Association (RMA) Specification for Rubber Welding Hose (1958).

(vii) NFPA 80-1970 Standard for the Installation of Fire Doors and

Windows.

(viii) NFPA 566-1965 Standard for the Installation of Bulk Oxygen

Systems at Consumer Sites.

(d) 29 CFR § 1910.254 Arc welding and cutting.

(i) ANSI C33.2-56 Safety Standard for Transformer-Type Arc Welding Machines.

(ii) National Electrical Manufacturer’s Association (NEMA) EW-1 (1962) Requirements for Electric Arc Welding Apparatus.

(e) 29 CFR § 1910.255 Resistance welding.

(2) 29 CFR § 1910.1026 Chromium (VI).

(3) 29 CFR § 1926.350 to 354 (Subpart J) Welding and Cutting.

(a) 29 CFR § 1926.350 Gas welding and cutting.

(i) ANSI Z49.1-1967, Safety in Welding and Cutting.

(b) 29 CFR § 1926.351 Arc welding and cutting.

(c) 29 CFR § 1926.352 Fire prevention.

(d) 29 CFR § 1926.353 Ventilation and protection in welding, cutting, and heating.

(e) 29 CFR § 1926.354 Welding, cutting, and heating in way of preservative coatings.

(4) 29 CFR § 1926.1126 Chromium (VI).

(5) 49 CFR § 192.221-245 Subpart E, Welding of Steel in Pipelines.

13-2 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9855 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=9856 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=13096 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10696 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10697 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10698 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10699 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10699 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10700 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10700 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=13117 https://www.gpo.gov/fdsys/search/pagedetails.action;jsessionid=-Bx2I7R7dYCETL-KNwRp-0QN9mQrmch0urVOz9W92EAT9Mw_NDTO!774614877!-304109169?browsePath=Title+49%2FSubtitle+B%2FChapter+I%2FSubchapter+D%2FPart+192%2FSubpart+E&granuleId=CFR-2010-title49-vol3-part192-subpartE&packageId=CFR-2010-title49-vol3&collapse=true&fromBrowse=true

Chapter 17. Construction Safety and Health

17-1. Introduction. This chapter establishes policy for construction-related occupational duties including but is not limited to alteration and/or repair, including painting and decorating.

OSHA also defines construction as repair of existing workplaces, replacement of structures and components, and this definition must be referred to for clarification when an activity cannot be easily classified as construction or maintenance. This chapter primarily addresses 29 CFR § 1926 Safety and Health Regulations for Construction.

17-2. Construction Safety and Health Policy.

a. Scope. This scope includes, but is not limited to, employees involved in design, acquisition, installation, modification, alteration, maintenance, service work, and equipment operation during stages of construction, renovation, demolition, installation and commissioning.

The FAA must ensure the safety and health of employees is maintained when they are exposed to occupational hazards during construction activities.

b. Objectives. The primary objectives include the following focus areas:

(1) Prevention of construction-related injuries through established and implemented safety and health requirements by incorporating accepted engineering and administrative controls allowing employees to anticipate, recognize, evaluate, and control construction-related safety and health concerns.

(2) Ensuring regulatory requirements within 29 CFR § 1910 and 29 CFR § 1926 are addressed within this or other chapters of this order.

(3) Ensuring new construction, equipment installation, or facility upgrades are designed, constructed, and installed to eliminate or engineer out or minimize safety and health hazards.

c. Regulatory Requirements. The FAA OSH Policy is to comply with all the following regulations and IBR standards listed below, as applicable to each LOB, Staff Office’s, or Center’s occupational hazards:

(1) 29 CFR § 1926.1 to 6 (Subpart A) General.

(a) 29 CFR § 1926.1 Purpose and scope.

(b) 29 CFR § 1926.2 Variances from safety and health standards.

(c) 29 CFR § 1926.3 Inspections - right of entry.

(d) 29 CFR § 1926.4 Rules of practice for administrative adjudications for enforcement of safety and health standards.

(e) 29 CFR § 1926.5 OMB control numbers under the Paperwork Reduction

Act.

(f) 29 CFR § 1926.6 Incorporation by reference.

(2) 29 CFR § 1926.10 to 16 (Subpart B) General Interpretations.

17-1 https://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=1&p_keyvalue=1926 https://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=1&p_keyvalue=1926 https://osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=1&p_keyvalue=1910 https://osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=1&p_keyvalue=1926 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10594 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10595 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10596 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10597 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10597 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10598 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10598 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=14224

(a) 29 CFR § 1926.10 Scope of subpart.

(b) 29 CFR § 1926.11 Coverage under section 103 of the act distinguished.

(c) 29 CFR § 1926.12 Reorganization Plan No. 14 of 1950.

(d) 29 CFR § 1926.13 Interpretation of statutory terms.

(e) 29 CFR § 1926.14 Federal contracts for "mixed" types of performance.

(f) 29 CFR § 1926.15 Relationship to the Service Contract Act; Walsh-

Healey Public Contracts Act.

(g) 29 CFR § 1926.16 Rules of construction.

(3) 29 CFR § 1926.20 to 30 (Subpart C) General Safety and Health Provisions.

(a) 29 CFR § 1926.20 General safety and health provisions.

(b) 29 CFR § 1926.25 Housekeeping.

(c) 29 CFR § 1926.26 Illumination.

(d) 29 CFR § 1926.27 Sanitation.

(e) 29 CFR § 1926.29 Acceptable certifications.

(f) 29 CFR § 1926.30 Shipbuilding and ship repairing.

(4) 29 CFR § 1926.50 to 66 (Subpart D) Occupational Health and Environmental Controls.

(a) 29 CFR § 1926.50 Medical services and first aid.

(b) 29 CFR § 1926.51 Sanitation.

(c) 29 CFR § 1926.53 - Ionizing radiation.

(d) 29 CFR § 1926.54 - Nonionizing radiation.

(e) 29 CFR § 1926.55 Gases, vapors, fumes, dusts, and mists.

(f) 29 CFR § 1926.55 Appendix A - Gases, vapors, fumes, dusts, and mists.

(g) 29 CFR § 1926.56 Illumination.

(h) 29 CFR § 1926.57 Ventilation.

(i) 29 CFR § 1926.61 Retention of DOT markings, placards and labels.

(j) 29 CFR § 1926.64 Process safety management of highly hazardous chemicals.

(k) 29 CFR § 1926.65 Hazardous waste operations and emergency response.

(l) 29 CFR § 1926.66 Criteria for design and construction for spray booths.

(5) 29 CFR § 1926.95 to 107 (Subpart E) Personal Protective and Life Saving Equipment.

(a) 29 CFR § 1926.95 Criteria for personal protective equipment.

(b) 29 CFR § 1926.104 Safety belts, lifelines, and lanyards.

17-2 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10599 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10600 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10601 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10602 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10603 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10604 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10604 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10605 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10606 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10611 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10612 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10613 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10615 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10616 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10622 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10624 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10626 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10627 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10628 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10629 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10630 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10631 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10640 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10646 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10646 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10651 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10657 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10658 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10667

(c) 29 CFR § 1926.105 Safety nets.

(d) 29 CFR § 1926.106 Working over or near water.

(e) 29 CFR § 1926.107 Definitions applicable to this subpart.

(6) 29 CFR § 1926.150 to 159 (Subpart F) Fire Protection and Prevention.

(a) 29 CFR § 1926.150 Fire protection.

(b) 29 CFR § 1926.151 Fire prevention.

(c) 29 CFR § 1926.152 Flammable and combustible liquids.

(d) 29 CFR § 1926.153 Liquefied petroleum gas (LP-Gas).

(e) 29 CFR § 1926.154 Temporary heating devices.

(f) 29 CFR § 1926.155 Definitions applicable to this subpart.

(g) 29 CFR § 1926.156 Fixed extinguishing systems, general.

(h) 29 CFR § 1926.157 Fixed extinguishing systems, gaseous agent.

(i) 29 CFR § 1926.158 Fire detection systems.

(j) 29 CFR § 1926.159 Employee alarm systems.

(7) 29 CFR § 1926.200 to 203 (Subpart G) Signs, Signals, and Barricades.

(a) 29 CFR § 1926.200 Accident prevention signs and tags.

(b) 29 CFR § 1926.201 Signaling.

(c) 29 CFR § 1926.202 Barricades.

(d) 29 CFR § 1926.203 Definitions applicable to this subpart.

(8) 29 CFR § 1926.250 to 252 (Subpart H) Materials Handling, Storage, Use, and Disposal.

(a) 29 CFR § 1926.250 General requirements for storage.

(b) 29 CFR § 1926.251 Rigging equipment for material handling.

(c) 29 CFR § 1926.252 Disposal of waste materials.

(9) 29 CFR § 1926.300 to 307 (Subpart I) Tools - Hand and Power.

(a) 29 CFR § 1926.304 Woodworking tools.

(b) 29 CFR § 1926.305 Jacks - lever and ratchet, screw and hydraulic.

(c) 29 CFR § 1926.306 Air Receivers.

(d) 29 CFR § 1926.307 Mechanical power-transmission apparatus.

(10) 29 CFR § 1926.350 to 354 (Subpart J) Welding and Cutting.

(a) 29 CFR § 1926.350 - Gas welding and cutting.

(b) 29 CFR § 1926.351 - Arc welding and cutting.

(c) 29 CFR § 1926.352 - Fire prevention.

17-3 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10668 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10669 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10670 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10671 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10672 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10673 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10674 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10675 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10676 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10677 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10678 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10679 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10680 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10681 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10682 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10683 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10684 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10685 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10686 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10687 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10692 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10693 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10694 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10695 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10696 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10697 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10698

(d) 29 CFR § 1926.353 - Ventilation and protection in welding, cutting, and heating.

(e) 29 CFR § 1926.354 - Welding, cutting, and heating in way of preservative coatings.

(11) 29 CFR § 1926.400 to 449 (Subpart K) Electrical.

(a) 29 CFR § 1926.404 Wiring design and protection.

(b) 29 CFR § 1926.405 Wiring methods, components, and equipment for general use.

(c) 29 CFR § 1926.406 Specific purpose equipment and installations.

(d) 29 CFR § 1926.407 Hazardous (classified) locations.

(e) 29 CFR § 1926.408 Special systems.

(f) 29 CFR § 1926.431 Maintenance of equipment.

(g) 29 CFR § 1926.432 Environmental deterioration of equipment.

(h) 29 CFR § 1926.441 Battery locations and battery charging.

(i) 29 CFR § 1926.449 Definitions applicable to this subpart.

(12) 29 CFR § 1926 Subpart L – Scaffolds.

(a) Appendix A to Subpart L – Scaffold Specifications.

(b) Appendix B To Subpart L – Criteria for Determining the Feasibility of

Providing Safe Access and Fall Protection for Scaffold Erectors and Dismantlers.

(c) Appendix C To Subpart L – List of National Consensus Standards.

(d) Appendix D To Subpart L – List of Training Topics for Scaffold

Erectors and Dismantlers.

(e) Appendix E To Subpart L – Drawings and Illustrations.

(13) 29 CFR § 1926.500 to 503 Subpart M - Fall Protection.

(a) 29 CFR § 1926.500 Scope, application, and definitions applicable to this subpart.

(b) 29 CFR § 1926.501 Duty to have fall protection.

(c) 29 CFR § 1926.502 Fall protection systems criteria and practices.

(14) 29 CFR § 1926.551 to 555 (Subpart N) Cranes, Derricks, Hoists, Elevators, and Conveyors.

(a) 29 CFR § 1926.552 Material hoists, personnel hoists and elevators.

(b) 29 CFR § 1926.553 Base-mounted drum hoists.

(c) 29 CFR § 1926.554 Overhead hoists.

(d) 29 CFR § 1926.555 Conveyors.

17-4 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10699 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10699 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10700 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10700 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10705 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10706 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10706 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10707 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10708 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10709 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10732 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10733 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10742 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10750 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10916 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10917 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10918 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10918 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10919 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10920 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10920 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10921 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10756 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10756 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10757 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10758 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10762 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10763 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10764 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10765

(15) 29 CFR § 1926.600 to 606 (Subpart O) Motor Vehicles, Mechanized Equipment, and Marine Operations.

(a) 29 CFR § 1926.600 Equipment.

(b) 29 CFR § 1926.603 Pile driving equipment.

(c) 29 CFR § 1926.604 Site clearing.

(d) 29 CFR § 1926.605 Marine operations and equipment.

(e) 29 CFR § 1926.606 Definitions applicable to this subpart.

(16) 29 CFR § 1926.650 to 652 (Subpart P) Excavations.

(a) 29 CFR § 1926.650 Scope, application, and definitions applicable to this subpart.

(b) 29 CFR § 1926.651 Specific Excavation Requirements.

(c) 29 CFR § 1926.652 Requirements for protective systems.

(d) Appendix A To Subpart P - Soil Classification.

(e) Appendix B To Subpart P - Sloping And Benching.

(f) Appendix C To Subpart P - Timber Shoring For Trenches.

(g) Appendix D To Subpart P - Aluminum Hydraulic Shoring For Trenches.

(h) Appendix E To Subpart P - Alternatives To Timber Shoring.

(i) Appendix F To Subpart P - Selection Of Protective Systems.

(17) 29 CFR § 1926.700 to 706 (Subpart Q) Concrete and Masonry Construction.

(a) 29 CFR § 1926.700 Scope, application, and definitions, applicable to this subpart.

(b) 29 CFR § 1926.701 General requirements.

(c) 29 CFR § 1926.702 Requirements for equipment and tools.

(d) 29 CFR § 1926.703 Requirements for cast-in-place concrete.

(e) 29 CFR § 1926.704 Requirements for precast concrete.

(f) 29 CFR § 1926.705 Requirements for lift-slab construction operations.

(g) 29 CFR § 1926.706 Requirements of masonry construction.

(h) Appendix To Subpart Q - References To Subpart Q of Part 1926.

(18) 29 CFR § 1926.750 to 761 (Subpart R) Steel Erection.

(a) 29 CFR § 1926.750 Scope.

(b) 29 CFR § 1926.751 Definitions.

(c) 29 CFR § 1926.752 Site layout, site-specific erection plan and construction sequence.

(d) 29 CFR § 1926.753 Hoisting and rigging.

17-5 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10767 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10770 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10771 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10772 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10773 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10774 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10774 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10775 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10776 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10931 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10932 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10933 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10934 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10935 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10936 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10777 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10777 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10778 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10779 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10780 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10782 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10783 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10785 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10938 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10786 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10787 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10788 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10788 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10789

(e) 29 CFR § 1926.754 Structural steel assembly.

(f) 29 CFR § 1926.755 Column anchorage.

(g) 29 CFR § 1926.756 Beams and columns.

(h) 29 CFR § 1926.757 Open web steel joists.

(i) 29 CFR § 1926.758 Systems-engineered metal buildings.

(j) 29 CFR § 1926.759 Falling object protection.

(k) 29 CFR § 1926.760 Fall protection.

(l) 29 CFR § 1926.761 Training.

(m) Appendix G to Subpart R - Fall Protection Systems Criteria and

Practices.

(19) 29 CFR § 1926.800 to 804 (Subpart S) Tunnels and Shafts, Caissons, Cofferdams, and Compressed Air.

(a) 29 CFR § 1926.800 Underground construction.

(b) 29 CFR § 1926.801 Caissons.

(c) 29 CFR § 1926.802 Cofferdams.

(d) 29 CFR § 1926.803 Compressed air.

(e) 29 CFR § 1926.804 Definitions applicable to this subpart.

(f) Appendix A to Subpart S - Decompression Tables.

(20) 29 CFR § 1926.850 to 860 (Subpart T) Demolition.

(a) 29 CFR § 1926.850 Preparatory operations.

(b) 29 CFR § 1926.851 Stairs, passageways, and ladders.

(c) 29 CFR § 1926.852 Chutes.

(d) 29 CFR § 1926.853 Removal of materials through floor openings.

(e) 29 CFR § 1926.854 Removal of walls, masonry sections, and chimneys.

(f) 29 CFR § 1926.855 Manual removal of floors.

(g) 29 CFR § 1926.856 Removal of walls, floors, and material with equipment.

(h) 29 CFR § 1926.857 Storage.

(i) 29 CFR § 1926.858 Removal of steel construction.

(j) 29 CFR § 1926.859 Mechanical demolition.

(k) 29 CFR § 1926.860…

This is the start of the file's text. The full file is on GovTribe.