This federal contract opportunity solicitation seeks offers to complete renovation of the Base Maintenance Building at the Mike Monroney Aeronautical Center. The successful offeror will provide all labor, supplies, equipment, material and equipment to modernize Building 15 in accordance with specifications and drawings included in solicitation number 6973GH-20-R-00062. The Department of Transportation Federal Aviation Administration Non-Franchise Acquisition Services issued the solicitation seeking offers to update the facility through renovations as described in the attachments.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
C
R
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
9 9
8 8
7 7
6 6
A.5
A.5
B.5
6.1 6.1
FOR CONTINUATION, RE: SHEET AD218.
FOR CONTINUATION, RE: SHEET AD218.
D01
T01W10
D01
P01
W20
W12
D01
W12
TYP.
D01
Q05
Q04
Q01
TYP.
E-b E-05bE-05bE-05b E-50E-22
E-
E-
E-
AA
AA
F05
F05F05
F05
F05
F05
F05
F06
D03
M04
Q04
TYP.
F08
E-33
E-34 E-37 E-38 E-41
E-
E-
E-b
E-b E-b
E-b
E-b E-b E-b
E-50E-50 E-40
E-50E-50
E-35
E-36
E-05a
E-39
E-42
E-32
TEMPORARY DUST-PROOF
PARTITION
TEMPORARY DUST-PROOF
PARTITION
M06
D01
D02
E04
E04
D03 D01
D01
Q02
W10
W10
W10W10
Q06
Q06
M06 M06
W10
D01TEMPORARY DUST-PROOF
PARTITION
TEMPORARY FENCING
E04
'-0
3/ 4"
5'- 0 1
/2"
1 3/4" 21'-4 3/4" 2'-2 1/2"
E-108 E-108
E-108E-108 E-108E-108
E-
E-
D01
D01 D01
NO ENLARGED PLAN THIS PHASE
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
EF08
8" 2'-4
2'-0
4'-2" 8'-7" 2'-0" 3'-3"
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
IL
E:
PL
O
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:20:15 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 0:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION FLOOR PLAN - AREA
B - PHASE 1B
AD217BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD217
1 DEMOLITION PLAN - AREA B - PHASE 1B
0' 2' 4' 8' 16'
1/8" = 1'-0"
SYMBOL DESCRIPTION DATE APPR
C R
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
1 1
2 2
4 4
3 3
5 5
6 6
A.5
A.5
B.5
CCMS-O&M
CONTRACTORS
C111
SERVICE ORDER
DISPATCH
C110
6.1 6.1
FOR CONTINUATION, RE: SHEET AD217.
FOR CONTINUATION, RE: SHEET AD217.
D03
D01
W01
S01
D01
W11
W12
D01
W11
W02
W12
TYP.
D01
TYP.
D04
TYP.
C01
W12
D01
W02
T01
T01
T01
W13
W10
D01
P01
P01
W11
W10
TYP.
W02
C01
W12
D01
T02
W12
TYP.
D01
Q05
Q05
IF REQ'D
Q04
Q01
TYP.
Q01
TYP.
E-b E-05bE-05bE-05b E-50E-22
E-
E-
AA
AA
F04
F04F04
F04
F05
F05F05F05
F05
F05
F05
F05
F05
F05
F05
F05
F05
F04
F06
F06
F06
F05
F05
F0
F05 F05
F05
F06
C01
NOT SHOWN
±1'-1" ±23'-1"
E-15
E-01
E-14
F08
F08 F08
F08
F08
F08
TEMPORARY DUST-PROOF
PARTITION
TEMPORARY DUST-PROOF
PARTITION
TEMPORARY DUST-PROOF
PARTITION
M06
D01
D02
E04
E04
E04
Q02
Q06
Q06
M06 M06
W10
D01TEMPORARY DUST-PROOF
PARTITION
E-108 E-108
E-108E-108 E-108E-108
E-
E-
D01
D01 D01
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
TEMPORARY DUST-PROOF
PARTITION
MAINTAIN CLEAR CORRIDOR,
PROVIDE TEMPORARY
EMERGENCY LIGHTING, SIGNAGE,
ETC. AS REQUIRED FOR EGRESS
F08
8" 2'-4
2'-0
4'-2" 8'-7" 2'-0" 3'-3"
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:20:23 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 0:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION FLOOR PLAN - AREA
C - PHASE 1B
AD218BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD218
1 DEMOLITION PLAN - AREA C - PHASE 1B
0' 2' 4' 8' 16'
CR
C R
AA
BB
CC
DD
KK
JJ
HH
GG
FF
EE
A.
A.
B.
B.
6.
6.
.7
.7
A D
A D
A D
A D
±4 9 '-
5 1 /2"
AA AA
157'-8" 11'-3"
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 2
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 2
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
D
B CA
KEY PLAN
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated1/24/2020 11:07:13 AM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
1/
/2
:0 7:
A
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION FLOOR PLAN -
OVERALL - PHASE 2
AD220BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
N O
R
TH
SC
AL
E:
/1 6"
'-0
A- 1 0
AD
FL
O
O R
P L A
N
O V E
R
AL
L
- P
H
AS
E
D
E M O
LI
TI
O N
0' 4'
8'
1/
'-0
CR
A
A
B
B
C
C
15 15
14 14
13 13
12 12
11 11
10 10
9 9
A.5
A.5
B.5
14.7 14.7
FOR CONTINUATION, RE: SHEET AD222.
M02
W01
W01
D03
S02
D01
M03
M03
D04
W02
D04
T01
T01
C01
P02
W12
TYP.
W10
D03
D01
W14
D01
TYP.
D01
TYP.
AA
AA
F05 F05
F05
F05 F05 F05
F05 F05 F05
F05
F05
F05F05
F05
F05
F05
F05
F04
F04
F04
F04
F06
F06
D01
P01
±49'-5 1/2"
F08
F08F08
F08
F08
F08
F08
0'-
S04
S03
'-0
2'-4
10' -6"
2'-0
5'-4 1/2
3 1/2" 9'-2" 11'-0 1/2" 2'-0" 8'-3 1/2"
2'-0
7'-4 1/4
Q02
3'-0"
S05
S05
S03
S03S03
S04
W10
FOR CONTINUATION, RE: SHEET AD222.
W07
W07
W08
D04
W07
W07
REFER SHEETS AD321 & AD520
FOR ADDITIONAL DEMOLITION
ABOVE AT THIS WALL
F08
±1'-10" ±20'-10"
±1 '-6
±5
'-4
±1 8'-
0" ±5
'-5
±3 '-8
±1
4'-
±6
'-0
±1 8'-
0" ±8
±5
'-6
±1'-10" ±3'-10"
±2" ±3'-8"
±8'-0" ±1'-10" ±2"
±3'-8"
DC
B
A
KEY PLAN
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated1/24/2020 11:10:13 AM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
1/
/2
:1 0:
A
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION FLOOR PLAN - AREA
A - PHASE 2
AD221BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD221
1 DEMOLITION PLAN - AREA A - PHASE 2
0' 2' 4' 8' 16'
R
DC
B
A
KEY PLANA
A
B
B
C
C
D
D
9 9
8 8
7 7
6 6
A.5
A.5
B.5
6.1 6.1
FOR CONTINUATION, RE: SHEET AD221.
W01
D03
S02
M03
D01
D03
C01
P02
D03
D01
W10
D01
D03
D01
W12
W12
W14
AA
AA
F05 F05
±1 2'-9
±1
1'-3
F08
F08
F08F08
F08
F08
Q02
D01
2'-0
5'-4 1/2
25'
-1" 5'-0
1/2
3 1/2" 9'-2" 11'-0 1/2" 2'-0" 8'-3 1/2"
2'-0
7'-4 1/4
16'
-11 1/2
2'-0
5'-0
1/2
Q02
3 1/2" 30'-6" 63'-4" 1'-1"
3'-0"
S03
TEMPORARY FENCING
S05
S05
F09
W10
FOR CONTINUATION, RE: SHEET AD221.
NO ENLARGED PLAN THIS PHASE
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
TEMPORARY DUST-PROOF
PARTITION
W07
W07
REFER SHEETS AD322 & AD520
FOR ADDITIONAL DEMOLITION
ABOVE AT THIS WALL
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:20:48 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 0:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION FLOOR PLAN - AREA
B - PHASE 2
AD222BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SCALE: 1/8" = 1'-0"A-101 AD222
1 DEMOLITION PLAN - AREA B - PHASE 2
NORTH
0' 2' 4' 8' 16'
A
B
B
C
C
D
D
2 2
4 4
3 3
5 5
6 6
A.5
A.5 B.5
B.5
6.1 6.1
D02
D02
M06
NOT SHOWN
M02
TYP
E02
TYP
E02
TYP
E02
TYP
E02
TYP
E02
TYP
E02
TYP
E02
TYP
AA
AA
M06
NOT SHOWN
W15
W15
D01
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
DC
B
A
KEY PLAN
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:05 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN -
BASEMENT - PHASE 1
AD300BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SCALE: 1/8" = 1'-0"A-511 AD300
DEMOLITION CEILING PLAN - BASEMENT -
PHASE 1
NORTH
0' 2' 4' 8' 16'
AI
R
C
AI
R CAIR
CAIR
C
AI
R
LU
BE
M O
IL
M
O
IL
LU
BE
H
YD
R
M
M
M
M
M
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M
M
M
M
M
M
M
AA
BB
CC
DD
KK
JJ
HH
GG
FF
EE
A.
A.
B.
B.
6.
6.
.7
.7
AA AA
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 3
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A -3
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
D
B CA
KEY PLAN
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:17 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN -
OVERALL - PHASE 1A
AD310BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SC
AL
E:
/1 6"
'-0
A- 1 0
AD
C E I
LI
N
G P
LA
N
O
VE
R
AL
L
- P H
AS
E
1 A
D E M
O
LI
TI
O
N N
O R
TH
0' 4'
8'
1/
'- 0
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
1 1
2 2
4 4
3 3
5 5
6 6
A.5
A.5
B.5
6.1 6.1
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
4.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
4.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
4.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
4.
F02 F02
F02
F0
F02
M07
M02
M06
AA
AA
M06
M06
M06
NO ENLARGED PLAN THIS VIEWNO ENLARGED PLAN THIS PHASE
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:25 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
C - PHASE 1A
AD313BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD313
CEILING PLAN - FIRST FLOOR - DEMOLITION
- PHASE 1A - AREA C
0' 2' 4' 8' 16'
CAIR
C
AI
R
C
AI
R
CAIR
LUBE
MOIL
MOIL
LUBE
HYDR
DC
B
A
KEY PLAN
D
D
K
K
J
J
H
H
G
G
F
F
E
E
1 1
2 2
4 4
3 3
5 5
6 6
6.1 6.1
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
FO
R
C O
N
TI
N U
AT
IO
N , R
E:
S
H
EE
T A D
3.
F02
M05
M05 M05 M02
M06
M07
M02
M06
M06
M06
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:32 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
D - PHASE 1A
AD314BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD314
CEILING PLAN - FIRST FLOOR - DEMOLITION
- PHASE 1A - AREA D
0' 2' 4' 8' 16'
R
C
AI
R CAIR
CAIR
C
AI
R
LU
BE
M O
IL
M
O
IL
LU
BE
H
YD
R
O S
A D
A D
AA
BB
CC
DD
KK
JJ
HH
GG
FF
EE
A.
A.
B.
B.
6.
6.
.7
.7
A D
A D
AA AA
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 3
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 3
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
D
B CA
KEY PLAN
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:46 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN -
OVERALL - PHASE 1B
AD315BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
N O
R
TH
SC
AL
E:
/1 6"
'-0
A- 1 0
AD
C E I
LI
N
G P
LA
N
O
VE
R
AL
L
- P H
AS
E
1 B
D E M
O
LI
TI
O
N 0'
4' 8'
1/
'- 0
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
9 9
8 8
7 7
6 6
A.5
A.5 B.5
B.5
6.1 6.1
FOR CONTINUATION, RE: SHEET AD318.
FOR CONTINUATION, RE: SHEET AD318.
F01
TYP.
F02
F02 F02
F03
F01
ABV
F0
F02
F02
F02
F0
F01
ABV
AA
AA
M
M
M06
M06
M
F01
R10
ABV
NO ENLARGED PLAN THIS PHASE
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:21:56 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
B - PHASE 1B
AD317BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD317
1 DEMOLITION CEILING PLAN - AREA B
0' 2' 4' 8' 16'
OS
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
1 1
2 2
4 4
3 3
5 5
6 6
A.5
A.5 B.5
B.5
6.1 6.1
FOR CONTINUATION, RE: SHEET AD317.
F01
TYP.
F02 F02
F02
F02
F02
F02
F02
F02
F02F02F02
F02 F02
F02 F02
F02
F02
F02F0
F02
F03 F0
F03
F0
F03
R01
F01
ABV
F02
F02
AA
AA
16'-7 3/8" 34'-1 1/4" 21'-3 3/8"
EXISTING STEEL
FRAMING TO REMAIN
AT THIS AREA ONLY
M06
M
M
E04
M07
M06
M06
E02
E02
E02
TYP
MAINTAIN CLEAR
CORRIDOR, PROVIDE
TEMPORARY EMERGENCY
LIGHTING, SIGNAGE, ETC.
AS REQUIRED FOR EGRESS
R01
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:22:20 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 2:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
C - PHASE 1B
AD318BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD318
1 DEMOLITION CEILING PLAN - AREA C
0' 2' 4' 8' 16'
R
C
AI
R CAIR
CAIR
C
AI
R
LU
BE
M O
IL
M
O
IL
LU
BE
H
YD
R
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S
O S O
S
O S
O S
O S
O S
O S
O S
O S
O S
PCO
S
O S
O S O S
O S
O S
O S O
S
O S
O S
O S
O S
AA
BB
CC
DD
KK
JJ
HH
GG
FF
EE
A.
A.
B.
B.
6.
6.
.7
.7
A D
A D
A D
A D
AA AA
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
NO
E
NL
AR
GE
D
PL
AN
TH
IS
P
HA
SE
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 3
FO
R
EN
LA
RG
ED
P
LA
N, R
E:
S
HE
ET
A D 3
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
D
B CA
KEY PLAN
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:22:45 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 2:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN -
OVERALL - PHASE 2
AD320BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SC
AL
E:
/1 6"
'-0
A- 1 0
AD
C E I
LI
N
G P
LA
N
O
VE
R
AL
L
- P H
AS
E
D E M
O
LI
TI
O
N N
O R
TH
0' 4'
8'
1/
'- 0
DC
B
A
KEY PLAN
A
A
B
B
C
C
14 14
13 13
12 12
11 11
10 10
9 9
A.5
A.5 B.5
B.5
FOR CONTINUATION, RE: SHEET AD322.
F01 F01 F01
TYP.
W00
F02
F02
F02 F02
F02
F02
F02 F02
F02
TYP.
F02 F02
F03
F03F03
AA
AA
M06
Q02
1/
2"
'-1 1/
2"
'-0
8'- 0"
4'- 0"
'-0
4'-
0" 8'-
0" 2'-
0"
'-0
W01
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:22:50 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 2:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
A - PHASE 2
AD321BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD321
CEILING PLAN - FIRST FLOOR - DEMOLITION
- PHASE 2 - AREA A
0' 2' 4' 8' 16'
OS
OS
OS
OS
OS OS
OS
OS
OS
OS
OS
OS
OS
DC
B
A
KEY PLAN
A
A
B
B
C
C
D
D
9 9
8 8
7 7
6 6
A.5
A.5 B.5
B.5
6.1 6.1
FOR CONTINUATION, RE: SHEET AD321.
F01 F01 F01
TYP.
F01
AA
AA
W00
M06
'-0
2'-
0" 8'-
0" 4'-
0" 8'-
0" 4'-
0" 8'-
0"
Q02
W01
NO ENLARGED PLAN THIS PHASE
NO
E
NL
AR
GE
D
PL
AN
T
HI
S
PH
AS
E
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
WORK AREAS (WITHIN BUILDING)
FULLY OCCUPIED BY USER /
NO WORK THIS PHASE
UNDER CONSTRUCTION
OCCUPIED/LIMITED CONSTRUCTION -
COORDINATE WORK WITH USERS
(SITE NOT SHADED)
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:23:06 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 3:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION CEILING PLAN - AREA
B - PHASE 2
AD322BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
NORTH
SCALE: 1/8" = 1'-0"A-101 AD322
CEILING PLAN - FIRST FLOOR - DEMOLITION
- PHASE 2 - AREA B
0' 2' 4' 8' 16'
A D
A D
A D
A D
M
S0
S0
M 01S0
R
TY
P.
R
TY
P.
R
P0
P0
P0
P0
P0
M
M
M
M
M
M
M
R
R
R
R
M
M
M
M
M
R
TH
IS
A R
EA
P0
P0
M
R
R
TY
P.
R
TH
IS
A R
EA
R
TY
P.
F.V.
± 12'-0"
R
F.
V .
±4 4 '-
6 3 /8"
±3 4 '-
1 1 /4"
F .V
F.
V .
±2
5 '- 4 3
/8"
EX
IS
TI
NG
S
TE
EL
FR
AM
IN
G
TO
R
EM
AI
N
AT
T
HI
S
AR
EA
O
NL
Y
D
B CA
KEY PLAN
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 5:01:59 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:0 1:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION ROOF PLAN -
OVERALL - PHASE 1
AD410BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SC
AL
E:
/1 6"
'-0
AD
R O
O F
PL
A N
D
EM
O
L I
TI
O N
PH
A S E
N
O R
TH
0' 4'
8'
1/
'- 0
A D
A D
A D
A D
R
TY
P.
P0
P0
P0
P0
P0
P0
M
M 01M
M
M
M
M 01M
R
R
R
R
±27'-6" F.V.
D
B CA
KEY PLAN
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 5:02:51 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:0 2:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION ROOF PLAN -
OVERALL - PHASE 2
AD420BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SC
AL
E:
/1 6"
'-0
AD
R O
O F
PL
A N
D
EM
O
L I
TI
O N
PH
A S E
N
O R
TH
0' 4'
8'
1/
'- 0
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
A B C D KJHGFEA.5 B.5
W01
R01
W02
M01 S02
W03
S01
R05
E01
TYP.
M01 M01
±2'-8" ±24'-8" ±2'-8" ±34'-4"±2 '-1
0 5 /8"
±1 6'-
0"
AA
CANOPY FRAMING TO REMAIN
THIS AREA, RE: PLANS
±1'-1" ±23'-1"
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
12416 15 14 3513 12 11 10 9 8 7 66.114.7
D01D03 W02 R01
M01
S02
S02
M01
S02
S01
R05
M01
TYP.
E01
TYP.
M01
±1 6'-
3"
D02 D01
E01
TYP.
2'-4" ±8'-11" ±36'-5"
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
ABCDK J H G F E A.5B.5
S02 M01 M01
AA
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
1 2 4 1615143 5 131211109876 6.1 14.7
M01
M01
S02
S02 S02
D01W02R01
R05 R05 M01 M01
M01
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:24:10 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 4:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION ELEVATIONS -
OVERALL - PHASE 1
AD510BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400SCALE: 1/16" = 1'-0"AD215 AD510
4 SOUTH ELEVATION - PHASE 1 - DEMOLITION
SCALE: 1/16" = 1'-0"AD215 AD510
1 WEST ELEVATION - PHASE 1 - DEMOLITION
SCALE: 1/16" = 1'-0"AD215 AD510
2 NORTH ELEVATION - PHASE 1 - DEMOLITION
SCALE: 1/16" = 1'-0"AD215 AD510
3 EAST ELEVATION - PHASE 1 - DEMOLITION
0' 4' 8' 16' 32'
1/16" = 1'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
12416 15 14 3513 12 11 10 9 8 7 66.114.7
±1 6'-
3"
W04 M02W01 M03 M03D03D01 W01 D01
R08M01 M01 M01
TYP.
W06
±30'-0" ±157'-8" 2'-4" ±8'-11"
R11W01
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
ABCDK J H G F E A.5B.5
±49'-5 1/2" 1'-10 1/2"
W04 W02 Q03
NOT SHOWN
D04 W01 M02
M01
TYP.
M01
TYP.
R08
E01
TYP.
AA
D01
±1 6'-
3"
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
1 2 4 1615143 5 131211109876 6.1 14.7
8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 2'-0" 24'-0" ±24'-11"
R08 M01M01
D03 W00 D04
E01
TYP. 4'-
8" 6'-
0"
8'-0" 4'-0" 8'-0" 4'-0" 8'-0" 2'-0" 24'-0" 26'-0"
W00 D01
R11
W07
W07 D04
W08W07
W07
FIRST FLOOR -
FINISH FLOOR
100'-0"
FIRST FLOOR -
FINISH FLOOR
100'-0"
A B C D KJHGFEA.5 B.5AA
DEMO GENERAL NOTES:
1. REFER SHEET AD100 FOR DEMOLITION GENERAL NOTES, DEMOLITION KEYED NOTES & EXISTING
EQUIPMENT SCHEDULE.
2. DEMOLITION SCOPE INCLUDES WORK SHOWN BY ALL DISCIPLINES. REFER TO CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS, NOTES AND SPECIFICATIONS FOR THE FULL SCOPE OF WORK RELATED TO THOSE DISCIPLINES WHICH MAY NOT BE SHOWN, IN WHOLE OR IN
PART, ON ARCHITECTURAL PLANS.
3. REGULATED ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINTS ARE KNOWN TO
EXIST IN THIS FACILITY. REFER TO PROJECT GENERAL NOTES ON SHEET G-002.
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
As indicated12/20/2019 3:24:53 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:2 4:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
DEMOLITION ELEVATIONS -
OVERALL - PHASE 2
AD520BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SCALE: 1/16" = 1'-0"A-101 AD520
1 WEST ELEVATION - PHASE 2 - DEMOLITION
SCALE: 1/16" = 1'-0"AD220 AD520
2 NORTH ELEVATION - PHASE 2 - DEMOLITION
SCALE: 1/16" = 1'-0"AD220 AD520
3 EAST ELEVATION - PHASE 2 - DEMOLITION
SCALE: 1/16" = 1'-0"A-104 AD520
4 SOUTH ELEVATION - PHASE 2 - DEMOLITION
0' 4' 8' 16' 32'
1/16" = 1'-0"
A-
1 0
A- 1 0
A-
1 0
A- 1 0
A-
1 0
A- 1 0
A-
1 0
A- 1 0
BA
SE
B
ID
: P
ER
IM
ET
ER
DR
N
AT
N
OR
TH
AN
TE
R
AN
D
DE
CO
RA
TI
VE
S
TO
NE
BE
DS
. T
IE
T
O
ST
OR
M
SE
W
ER
, R
E:
C
IV
IL.
OP
TI
ON
N
O.
RE
: C
IV
IL
A-
1 0
A- 1 0
A-
1 0
A- 1 0
1BA
SE
BI
D
OP
TI
ON
NO
. 1
BA
OP
. 2
OP
. 2
A-
1 0
A- 1 0
4BA
TW
O
PL
AN
S
AR
E
PR
OV
ID
ED
O
F
TH
E
SA
ME
A
RE
A, SH
OW
IN
G
DI
FF
ER
EN
T
CO
NF
IG
UR
AT
IO
NS
TW
O
PL
AN
S
AR
E
PR
OV
ID
ED
O
F
TH
E
SA
ME
A
RE
A, SH
OW
IN
G
DI
FF
ER
EN
T
CO
NF
IG
UR
AT
IO
NS
OP
TI
ON
N
O.
2:
PE
RI
ME
TE
R
DR
AI
N
AT
W
ES
T
PL
AN
TE
RS
ND
DE
CO
RA
TI
VE
S
TO
NE
BE
DS
. T
IE
T O
BA
SE
B
ID
DR
N
AN
D
ST
OR
M
SE
W
ER
, R E:
C
IV
IL.
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
DATE:
APPROVED BY:
ISSUED BY
OFFICE OF:
FACILITY
MANAGEMENT
AMP-400
PROJECT MANAGER:
WORK REQUEST NO:
BASE MAINTENANCE BUILDING
12/20/19
1" = 30'-0"12/20/2019 3:35:16 PM
BI
M
FA
A M
M
AC
B as e M ai nt en an ce B ui ld in g/
M M
AC
-B
M B
R en ov at io n
Ty pe
B -A rc h.
rv t
/2
0/
:3 5:
P
M
RENOVATION OF BMB-15
(BASE MAINTENANCE BUILDING)
6125 SW 68TH ST, OKLAHOMA CITY, OK
ARCHITECTURAL SITE PLAN
A-100BW
BW
2014-004363
-1
5-
G
0E
\\l w pb -fi le sr vr \F ed er al
FA
A\
FA
A
ID
IQ
\T O
B M
B R en ov at io n Ty pe B
\0
D w gs \0
Ar ch M
M
AC
-B M
B R en ov at io n Ty pe B
7.
rv t
LW
PB
0 1
6.
0 2
12/20/19
MONTE THURMAN,
AMP-400
2014-004363
MONTE THURMAN,
AMP-400
SC
AL
E:
0 ' -0
A-
1 0
A- 1 0
AR
C
H
IT
EC
TU
R
AL
S
IT
E
PL
AN
N
O R
TH
14.7
A-101A-101
A-101A-101
1'-0"
25'-0" 19'-11"11 '-6
5'-
2 1 /2"
1"
BASE BID: CONCRETE
MOW STRIP
BASE BID: PLANTER/RAISED BED
BASE BID: SIDEWALK, RE: CIVIL
BASE BID: SUBDRAINAGE
PIPING THIS PLANTER &
DECORATIVE STONE BED
TO STORM SEWER
BASE BID: DECORATIVE
STONE BED
12 12
11 11
10 10
9 9
AA
2'- 4"
'-0
2'-
4" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0" 4'-
0"
'-6
4'- 1"
4'- 0 3
/4" 4'-
0 1 /2"
4'- 0 3
/8" 4'-
0 3 /16
4'-
0 1 /8"
4'- 0 1
/16
4' - 0"
4' -0" 4'-0 1/16"
4'-0 1/8" 4'-0 3/16"
4'-0 3/8" 4'-0 1/2"
4'-0 3/4" 4'-1"
DI
ME
NS
IO
NS
S
HO
W
N
TH
IS
S
ID
E
OF
F
RA
ME
A
RE
AP
PR
OX
IM
AT
E, A
ND
D
IM
EN
SI
ON
ED
T O
IM
AG
IN
AR
Y
PO
IN
TS
O F
IN
TE
RS
EC
TI
ON
A T
CE
NT
ER
LIN
E
OF
M
UL
LIO
N
AN
D
CE
NT
ER
LIN
E
OF
GL
AS
S
A124
R150'-0" @CENTERLINE OF GLASS
1'-9" 7'-9" ±3'-5 1/2"
1'-8
6'-3
6'-0
10' -1"
SIDEWALK, RE: CIVIL
CONCRETE FOUNDATION,
RE: STRUCT.
STEEL COLUMN, RE:
STRUCT.
PAINT EXPOSED STEEL
XPT-3
SIDEWALK, RE: CIVIL
6" PERFORATED PVC PIPE
GEOTEXTILE SUBSURFACE
DRAINAGE FILTRATION
GRAVEL DRAINAGE
LAYERS
DECORATIVE
LANDSCAPING STONE
CRUSHED STONE
SURFACING
SIDEWALK, RE: CIVIL
FIRST FLOOR -
FINISH FLOOR
100'-0"
3'-0
1'-8
8" 3'-10 1/2" 8"
6" PERFORATED PVC PIPE
GEOTEXTILE SUBSURFACE
DRAINAGE FILTRATION
GRAVEL DRAINAGE
LAYERS
DECORATIVE
LANDSCAPING STONE
CRUSHED STONE
SURFACING
(2) - #5 CONT
(2) - #5 CONT
(18) - #4 @ 1'-6"
(4) - #4 @ 1'-0"
5'-2 1/2"
3/4" CHAMFER ALL EXPOSED
CORNERS
FIRST FLOOR -
FINISH FLOOR
100'-0"
AA
TEXTURED FINISH ON CMU TO
MATCH EIFS-1
(BASE COAT, REINFORCING MESH,
PRIMER AND FINISH)
TEXTURED FINISH ON CMU TO
MATCH EIFS-1
(BASE COAT, REINFORCING MESH,
PRIMER AND FINISH)
8" X 8" X 16" CMU - 2 CORE
SINGLE 8" X 8" BOND BEAM
PREFINISHED METAL PARAPET
CAP, XMT-1
8'- 0"
F.
V.
1'- 4"
REVIEWED BY
DRAWN BY:
DESIGNED BY:
PLOT DATE: PLOT SCALE:
DRAWING NO. AMP-400-E-
OF
LO
C
AL
F
T D
AT
E:
LW
PB
J O
B N
O
C
EN
TR
AL
F
A
B
C
D
E
F
G
A
B
C
D
E
F
G
TE
M
PL
AT
E:
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR 15 and 1520.
DEPARTMENT OF TRANSPORTATION
FEDERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .