Attachment 7 - Vol 3 Drawings.pdf

PDF 12 MB Posted

Attached to
Y1DZ--502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
Solicitation number
36C77626R0104
Issued by

About this file

This document is Attachment 7 - Volume 3 of the construction drawings for the Electronic Health Record Modernization (EHRM) project at the Alexandria VA Health Care System in Pineville, Louisiana (VA Project #502-21-222). The drawings package consists of 62 sheets detailing mechanical, plumbing, and fire suppression systems across multiple buildings on the facility campus. The project involves 100% construction documents dated March 24, 2026, prepared by Apogee Consulting Group, P.A., with full sprinkler system design throughout all affected areas.

The mechanical scope includes installation of ductless split-system air conditioning units in 25+ telecom/IT rooms across Buildings 1 through 7, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, and 171, with condensing units mounted on grade or rooftops and refrigerant piping routed between floors. Plumbing work encompasses rerouting of domestic cold water (DCW), domestic hot water (DHW), chilled water (CHW), and sanitary drainage systems around new telecom rooms, with condensate drain provisions and floor drains. Fire suppression requirements include upright sprinkler heads with wireguards connected to existing wet-pipe systems, with minimum 8-inch clearance above cable trays in telecom rooms. All work must coordinate with existing utilities, maintain negative air pressure in construction zones per infection control measures, and comply with NFPA-13 standards, VA requirements, and local codes. Demolition includes removal of existing FCU/VAV boxes, hydronic piping, diffusers, ductwork, steam radiators, and associated controls, with all removed equipment becoming contractor property for disposal per VAPHS regulations.

View the file

Other files

File Type Posted
ME_SUBMITTAL_PKA-AK36NL_PUZ-AK36NL_6PSmo.pdf PDF
RFI Update 10-7-26.pdf PDF
Amendment 0007.pdf PDF
ME_SUBMITTAL_PKA-AK24NL_PUZ-AH24NL_XbtyE.pdf PDF
RFI Responses.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Site Visit Sign In Sheet 8-20-26.pdf PDF
Site Visit Agenda.pdf PDF
Amendment 0003.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0002.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0001.pdf PDF
Attachment 7 - Key Subcontractor Information.docx DOCX document
Attachment 10 - Wage Determination.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - Site Visit Details.docx DOCX document
Attachment 8 - Key Personnel.docx DOCX document
Attachment 5 - Vol 4 Drawings.pdf PDF
Attachment 9 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 4 - Vol 3 Drawings.pdf PDF
Attachment 3 - Volume 2 Drawings.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Attachment 6 - Vol 2 Drawings Part 4.pdf PDF
Attachment 5 - Vol 2 Drawings Part 3.pdf PDF
Attachment 8 - Vol 4 Drawings.pdf PDF
Attachment 3 - Vol 2 Drawings.pdf PDF
Attachment 12 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 14 - Site Visit Details.docx DOCX document
Attachment 4 - Vol 2 Drawings Part 2.pdf PDF
36C77626R0104.pdf PDF
Attachment 10 - Key Subcontractor Information.docx DOCX document
Attachment 11 - Key Personnel.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Vol 1 Drawings.pdf PDF
Attachment 1 - Specifications.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:3

:1

A

M C

U s e rs \l s ta rn e s \D o c u m e n ts

\M S

-3

E

H R

M ls ta rn e s C

B U

M B

.r v t

G-001.3

COVER VOLUME 3

1 1MEL

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

VA PROJECT #: 502-21-222

WVS

VOLUME 3

SHEET LIST

SHEET NUMBER SHEET NAME DWG OF DWG

GENERAL

G-001.3 COVER VOLUME 3 1 1

MECHANICAL

MP001 MECHANICAL GENERAL INFORMATION 1 62

MP002 PLUMBING GENERAL INFORMATION 2 62

MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 62

001.M-101 BUILDING 1, FIRST FLOOR, OVERALL MECHANICAL PLAN 4 62

001.MP401 BUILDING 1, FIRST FLOOR, TELECOM ROOM 103 PLANS 5 62

001.MP402 BUILDING 1, SECOND FLOOR, TELECOM ROOM 202 PLANS 6 62

002.M-101 BUILDING 2, FOURTH FLOOR, OVERALL MECHANICAL PLAN 7 62

002.MP401 BUILDING 2, FIRST FLOOR, TELECOM ROOM 133 PLANS 8 62

002.MP402 BUILDING 2, SECOND FLOOR, TELECOM ROOM 256 PLANS 9 62

002.MP403 BUILDING 2, THIRD FLOOR, TELECOM ROOM 359 PLANS 10 62

002.MP404 BUILDING 2, FOURTH FLOOR, TELECOM ROOM 424 PLANS 11 62

003.MP401 BUILDING 3, FIRST FLOOR, TELECOM ROOM 105 PLANS 12 62

003.MP402 BUILDING 3, SECOND FLOOR, TELECOM ROOM 205 PLANS 13 62

003.MP403 BUILDING 3, THIRD FLOOR, TELECOM ROOM 305 PLANS 14 62

004.M-101 BUILDING 4, FIRST FLOOR, OVERALL MECHANICAL PLAN 15 62

004.MP401 BUILDING 4, FIRST FLOOR, TELECOM ROOM 102E PLANS 16 62

005.MP401 BUILDING 5, BASEMENT FLOOR, TELECOM ROOM G06A PLANS 17 62

005.MP402 BUILDING 5, FIRST FLOOR, TELECOM ROOM 110A PLANS 18 62

005.MP403 BUILDING 5, SECOND FLOOR, TELECOM ROOM 212C PLANS 19 62

006.MP401 BUILDING 6, BASEMENT, TELECOM ROOM 008 PLANS 20 62

006.MP402 BUILDING 6, FIRST FLOOR, TELECOM ROOM 101 PLANS 21 62

006.MP403 BUILDING 6, SECOND FLOOR, TELECOM ROOM 201 PLANS 22 62

006.MP404 BUILDING 6, THIRD FLOOR, TELECOM ROOM 310 PLANS 23 62

007.M-101 BASEMENT FLOOR OVERALL MECHANICAL PLAN 24 62

007.MP401 BUILDING 07, BASEMENT FLOOR, TELECOM ROOM 17 PLANS 25 62

007.MP402 BUILDING 07, BASEMENT FLOOR, TELE./COMPUTER RM 42, COMPUTER RM 45

MECHANICAL PLANS

007.MP403 BUILDING 07, FIRST FLOOR, TELECOM ROOM 184A PLANS 27 62

007.MP404 BUILDING 07, FIRST FLOOR, TELECOM ROOM 1A-117 PLANS 28 62

007.MP405 BUILDING 07, FIRST FLOOR, TELECOM ROOM D-33 PLANS 29 62

007.MP406 BUILDING 07, SECOND FLOOR, TELECOM ROOM 267A PLANS 30 62

007.MP407 BUILDING 07, SECOND FLOOR, TELECOM ROOM 2M4 PLANS 31 62

007.MP408 BUILDING 07, THIRD FLOOR, TELECOM ROOM 373D PLANS 32 62

007.MP409 BUILDING 07, THIRD FLOOR, TELECOM ROOM 3M4 PLANS 33 62

007.MP410 BUILDING 07, FOURTH FLOOR, TELECOM ROOM 471A PLANS 34 62

007.MP411 BUILDING 07, FOURTH FLOOR, TELECOM ROOM 402 PLANS 35 62

008.MP401 BUILDING 8, FIRST FLOOR, TELECOM ROOM 105C PLANS 36 62

009.M-101 BUILDING 9, FIRST FLOOR, OVERALL MECHANICAL PLAN 37 62

009.MP401 BUILDING 9, FIRST FLOOR, TELECOM ROOM 135 PLANS 38 62

009.MP402 BUILDING 9, SECOND FLOOR, TELECOM ROOM 218 PLANS 39 62

009.MP403 BUILDING 9, THIRD FLOOR, TELECOM ROOM 315 PLANS 40 62

013.MP401 BUILDING 13, FIRST FLOOR, TELECOM ROOM 6 PLANS 41 62

014.M-101 BUILDING 14, FIRST FLOOR, OVERALL MECHANICAL PLAN 42 62

014.MP401 BUILDING 14, FIRST FLOOR, TELECOM ROOM 1A107 PLANS 43 62

015.MP401 BUILDING 15, FIRST FLOOR, TELECOM ROOM 7F PLANS 44 62

016.MP401 BUILDING 16, FIRST FLOOR, TELECOM ROOM 110B PLANS 45 62

045.M-101 BUILDING 45, FIRST FLOOR, OVERALL MECHANICAL PLAN 46 62

045.MP401 BUILDING 45, FIRST FLOOR, TELECOM ROOM 170 PLANS 47 62

045.MP402 BUILDING 45, FIRST FLOOR, TELECOM ROOM 173 PLANS 48 62

045.MP403 BUILDING 45, SECOND FLOOR, TELECOM ROOM 268 PLANS 49 62

045.MP404 BUILDING 45, SECOND FLOOR, TELECOM ROOM 272 PLANS 50 62

046.M-101 BUILDING 46, FIRST FLOOR, OVERALL MECHANICAL PLAN 51 62

046.MP401 BUILDING 46, THIRD FLOOR, TELECOM ROOM 302 PLANS 52 62

049.M-101 BUILDING 49, FIRST FLOOR, OVERALL MECHANICAL PLAN 53 62

049.MP401 BUILDING 49, FIRST FLOOR, TELECOM ROOM 166 PLANS 54 62

136.MP401 BUILDING 136, FIRST FLOOR, TELECOM ROOM 3 PLANS 55 62

142.MP401 BUILDING 142, FIRST FLOOR, TELECOM ROOM 7B PLANS 56 62

147.MP401 BUILDING 147, FIRST FLOOR, TELECOM ROOM 102 PLANS 57 62

171.MP401 BUILDING 171,FIRST FLOOR, TELECOM ROOM 108 PLANS 58 62

MP501 MECHANICAL AND PLUMBING DETAILS 59 62

MP502 MECHANICAL AND PLUMBING DETAILS 60 62

MP503 MECHANICAL AND PLUMBING DETAILS 61 62

MP601 MECHANICAL SCHEDULES 62 62

VOLUME 3 OF 4

W

AL

TE

R DAVID VAN SCOTER

REG. NO. 9953

Docusign Envelope ID: 7FA18971-B6F6-44A9-896C-7B85FF50EEA5

3/23/2026

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

D DAMPER - AUTOMATIC

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EJ EXPANSION JOINT

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FD FLOOR DRAIN

FD FIRE DAMPER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HHW HEATING HOT WATER

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HSTAT HUMIDISTAT

HW HOT WATER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

P PUMP

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UL UNDERWRITERS LABORATORY

V VALVE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

W WATTS

Wb WET-BULB (TEMPERATURE)

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

MECHANICAL ABBREVIATIONS

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-15

CR-15

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

D CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS) S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

MECHANICAL LEGEND

MOTORIZED DAMPER

WATER SENSOR

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.

6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

15. NOTIFY COR/VA REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR/VA.

22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE

NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

24. INSTALL PIPING FREE OF SAGS AND BENDS.

25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR/VA FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS

GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

MECHANICAL GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY

GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO

COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER TRADES.

MECHANICAL DEMOLITION GENERAL NOTES

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

DIFFUSER TAG

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

EQUIPMENT TAG

ANNOTATION SYMBOLS

##-VAV-#

SD-## ###

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A. 62

/1

/2

:4

:1

P

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P F

-3

V

A A le x a n d ri a E

H R

M

G e n e ra l_ a v a s a

N N

C C

.r v t

MP001

MECHANICAL GENERAL INFORMATION

1AV

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

VARIOUS

SWR

Docusign Envelope ID: DA068B76-2C54-400D-BC00-221FCC893EBE

3/24/2026

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING

WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT

NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK

AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.

SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR/VA 1 WEEK IN ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

PLUMBING GENERAL NOTES

DHW

PIPING SYSTEM

ST STORM

OFD OVERFLOW STORM DRAIN

SAN SANITARY WASTE

CD CONDENSATE DRAIN

MA MEDICAL AIR

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

DCW DOMESTIC COLD WATER

DOMESTIC HOT WATER

DHWR DOMESTIC HW RECIRCULATION

ST

OFD

SAN

CD

MA

WAGD

VAC

V

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

CHECK VALVE

GATE VALVE

GLOBE VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

PLUG VALVE

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

AUTOMATIC AIR VENT

PRESSURE GAUGE

THERMOMETER

OR

CO

PIPE SLOPE ARROW

AV

CIRCUIT SETTER

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HP HORSEPOWER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LAV LAVATORY

LBS/HR POUNDS PER HOUR

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MER MECHANICAL EQUIPMENT ROOM

MSB MOP SINK BASIN

MV MEDICAL VACUUM

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PPM PARTS PER MILLION

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SPR SPRINKLER LINE

SQFT SQUARE FOOT

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WHA WATER HAMMER ARRESTOR

WPD WATER PRESSURE DROP

WS WASTE STACK

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BHP BREAK HORSEPOWER

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CS CLINICAL SINK

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DF DRINKING FOUNTAIN

DN DOWN

DOE DEPARTMENT OF ENERGY

DWG DRAWING

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONITORING AND CONTROL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

EWC ELECTRIC WATER COOLER

EWS EYEWASH STATION

EX EXISTING

PLUMBING SYMBOLS PLUMBING SYMBOLS

ANNOTATION SYMBOLS

PLUMBING SYMBOLS & ABBREVIATIONS

ANNOTATION ABBREVIATIONS

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# 62

/1

/2

:4

:2

P

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P F

-3

V

A A le x a n d ri a E

H R

M

G e n e ra l_ a v a s a

N N

C C

.r v t

MP002

PLUMBING GENERAL INFORMATION

2AV

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

VARIOUS

SWR

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF

WORK.

2. COORDINATE WITH COR/VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE

THE COR/VA THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND

DISPOSED OF.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1. USE NFPA-13 (2019), CHAPTER “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW.

DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION

OF AUTOMATIC SPRINKLER SYSTEM.

2. INSTALLATION SHALL COMPLY WITH VA REQUIREMENTS.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.

COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.

LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE

HAZARD CLASSIFICATION.

4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA

STANDARDS.

6. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.

7. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS

AT PRIMARY BUILDING STRUCTURAL MEMBERS.

8. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.

9. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.

10. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS

SPECIFIED AND INDICATED ON THE DRAWINGS.

11. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.

12. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL

PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

13. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.

14. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.

15. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.

LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

FIRE SUPPRESSION GENERAL NOTES

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

WET FIRE SUPPRESSION LINEFS

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

CLEAN AGENT FIRE SUPPRESSION LINEFP-D

POINT OF NEW CONNECTION

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS

CEILING MOUNTED SMOKE DETECTOR CLEAN AGENT DISCHARGE NOZZLESD

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST

CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR/VA'S

ACCEPTANCE.

INFECTION CONTROL MEASURES

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.

2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.

4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF

FIRE PROTECTION SERVICE

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.

IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION

WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR

INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO

BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL

VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY

PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS

OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.

REFER NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

FLUSHING CONNECTION

FEED OR CROSS MAIN.

TYPICAL TEE WITH

CROSS MAIN PITCH

TOWARDS FEED MAIN.

NOTE: INSTALL FLUSHING

CONNECTION AT END OF

CROSS MAINS.

2" NIPPLE 4" LONG

WITH CAP.

MECHANICAL TEE

NEW PIPING

MECHANICAL TEE

SCREWED END

STEEL BEAM

RETAINING STRAP

C-CLAMP

THREADED HANGER ROD

ADJUSTABLE RING HANGER

NOTE:

HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.

EXPANSION ANCHOR HILT QUIK

BOLT TZ OR APPROVED EQUAL.

EXPANSION ANCHOR SHALL BE

QUALIFIED FOR USE IN CRACKED

CONCRETE PER ACI 355.2

EXISTING CONCRETE SLAB

AUTO. SPRINKLER PIPE

SET SCREW

SURGE RESTRAINER

1" X ARMOVER

1" 90 EL

1" X DROP

DROP NIPPLE

1" x 1/2" R.C. REDUCER

NOTE:

1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.

2. ALL EXPOSED PIPING SHALL BE PAINTED RED.

SUSPENDED CEILING

HANGERS SHALL

BE PROVIDED AS

REQUIRED BY

NFPA 13 TYPICAL

1" x 2" NIPPLE

BRANCH LINE

PENDENT SPRINKLER HEAD

STAINLESS STEEL FLEXIBLE HOSE MAY

BE USED IF IT HAS A MINIMUM 1" PIPE

DIAMETER AND MAXIMUM 6' LENGTH.

INSTALL INSULATION AFTER

CAULKING SLEEVE, SEAL

ANNULAR SPACE.

FIRE RATED WALL AND OR SLAB.

STEEL PIPE SLEEVE TERMINATE

SLEEVE FLUSH WITH FINISHED

SURFACE.

UL-LISTED FIRESTOPPING

FINISHED ESCUTCHEON PLATE

FLUSH AGAINST WALL AND OF

SIZE TO COMPLETELY COVER

OPENING.

APPROVED TYPE FIRE SAFE &

SMOKE TIGHT CAULKING SEALER

BETWEEN BARE PIPE AND SLEEVE.

NOTE:

MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS

SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.

NOTES:

1. ALL EXPOSED PIPING SHALL BE PAINTED RED.

2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS UNLESS OTHERWISE NOTED.

THREADED

HANGER ROD

SURGE

RESTRAINER

ADJUSTABLE

RING HANGER

BRANCHLINE

AUTO. SPRINKLER FEED

UPRIGHT AUTOMATIC

SPRINKLER, FM APPROVED,

QUICK RESPONSE

REDUCER

RISER NIPPLE

REDUCING TEE

LISTED WIRE GUARD

(RED COLOR)

FIRE PROTECTION PIPING SHALL BE

COORDINATED WITH ALL OTHER TRADES

AND A MINIMUM OF 8" ABOVE CABLE

TRAY IN TELECOMMUNICATION ROOMS.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# 62

/1

/2

:4

:2

P

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P F

-3

V

A A le x a n d ri a E

H R

M

G e n e ra l_ a v a s a

N N

C C

.r v t

MP003

FIRE SUPPRESSION GENERAL

INFORMATION

3AV

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

VARIOUS

SWR

Scale: No Scale

MECHANICAL TEE AND FLUSHING CONNECTION DETAIL

Scale: No Scale

PIPE HANGER SUPPORT DETAIL

Scale: No Scale

SEMI-RECESSED PENDENT SPRINKLER DETAIL

Scale: No Scale

SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL

Scale: No Scale

UPRIGHT AUTOMATIC SPRINKLER WITH GUARD DETAIL

001.MP401

01-1-CU-1 01-1-CU-2

01-1-DAC-1

RL

RS

TR

PMS

PMS

HRM.

ADMIN

CLERK

CLERK

CLERK

109B

CLERK

109A

SECRETARY

AAC

HRM

MGR

WOMENS

TLT.

MENS

TLT.

LOBBY

STORAGE

NURSING

CONF.

ROOM

ADMIN.

ASSISTANT

ASSOCIATE

CHIEF

UNIT

SUPERVISOR

SECRETARY

PROGRAM

ASSISTANT

120B

TIME

KEEPER

119B

PMS

119A

PMS

NURSE

EXEC

120A

3/4" D

RS

RL

CONDENSING UNITS MOUNTED ON GRADE.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:5

:3

A

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P

-3

V

A A le x a n d ri a E

H R

M

B ld g a v a s a

N N

C C

M a r2

.r v t

001.M-101

BUILDING 1, FIRST FLOOR, OVERALL

MECHANICAL PLAN

4 62SMR

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

N O

R T H0 4 8 16

1 ROUTE REFRIGERANT PIPING TO ASSOCIATED

INDOOR SPLIT SYSTEM.

2 ROUTE CONDENSATE DRAIN PIPING TO

EXTERIOR WALL, DISCHARGE CONDENSATE ON

NEW SPLASH BLOCK.

Scale: 3/16" = 1'-0"

FIRST FLOOR, MECHANICAL OVERALL PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

T

6x6 1

PMS

1" 1"

TR

TH

01-1-DAC-1

RL

RS

3/4" D T

PMS

NO PLUMBING

DEMOLITION WORK

IN THIS AREA.

TR

NO PLUMBING WORK

IN THIS AREA.

PMS

NO FIRE

SUPPRESSION

DEMOLITION WORK IN

THIS AREA.

TR

NO FIRE SUPPRESSION

WORK IN THIS AREA

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:5

:3

A

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P

-3

V

A A le x a n d ri a E

H R

M

B ld g a v a s a

N N

C C

M a r2

.r v t

001.MP401

BUILDING 1, FIRST FLOOR, TELECOM

ROOM 103 PLANS

5 62SMR

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

1 DEMOLISH EXISTING MECHANICAL HYDRONIC

PIPING AS INDICATED AND CAP AT MAIN.

2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,

AND HANGERS. DEMOLISH ASSOCIATED

THERMOSTAT AND WIRING.

3 DEMOLISH DIFFUSER / GRILLE AND ASSOCIATED

DUCTWORK BACK TO LIMITS OF DEMOLITION

AND CAP.

4 DEMOLISH STEAM RADIATOR AND CAP STEAM

SUPPLY AND CONDENSATE PIPING AT FLOOR.

5 DEMOLISH EXISTING WINDOW AC UNIT.

1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'

10" AFF. REFRIGERANT PIPING TO BE ROUTED

TO OUTSIDE UNIT. REFER TO OVERALL PLANS.

2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT

FOR MONITORING AND TRACKING ROOM

TEMPERATURE AND HUMIDITY. SHALL

COMMUNICATE WITH ECC.

3 ROUTE CONDENSATE TO EXTERIOR WALL, SEE

001.M-101 FOR CONTINUATION.

4 PROVIDE WATER LEAK SENSOR ON FLOOR AND

CONNECT TO THE BAS AND ALARM IF WATER IS

SENSED.

5 PROVIDE MANUFACTURERS THERMOSTAT FOR

INDOOR SPLIT UNIT.

N O

R T H0 2 4 8

N O

R T H0 2 4 8

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

B. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING DUCTWORK,

PIPING OR EQUIPMENT THAT IS NOT INDICATED

FOR DEMOLITION OR IS DISCOVERED IN THE

DEMOLITION PROCESS.

C. ALL DEMOLISHED EQUIPMENT SHALL BECOME

THE PROPERTY OF THE CONTRACTOR AND

SHALL BE DISPOSED OF IN ACCORDANCE WITH

VAPHS REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

D. NO DEAD ENDS IN DOMESTIC WATER PIPING

SHALL REMAIN. THE MAXIMUM LENGTH OF

DEAD ENDS SHALL BE TWO PIPE DIAMETERS

FROM THE BRANCH, RISER, OR MAIN.

E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE AS

THE NECK/DUCT CONNECTION SIZE SPECIFIED

IN THE AIR DEVICE SCHEDULE.

F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

G. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

H. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS

POSSIBLE.

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 103 MECHANICAL

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 103 MECHANICAL

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

REFRIGERANT LIQUID / SUCTION

PIPE AND CONDENSATE PIPE FROM

ABOVE SEE 001.MP402

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 103 PLUMBING

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 103 PLUMBING PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM ROOM 103

FIRE SUPPRESSION

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 103 FIRE

SUPPRESSION PLAN

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

T

ROOM

1" 1"

2" CHR

2" CHS

TR

T

H

01-2-DAC-1

3/4" D

RL

RS

T

ROOM

NO PLUMBING

DEMOLITION WORK

IN THIS AREA.

TR

NO NEW PLUMBING

WORK IN THIS AREA.

ROOM

NO FIRE SUPPRESSION

DEMOLITION WORK IN

THIS AREA.

TR

NO NEW FIRE

SUPPRESSION

WORK IN THIS AREA.

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:5

:3

A

M C

U s e rs

\a v a s a

\D o c u m e n ts \M

P

-3

V

A A le x a n d ri a E

H R

M

B ld g a v a s a

N N

C C

M a r2

.r v t

001.MP402

BUILDING 1, SECOND FLOOR,

TELECOM ROOM 202 PLANS

6 62SMR

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

1 DEMOLISH EXISTING MECHANICAL HYDRONIC

PIPING AS INDICATED AND CAP.

2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,

AND HANGERS. DEMOLISH ASSOCIATED

THERMOSTAT AND WIRING.

3 DEMOLISH DIFFUSER / GRILLE AND ASSOCIATED

DUCTWORK BACK TO LIMITS OF DEMOLITION

AND CAP.

4 DEMOLISH STEAM RADIATOR AND CAP STEAM

SUPPLY AND CONDENSATE PIPING AT FLOOR.

N O

R T H0 2 4 8

N O

R T H0 2 4 8

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

B. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING DUCTWORK,

PIPING OR EQUIPMENT THAT IS NOT INDICATED

FOR DEMOLITION OR IS DISCOVERED IN THE

DEMOLITION PROCESS.

C. ALL DEMOLISHED EQUIPMENT SHALL BECOME

THE PROPERTY OF THE CONTRACTOR AND

SHALL BE DISPOSED OF IN ACCORDANCE WITH

VAPHS REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

D. NO DEAD ENDS IN DOMESTIC WATER PIPING

SHALL REMAIN. THE MAXIMUM LENGTH OF

DEAD ENDS SHALL BE TWO PIPE DIAMETERS

FROM THE BRANCH, RISER, OR MAIN.

E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE AS

THE NECK/DUCT CONNECTION SIZE SPECIFIED

IN THE AIR DEVICE SCHEDULE.

F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

G. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

H. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS

POSSIBLE.

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM

ROOM 202 MECHANICAL

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM

ROOM 202 MECHANICAL

PLAN

1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'

10" AFF. REFRIGERANT PIPING TO BE ROUTED

TO OUTSIDE UNIT. REFER TO OVERALL PLANS.

2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT

FOR MONITORING AND TRACKING ROOM

TEMPERATURE AND HUMIDITY. SHALL

COMMUNICATE WITH ECC.

3 REFRIGERANT PIPING AND CONDENSATE DRAIN

PIPING ROUTED DOWN TO FIRST FLOOR. SEE

001.MP401 FOR CONTINUATION.

4 PROVIDE WATER LEAK SENSOR ON FLOOR AND

CONNECT TO THE BAS AND ALARM IF WATER IS

SENSED.

5 PROVIDE MANUFACTURERS THERMOSTAT FOR

INDOOR SPLIT UNIT.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM

ROOM 202 PLUMBING

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM

ROOM 202 PLUMBING PLAN

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM ROOM

202 FIRE SUPPRESSION

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

SECOND FLOOR TELECOM

ROOM 202 FIRE

SUPPRESSION PLAN

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

RMS STORAGE

RMS

408A

RMS

407B

RMS

STAIR

RECREATIONAL

THERAPY

LIN.

405A

B / MGT.

STORAGE

RMS STORAGE

TOILET

410A

JANITOR

ELEC

B / MGT.

STORAGE

PHARMACY

PHARMACY

PHARM.

401A B / MGT.

STORAGE

B / MGT.

A&MMS

STORAGE

IRM STORAGE

IRM STORAGE

B / MGT.

STAIR

PHARM.

401B

418A

RMS STORAGE

TR

424 CANTEEN

STAIRS

02-1-CU-2

02-1-CU-3

02-1-CU-1

02-1-CU-4

PROVIDE SPLIT SYSTEM CONDENSING UNITS

ON ROOF. UNITS SHALL BE WALL MOUNTED.

ROUTE 4 SETS OF MINI-SPLIT

REFRIGERANT PIPING TO CONDENSING

UNITS ON BUILDING 2 4TH FLOOR ROOF.

002.MP404

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:5

A

M C

U s e rs \a v a s a

\D o c u m e n ts

\M

-3

V A

A le x a n d ri a

E H

R M

B ld g a v a s a

N N

C C

.r v t

002.M-101

BUILDING 2, FOURTH FLOOR, OVERALL

MECHANICAL PLAN

7 62SMR

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

N O

R T H0 4 8 16

Scale: 1/8" = 1'-0"

FOURTH FLOOR, OVERALL MECHANICAL PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

EDUC

1" CHS

1" CHR

1/2" HWR

1/2" HWS

EDUC

TR

TR

TH

1" D

1" CHS

1" CHR

3/4" HWR

3/4" HWS

T7

02-1-DAC-1

RL

RS

1" D

TR

NO NEW PLUMBING

WORK IN THIS AREA.

EDUC

NO PLUMBING

DEMOLITION WORK IN

THIS AREA.

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:5

A

M C

U s e rs \a v a s a

\D o c u m e n ts

\M

-3

V A

A le x a n d ri a

E H

R M

B ld g a v a s a

N N

C C

.r v t

002.MP401

BUILDING 2, FIRST FLOOR, TELECOM

ROOM 133 PLANS

8 62AV

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

1 REMOVE EXHAUST / RETURN GRILLE AND

ASSOCIATED DUCT BACK TO BRANCH TAKEOFF

AND CAP DUCT.

2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,

AND HANGERS.

3 DEMOLISH EXISTING MECHANICAL HYDRONIC

PIPING AS INDICATED AND CAP. PREPARE TO

REROUTE IN NEW WORK.

4 DEMOLISH EXISTING SPRINKLER HEAD.

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 MECHANICAL

DEMOLITION PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 FIRE

SUPPRESSION DEMOLITION

PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 FIRE

SUPPRESSION PLAN

1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'

10" AFF. REFRIGERANT PIPING TO BE ROUTED

TO OUTSIDE UNIT. REFER TO OVERALL PLANS.

2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT

FOR MONITORING AND TRACKING ROOM

TEMPERATURE AND HUMIDITY. SHALL

COMMUNICATE WITH ECC.

3 CONNECT 3/4" CONDENSATE DRAIN TO RISER

FROM ABOVE.

4 PROVIDE WATER LEAK SENSOR ON FLOOR AND

CONNECT TO THE BAS AND ALARM IF WATER IS

SENSED.

5 ROUTE CONDENSATE PIPE FROM ABOVE TO

CONDENSATE PIPE SERVING EXISTING FCUS.

6 REROUTE EXISTING HYDRONIC PIPING AROUND

NEW TR ROOM, CONNECT TO EXISTING FAN

COIL UNIT IN ROOM 134.

7 PROVIDE MANUFACTURERS THERMOSTAT FOR

INDOOR SPLIT UNIT.

8 PROVIDE UPRIGHT SPRINKLER HEADS WITH

WIREGUARD AND CONNECT TO THE EXISTING

FIRE PROTECTION PIPING.

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

N O

R T H0 2 4 8

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

B. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING DUCTWORK,

PIPING OR EQUIPMENT THAT IS NOT INDICATED

FOR DEMOLITION OR IS DISCOVERED IN THE

DEMOLITION PROCESS.

C. ALL DEMOLISHED EQUIPMENT SHALL BECOME

THE PROPERTY OF THE CONTRACTOR AND

SHALL BE DISPOSED OF IN ACCORDANCE WITH

VAPHS REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

D. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM

LENGTH OF DEAD ENDS SHALL BE TWO PIPE

DIAMETERS FROM THE BRANCH, RISER, OR

MAIN.

E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS

AND GRILLE RUN-OUTS ARE THE SAME SIZE AS

THE NECK/DUCT CONNECTION SIZE SPECIFIED

IN THE AIR DEVICE SCHEDULE.

F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL

INCLUDE A BALANCING DAMPER.

G. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

H. PROVIDE ISOLATION BALL VALVES FOR EACH

PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS

POSSIBLE.

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 MECHANICAL

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 PLUMBING PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR TELECOM

ROOM 133 PLUMBING

DEMOLITION PLAN

N O

R T H0 2 4 8

N O

R T H0 2 4 8

TR

T H

RL

RS

5T

02-2-DAC-1

TWO SETS OF

REFRIGERANT SUCTION /

LIQUID TO THIRD FLOOR.

ONE SET OF REFRIGERANT

SUCTION / LIQUID UP FROM

FIRST FLOOR.

3/4" D

1" D

NURSE

OFFICE

NURSE

OFFICE

TR

NURSE

OFFICE

TR

NO NEW PLUMBING

WORK IN THIS AREA.

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:0

:5

A

M C

U s e rs \a v a s a

\D o c u m e n ts

\M

-3

V A

A le x a n d ri a

E H

R M

B ld g a v a s a

N N

C C

.r v t

002.MP402

BUILDING 2, SECOND FLOOR,

TELECOM ROOM 256 PLANS

9 62AV

ELECTRONIC HEALTH

RECORD MODERNIZATION

(EHRM)

ALEXANDRIA VA HEALTH CARE SYSTEM

2495 SHREVEPORT HWY, 71N

PINEVILLE, LA 71360

MARCH 24, 2026

100% CONSTRUCTION DOCUMENTS

502-21-22220-398

SWR

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

B. CONTRACTOR TO FIELD VERIFY ALL

CONDITIONS. PRESERVE EXISTING DUCTWORK,

PIPING OR EQUIPMENT THAT IS NOT INDICATED

FOR DEMOLITION OR IS DISCOVERED IN THE

DEMOLITION PROCESS.

C. ALL DEMOLISHED EQUIPMENT SHALL BECOME

THE PROPERTY OF THE CONTRACTOR AND

SHALL BE DISPOSED OF IN ACCORDANCE WITH

VAPHS REQUIREMENTS AND ENVIRONMENTAL

REGULATIONS.

D. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM

LENGTH OF DEAD ENDS SHALL BE TWO PIPE

DIAMETERS FROM THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .