Attachment 7 - Vol 3 Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77626R0104
About this file
This document is Attachment 7 - Volume 3 of the construction drawings for the Electronic Health Record Modernization (EHRM) project at the Alexandria VA Health Care System in Pineville, Louisiana (VA Project #502-21-222). The drawings package consists of 62 sheets detailing mechanical, plumbing, and fire suppression systems across multiple buildings on the facility campus. The project involves 100% construction documents dated March 24, 2026, prepared by Apogee Consulting Group, P.A., with full sprinkler system design throughout all affected areas.
The mechanical scope includes installation of ductless split-system air conditioning units in 25+ telecom/IT rooms across Buildings 1 through 7, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, and 171, with condensing units mounted on grade or rooftops and refrigerant piping routed between floors. Plumbing work encompasses rerouting of domestic cold water (DCW), domestic hot water (DHW), chilled water (CHW), and sanitary drainage systems around new telecom rooms, with condensate drain provisions and floor drains. Fire suppression requirements include upright sprinkler heads with wireguards connected to existing wet-pipe systems, with minimum 8-inch clearance above cable trays in telecom rooms. All work must coordinate with existing utilities, maintain negative air pressure in construction zones per infection control measures, and comply with NFPA-13 standards, VA requirements, and local codes. Demolition includes removal of existing FCU/VAV boxes, hydronic piping, diffusers, ductwork, steam radiators, and associated controls, with all removed equipment becoming contractor property for disposal per VAPHS regulations.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-001.3
COVER VOLUME 3
1 1MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
VA PROJECT #: 502-21-222
WVS
VOLUME 3
SHEET LIST
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
G-001.3 COVER VOLUME 3 1 1
MECHANICAL
MP001 MECHANICAL GENERAL INFORMATION 1 62
MP002 PLUMBING GENERAL INFORMATION 2 62
MP003 FIRE SUPPRESSION GENERAL INFORMATION 3 62
001.M-101 BUILDING 1, FIRST FLOOR, OVERALL MECHANICAL PLAN 4 62
001.MP401 BUILDING 1, FIRST FLOOR, TELECOM ROOM 103 PLANS 5 62
001.MP402 BUILDING 1, SECOND FLOOR, TELECOM ROOM 202 PLANS 6 62
002.M-101 BUILDING 2, FOURTH FLOOR, OVERALL MECHANICAL PLAN 7 62
002.MP401 BUILDING 2, FIRST FLOOR, TELECOM ROOM 133 PLANS 8 62
002.MP402 BUILDING 2, SECOND FLOOR, TELECOM ROOM 256 PLANS 9 62
002.MP403 BUILDING 2, THIRD FLOOR, TELECOM ROOM 359 PLANS 10 62
002.MP404 BUILDING 2, FOURTH FLOOR, TELECOM ROOM 424 PLANS 11 62
003.MP401 BUILDING 3, FIRST FLOOR, TELECOM ROOM 105 PLANS 12 62
003.MP402 BUILDING 3, SECOND FLOOR, TELECOM ROOM 205 PLANS 13 62
003.MP403 BUILDING 3, THIRD FLOOR, TELECOM ROOM 305 PLANS 14 62
004.M-101 BUILDING 4, FIRST FLOOR, OVERALL MECHANICAL PLAN 15 62
004.MP401 BUILDING 4, FIRST FLOOR, TELECOM ROOM 102E PLANS 16 62
005.MP401 BUILDING 5, BASEMENT FLOOR, TELECOM ROOM G06A PLANS 17 62
005.MP402 BUILDING 5, FIRST FLOOR, TELECOM ROOM 110A PLANS 18 62
005.MP403 BUILDING 5, SECOND FLOOR, TELECOM ROOM 212C PLANS 19 62
006.MP401 BUILDING 6, BASEMENT, TELECOM ROOM 008 PLANS 20 62
006.MP402 BUILDING 6, FIRST FLOOR, TELECOM ROOM 101 PLANS 21 62
006.MP403 BUILDING 6, SECOND FLOOR, TELECOM ROOM 201 PLANS 22 62
006.MP404 BUILDING 6, THIRD FLOOR, TELECOM ROOM 310 PLANS 23 62
007.M-101 BASEMENT FLOOR OVERALL MECHANICAL PLAN 24 62
007.MP401 BUILDING 07, BASEMENT FLOOR, TELECOM ROOM 17 PLANS 25 62
007.MP402 BUILDING 07, BASEMENT FLOOR, TELE./COMPUTER RM 42, COMPUTER RM 45
MECHANICAL PLANS
007.MP403 BUILDING 07, FIRST FLOOR, TELECOM ROOM 184A PLANS 27 62
007.MP404 BUILDING 07, FIRST FLOOR, TELECOM ROOM 1A-117 PLANS 28 62
007.MP405 BUILDING 07, FIRST FLOOR, TELECOM ROOM D-33 PLANS 29 62
007.MP406 BUILDING 07, SECOND FLOOR, TELECOM ROOM 267A PLANS 30 62
007.MP407 BUILDING 07, SECOND FLOOR, TELECOM ROOM 2M4 PLANS 31 62
007.MP408 BUILDING 07, THIRD FLOOR, TELECOM ROOM 373D PLANS 32 62
007.MP409 BUILDING 07, THIRD FLOOR, TELECOM ROOM 3M4 PLANS 33 62
007.MP410 BUILDING 07, FOURTH FLOOR, TELECOM ROOM 471A PLANS 34 62
007.MP411 BUILDING 07, FOURTH FLOOR, TELECOM ROOM 402 PLANS 35 62
008.MP401 BUILDING 8, FIRST FLOOR, TELECOM ROOM 105C PLANS 36 62
009.M-101 BUILDING 9, FIRST FLOOR, OVERALL MECHANICAL PLAN 37 62
009.MP401 BUILDING 9, FIRST FLOOR, TELECOM ROOM 135 PLANS 38 62
009.MP402 BUILDING 9, SECOND FLOOR, TELECOM ROOM 218 PLANS 39 62
009.MP403 BUILDING 9, THIRD FLOOR, TELECOM ROOM 315 PLANS 40 62
013.MP401 BUILDING 13, FIRST FLOOR, TELECOM ROOM 6 PLANS 41 62
014.M-101 BUILDING 14, FIRST FLOOR, OVERALL MECHANICAL PLAN 42 62
014.MP401 BUILDING 14, FIRST FLOOR, TELECOM ROOM 1A107 PLANS 43 62
015.MP401 BUILDING 15, FIRST FLOOR, TELECOM ROOM 7F PLANS 44 62
016.MP401 BUILDING 16, FIRST FLOOR, TELECOM ROOM 110B PLANS 45 62
045.M-101 BUILDING 45, FIRST FLOOR, OVERALL MECHANICAL PLAN 46 62
045.MP401 BUILDING 45, FIRST FLOOR, TELECOM ROOM 170 PLANS 47 62
045.MP402 BUILDING 45, FIRST FLOOR, TELECOM ROOM 173 PLANS 48 62
045.MP403 BUILDING 45, SECOND FLOOR, TELECOM ROOM 268 PLANS 49 62
045.MP404 BUILDING 45, SECOND FLOOR, TELECOM ROOM 272 PLANS 50 62
046.M-101 BUILDING 46, FIRST FLOOR, OVERALL MECHANICAL PLAN 51 62
046.MP401 BUILDING 46, THIRD FLOOR, TELECOM ROOM 302 PLANS 52 62
049.M-101 BUILDING 49, FIRST FLOOR, OVERALL MECHANICAL PLAN 53 62
049.MP401 BUILDING 49, FIRST FLOOR, TELECOM ROOM 166 PLANS 54 62
136.MP401 BUILDING 136, FIRST FLOOR, TELECOM ROOM 3 PLANS 55 62
142.MP401 BUILDING 142, FIRST FLOOR, TELECOM ROOM 7B PLANS 56 62
147.MP401 BUILDING 147, FIRST FLOOR, TELECOM ROOM 102 PLANS 57 62
171.MP401 BUILDING 171,FIRST FLOOR, TELECOM ROOM 108 PLANS 58 62
MP501 MECHANICAL AND PLUMBING DETAILS 59 62
MP502 MECHANICAL AND PLUMBING DETAILS 60 62
MP503 MECHANICAL AND PLUMBING DETAILS 61 62
MP601 MECHANICAL SCHEDULES 62 62
VOLUME 3 OF 4
W
AL
TE
R DAVID VAN SCOTER
REG. NO. 9953
Docusign Envelope ID: 7FA18971-B6F6-44A9-896C-7B85FF50EEA5
3/23/2026
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
D DAMPER - AUTOMATIC
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EJ EXPANSION JOINT
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FD FLOOR DRAIN
FD FIRE DAMPER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HHW HEATING HOT WATER
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HSTAT HUMIDISTAT
HW HOT WATER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UL UNDERWRITERS LABORATORY
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
W WATTS
Wb WET-BULB (TEMPERATURE)
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
MECHANICAL ABBREVIATIONS
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
WATER SENSOR
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR/VA REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR/VA.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR/VA FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
MECHANICAL GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY
GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO
COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT OR CORE DRILL CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW MECHANICAL WORK AND WORK OF OTHER TRADES.
MECHANICAL DEMOLITION GENERAL NOTES
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A. 62
/1
/2
:4
:1
P
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P F
-3
V
A A le x a n d ri a E
H R
M
G e n e ra l_ a v a s a
N N
C C
.r v t
MP001
MECHANICAL GENERAL INFORMATION
1AV
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
SWR
Docusign Envelope ID: DA068B76-2C54-400D-BC00-221FCC893EBE
3/24/2026
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA REGARDING CONFLICTS BEFORE PROCEEDING
WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR/VA DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR/VA. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR/VA FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT
NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK
AND WORK OF OTHER TRADES.
PLUMBING DEMOLITION GENERAL NOTES
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE.
SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR/VA 1 WEEK IN ADVANCE.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
20. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
PLUMBING GENERAL NOTES
DHW
PIPING SYSTEM
ST STORM
OFD OVERFLOW STORM DRAIN
SAN SANITARY WASTE
CD CONDENSATE DRAIN
MA MEDICAL AIR
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
DCW DOMESTIC COLD WATER
DOMESTIC HOT WATER
DHWR DOMESTIC HW RECIRCULATION
ST
OFD
SAN
CD
MA
WAGD
VAC
V
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
PLUG VALVE
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
AUTOMATIC AIR VENT
PRESSURE GAUGE
THERMOMETER
OR
CO
PIPE SLOPE ARROW
AV
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HP HORSEPOWER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LAV LAVATORY
LBS/HR POUNDS PER HOUR
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MER MECHANICAL EQUIPMENT ROOM
MSB MOP SINK BASIN
MV MEDICAL VACUUM
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH -
ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SPR SPRINKLER LINE
SQFT SQUARE FOOT
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WHA WATER HAMMER ARRESTOR
WPD WATER PRESSURE DROP
WS WASTE STACK
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BHP BREAK HORSEPOWER
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CS CLINICAL SINK
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DF DRINKING FOUNTAIN
DN DOWN
DOE DEPARTMENT OF ENERGY
DWG DRAWING
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONITORING AND CONTROL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
EWC ELECTRIC WATER COOLER
EWS EYEWASH STATION
EX EXISTING
PLUMBING SYMBOLS PLUMBING SYMBOLS
ANNOTATION SYMBOLS
PLUMBING SYMBOLS & ABBREVIATIONS
ANNOTATION ABBREVIATIONS
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# 62
/1
/2
:4
:2
P
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P F
-3
V
A A le x a n d ri a E
H R
M
G e n e ra l_ a v a s a
N N
C C
.r v t
MP002
PLUMBING GENERAL INFORMATION
2AV
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
SWR
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF
WORK.
2. COORDINATE WITH COR/VA FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE
THE COR/VA THREE (3) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND
DISPOSED OF.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
1. USE NFPA-13 (2019), CHAPTER “PLANS AND CALCULATIONS” AS A GUIDELINE WHEN PREPARING SUBMITTALS FOR REVIEW.
DISREGARD ONLY THOSE ITEMS NOT APPLICABLE TO THE INDIVIDUAL BUILDING SYSTEM. FIRE PROTECTION MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA-13 FOR THE INSTALLATION
OF AUTOMATIC SPRINKLER SYSTEM.
2. INSTALLATION SHALL COMPLY WITH VA REQUIREMENTS.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.
LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE
HAZARD CLASSIFICATION.
4. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA
REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
5. SPRINKLER HEAD LAYOUTS INDICATED ARE BASED ON OCCUPANCY HAZARD CLASSIFICATIONS OUTLINED IN NFPA-13 AND VA
STANDARDS.
6. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
7. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
8. PROVIDE SPRINKLER HEADS IN CONCEALED LOCATIONS IN ACCORDANCE WITH NFPA REQUIREMENTS.
9. CLEAN ENTIRE WORK AREA OF ALL DUST, DIRT, AND OTHER DEBRIS. MAINTAIN WORK AREA IN CLEAN CONDITION.
10. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, ETC. REQUIRED FOR COMPLETE AND FUNCTIONAL SYSTEM AS
SPECIFIED AND INDICATED ON THE DRAWINGS.
11. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE WORK AT NO ADDITIONAL COST TO THE VA.
12. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
13. FURNISH AND INSTALL ARMOVER SUPPORTS FOR ALL END OF LINE BRANCH LINES IN ACCORDANCE WITH NFPA-13.
14. ALL DROPS TO SPRINKLER HEADS SHALL TEE / ELBOW OFF TOP OF BRANCH PIPE, EXCEPT WHERE STRUCTURAL, ARCHITECTURAL OR MECHANICAL EQUIPMENT CONDITIONS PRECLUDE CONNECTION AT TOP OF PIPE.
15. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.
LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.
FIRE SUPPRESSION GENERAL NOTES
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
WET FIRE SUPPRESSION LINEFS
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
CLEAN AGENT FIRE SUPPRESSION LINEFP-D
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS
CEILING MOUNTED SMOKE DETECTOR CLEAN AGENT DISCHARGE NOZZLESD
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR/VA'S
ACCEPTANCE.
INFECTION CONTROL MEASURES
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.
2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.
IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION
WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR
INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO
BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL
VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY
PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS
OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.
REFER NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
FLUSHING CONNECTION
FEED OR CROSS MAIN.
TYPICAL TEE WITH
CROSS MAIN PITCH
TOWARDS FEED MAIN.
NOTE: INSTALL FLUSHING
CONNECTION AT END OF
CROSS MAINS.
2" NIPPLE 4" LONG
WITH CAP.
MECHANICAL TEE
NEW PIPING
MECHANICAL TEE
SCREWED END
STEEL BEAM
RETAINING STRAP
C-CLAMP
THREADED HANGER ROD
ADJUSTABLE RING HANGER
NOTE:
HANGING DETAILS SHOWN ARE SUBJECT TO REQUIREMENTS OF SEISMIC DESIGN.
EXPANSION ANCHOR HILT QUIK
BOLT TZ OR APPROVED EQUAL.
EXPANSION ANCHOR SHALL BE
QUALIFIED FOR USE IN CRACKED
CONCRETE PER ACI 355.2
EXISTING CONCRETE SLAB
AUTO. SPRINKLER PIPE
SET SCREW
SURGE RESTRAINER
1" X ARMOVER
1" 90 EL
1" X DROP
DROP NIPPLE
1" x 1/2" R.C. REDUCER
NOTE:
1. ALL SPRINKLERS SHALL BE FM APPROVED QUICK RESPONSE.
2. ALL EXPOSED PIPING SHALL BE PAINTED RED.
SUSPENDED CEILING
HANGERS SHALL
BE PROVIDED AS
REQUIRED BY
NFPA 13 TYPICAL
1" x 2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
STAINLESS STEEL FLEXIBLE HOSE MAY
BE USED IF IT HAS A MINIMUM 1" PIPE
DIAMETER AND MAXIMUM 6' LENGTH.
INSTALL INSULATION AFTER
CAULKING SLEEVE, SEAL
ANNULAR SPACE.
FIRE RATED WALL AND OR SLAB.
STEEL PIPE SLEEVE TERMINATE
SLEEVE FLUSH WITH FINISHED
SURFACE.
UL-LISTED FIRESTOPPING
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND OF
SIZE TO COMPLETELY COVER
OPENING.
APPROVED TYPE FIRE SAFE &
SMOKE TIGHT CAULKING SEALER
BETWEEN BARE PIPE AND SLEEVE.
NOTE:
MINIMUM SIZE OF OPENINGS AROUND SPRINKLER PIPE PENETRATIONS OF CONCRETE OR CMU WALLS
SHALL BE IN ACCORDANCE WITH NFPA 13 SEISMIC REQUIREMENTS.
NOTES:
1. ALL EXPOSED PIPING SHALL BE PAINTED RED.
2. PROVIDE GUARDS ON UPRIGHT SPRINKLERS UNLESS OTHERWISE NOTED.
THREADED
HANGER ROD
SURGE
RESTRAINER
ADJUSTABLE
RING HANGER
BRANCHLINE
AUTO. SPRINKLER FEED
UPRIGHT AUTOMATIC
SPRINKLER, FM APPROVED,
QUICK RESPONSE
REDUCER
RISER NIPPLE
REDUCING TEE
LISTED WIRE GUARD
(RED COLOR)
FIRE PROTECTION PIPING SHALL BE
COORDINATED WITH ALL OTHER TRADES
AND A MINIMUM OF 8" ABOVE CABLE
TRAY IN TELECOMMUNICATION ROOMS.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# 62
/1
/2
:4
:2
P
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P F
-3
V
A A le x a n d ri a E
H R
M
G e n e ra l_ a v a s a
N N
C C
.r v t
MP003
FIRE SUPPRESSION GENERAL
INFORMATION
3AV
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
SWR
Scale: No Scale
MECHANICAL TEE AND FLUSHING CONNECTION DETAIL
Scale: No Scale
PIPE HANGER SUPPORT DETAIL
Scale: No Scale
SEMI-RECESSED PENDENT SPRINKLER DETAIL
Scale: No Scale
SPRINKLER PIPE SLEEVE THRU FIRE RATED WALL DETAIL
Scale: No Scale
UPRIGHT AUTOMATIC SPRINKLER WITH GUARD DETAIL
001.MP401
01-1-CU-1 01-1-CU-2
01-1-DAC-1
RL
RS
TR
PMS
PMS
HRM.
ADMIN
CLERK
CLERK
CLERK
109B
CLERK
109A
SECRETARY
AAC
HRM
MGR
WOMENS
TLT.
MENS
TLT.
LOBBY
STORAGE
NURSING
CONF.
ROOM
ADMIN.
ASSISTANT
ASSOCIATE
CHIEF
UNIT
SUPERVISOR
SECRETARY
PROGRAM
ASSISTANT
120B
TIME
KEEPER
119B
PMS
119A
PMS
NURSE
EXEC
120A
3/4" D
RS
RL
CONDENSING UNITS MOUNTED ON GRADE.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:3
A
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P
-3
V
A A le x a n d ri a E
H R
M
B ld g a v a s a
N N
C C
M a r2
.r v t
001.M-101
BUILDING 1, FIRST FLOOR, OVERALL
MECHANICAL PLAN
4 62SMR
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
N O
R T H0 4 8 16
1 ROUTE REFRIGERANT PIPING TO ASSOCIATED
INDOOR SPLIT SYSTEM.
2 ROUTE CONDENSATE DRAIN PIPING TO
EXTERIOR WALL, DISCHARGE CONDENSATE ON
NEW SPLASH BLOCK.
Scale: 3/16" = 1'-0"
FIRST FLOOR, MECHANICAL OVERALL PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
T
6x6 1
PMS
1" 1"
TR
TH
01-1-DAC-1
RL
RS
3/4" D T
PMS
NO PLUMBING
DEMOLITION WORK
IN THIS AREA.
TR
NO PLUMBING WORK
IN THIS AREA.
PMS
NO FIRE
SUPPRESSION
DEMOLITION WORK IN
THIS AREA.
TR
NO FIRE SUPPRESSION
WORK IN THIS AREA
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:3
A
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P
-3
V
A A le x a n d ri a E
H R
M
B ld g a v a s a
N N
C C
M a r2
.r v t
001.MP401
BUILDING 1, FIRST FLOOR, TELECOM
ROOM 103 PLANS
5 62SMR
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
1 DEMOLISH EXISTING MECHANICAL HYDRONIC
PIPING AS INDICATED AND CAP AT MAIN.
2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,
AND HANGERS. DEMOLISH ASSOCIATED
THERMOSTAT AND WIRING.
3 DEMOLISH DIFFUSER / GRILLE AND ASSOCIATED
DUCTWORK BACK TO LIMITS OF DEMOLITION
AND CAP.
4 DEMOLISH STEAM RADIATOR AND CAP STEAM
SUPPLY AND CONDENSATE PIPING AT FLOOR.
5 DEMOLISH EXISTING WINDOW AC UNIT.
1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'
10" AFF. REFRIGERANT PIPING TO BE ROUTED
TO OUTSIDE UNIT. REFER TO OVERALL PLANS.
2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT
FOR MONITORING AND TRACKING ROOM
TEMPERATURE AND HUMIDITY. SHALL
COMMUNICATE WITH ECC.
3 ROUTE CONDENSATE TO EXTERIOR WALL, SEE
001.M-101 FOR CONTINUATION.
4 PROVIDE WATER LEAK SENSOR ON FLOOR AND
CONNECT TO THE BAS AND ALARM IF WATER IS
SENSED.
5 PROVIDE MANUFACTURERS THERMOSTAT FOR
INDOOR SPLIT UNIT.
N O
R T H0 2 4 8
N O
R T H0 2 4 8
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
C. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VAPHS REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
D. NO DEAD ENDS IN DOMESTIC WATER PIPING
SHALL REMAIN. THE MAXIMUM LENGTH OF
DEAD ENDS SHALL BE TWO PIPE DIAMETERS
FROM THE BRANCH, RISER, OR MAIN.
E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS
AND GRILLE RUN-OUTS ARE THE SAME SIZE AS
THE NECK/DUCT CONNECTION SIZE SPECIFIED
IN THE AIR DEVICE SCHEDULE.
F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
G. COORDINATE ALL THERMOSTAT LOCATIONS
WITH ALL OTHER WALL MOUNTED OBJECTS
BEFORE INSTALLATION.
H. PROVIDE ISOLATION BALL VALVES FOR EACH
PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS
POSSIBLE.
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 103 MECHANICAL
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 103 MECHANICAL
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
REFRIGERANT LIQUID / SUCTION
PIPE AND CONDENSATE PIPE FROM
ABOVE SEE 001.MP402
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 103 PLUMBING
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 103 PLUMBING PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM ROOM 103
FIRE SUPPRESSION
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 103 FIRE
SUPPRESSION PLAN
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
T
ROOM
1" 1"
2" CHR
2" CHS
TR
T
H
01-2-DAC-1
3/4" D
RL
RS
T
ROOM
NO PLUMBING
DEMOLITION WORK
IN THIS AREA.
TR
NO NEW PLUMBING
WORK IN THIS AREA.
ROOM
NO FIRE SUPPRESSION
DEMOLITION WORK IN
THIS AREA.
TR
NO NEW FIRE
SUPPRESSION
WORK IN THIS AREA.
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:3
A
M C
U s e rs
\a v a s a
\D o c u m e n ts \M
P
-3
V
A A le x a n d ri a E
H R
M
B ld g a v a s a
N N
C C
M a r2
.r v t
001.MP402
BUILDING 1, SECOND FLOOR,
TELECOM ROOM 202 PLANS
6 62SMR
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
1 DEMOLISH EXISTING MECHANICAL HYDRONIC
PIPING AS INDICATED AND CAP.
2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,
AND HANGERS. DEMOLISH ASSOCIATED
THERMOSTAT AND WIRING.
3 DEMOLISH DIFFUSER / GRILLE AND ASSOCIATED
DUCTWORK BACK TO LIMITS OF DEMOLITION
AND CAP.
4 DEMOLISH STEAM RADIATOR AND CAP STEAM
SUPPLY AND CONDENSATE PIPING AT FLOOR.
N O
R T H0 2 4 8
N O
R T H0 2 4 8
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
C. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VAPHS REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
D. NO DEAD ENDS IN DOMESTIC WATER PIPING
SHALL REMAIN. THE MAXIMUM LENGTH OF
DEAD ENDS SHALL BE TWO PIPE DIAMETERS
FROM THE BRANCH, RISER, OR MAIN.
E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS
AND GRILLE RUN-OUTS ARE THE SAME SIZE AS
THE NECK/DUCT CONNECTION SIZE SPECIFIED
IN THE AIR DEVICE SCHEDULE.
F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
G. COORDINATE ALL THERMOSTAT LOCATIONS
WITH ALL OTHER WALL MOUNTED OBJECTS
BEFORE INSTALLATION.
H. PROVIDE ISOLATION BALL VALVES FOR EACH
PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS
POSSIBLE.
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM
ROOM 202 MECHANICAL
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM
ROOM 202 MECHANICAL
PLAN
1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'
10" AFF. REFRIGERANT PIPING TO BE ROUTED
TO OUTSIDE UNIT. REFER TO OVERALL PLANS.
2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT
FOR MONITORING AND TRACKING ROOM
TEMPERATURE AND HUMIDITY. SHALL
COMMUNICATE WITH ECC.
3 REFRIGERANT PIPING AND CONDENSATE DRAIN
PIPING ROUTED DOWN TO FIRST FLOOR. SEE
001.MP401 FOR CONTINUATION.
4 PROVIDE WATER LEAK SENSOR ON FLOOR AND
CONNECT TO THE BAS AND ALARM IF WATER IS
SENSED.
5 PROVIDE MANUFACTURERS THERMOSTAT FOR
INDOOR SPLIT UNIT.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM
ROOM 202 PLUMBING
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM
ROOM 202 PLUMBING PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM ROOM
202 FIRE SUPPRESSION
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR TELECOM
ROOM 202 FIRE
SUPPRESSION PLAN
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
RMS STORAGE
RMS
408A
RMS
407B
RMS
STAIR
RECREATIONAL
THERAPY
LIN.
405A
B / MGT.
STORAGE
RMS STORAGE
TOILET
410A
JANITOR
ELEC
B / MGT.
STORAGE
PHARMACY
PHARMACY
PHARM.
401A B / MGT.
STORAGE
B / MGT.
A&MMS
STORAGE
IRM STORAGE
IRM STORAGE
B / MGT.
STAIR
PHARM.
401B
418A
RMS STORAGE
TR
424 CANTEEN
STAIRS
02-1-CU-2
02-1-CU-3
02-1-CU-1
02-1-CU-4
PROVIDE SPLIT SYSTEM CONDENSING UNITS
ON ROOF. UNITS SHALL BE WALL MOUNTED.
ROUTE 4 SETS OF MINI-SPLIT
REFRIGERANT PIPING TO CONDENSING
UNITS ON BUILDING 2 4TH FLOOR ROOF.
002.MP404
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:5
A
M C
U s e rs \a v a s a
\D o c u m e n ts
\M
-3
V A
A le x a n d ri a
E H
R M
B ld g a v a s a
N N
C C
.r v t
002.M-101
BUILDING 2, FOURTH FLOOR, OVERALL
MECHANICAL PLAN
7 62SMR
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
N O
R T H0 4 8 16
Scale: 1/8" = 1'-0"
FOURTH FLOOR, OVERALL MECHANICAL PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
EDUC
1" CHS
1" CHR
1/2" HWR
1/2" HWS
EDUC
TR
TR
TH
1" D
1" CHS
1" CHR
3/4" HWR
3/4" HWS
T7
02-1-DAC-1
RL
RS
1" D
TR
NO NEW PLUMBING
WORK IN THIS AREA.
EDUC
NO PLUMBING
DEMOLITION WORK IN
THIS AREA.
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:5
A
M C
U s e rs \a v a s a
\D o c u m e n ts
\M
-3
V A
A le x a n d ri a
E H
R M
B ld g a v a s a
N N
C C
.r v t
002.MP401
BUILDING 2, FIRST FLOOR, TELECOM
ROOM 133 PLANS
8 62AV
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
1 REMOVE EXHAUST / RETURN GRILLE AND
ASSOCIATED DUCT BACK TO BRANCH TAKEOFF
AND CAP DUCT.
2 DEMOLISH EXISTING FCU / VAV BOX, VALVES,
AND HANGERS.
3 DEMOLISH EXISTING MECHANICAL HYDRONIC
PIPING AS INDICATED AND CAP. PREPARE TO
REROUTE IN NEW WORK.
4 DEMOLISH EXISTING SPRINKLER HEAD.
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 MECHANICAL
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 FIRE
SUPPRESSION DEMOLITION
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 FIRE
SUPPRESSION PLAN
1 PROVIDE DUCTLESS SPLIT SYSTEM. MOUNT 6'
10" AFF. REFRIGERANT PIPING TO BE ROUTED
TO OUTSIDE UNIT. REFER TO OVERALL PLANS.
2 PROVIDE DDC THERMOSTAT AND HUMIDISTAT
FOR MONITORING AND TRACKING ROOM
TEMPERATURE AND HUMIDITY. SHALL
COMMUNICATE WITH ECC.
3 CONNECT 3/4" CONDENSATE DRAIN TO RISER
FROM ABOVE.
4 PROVIDE WATER LEAK SENSOR ON FLOOR AND
CONNECT TO THE BAS AND ALARM IF WATER IS
SENSED.
5 ROUTE CONDENSATE PIPE FROM ABOVE TO
CONDENSATE PIPE SERVING EXISTING FCUS.
6 REROUTE EXISTING HYDRONIC PIPING AROUND
NEW TR ROOM, CONNECT TO EXISTING FAN
COIL UNIT IN ROOM 134.
7 PROVIDE MANUFACTURERS THERMOSTAT FOR
INDOOR SPLIT UNIT.
8 PROVIDE UPRIGHT SPRINKLER HEADS WITH
WIREGUARD AND CONNECT TO THE EXISTING
FIRE PROTECTION PIPING.
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
N O
R T H0 2 4 8
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
C. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VAPHS REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
D. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM
LENGTH OF DEAD ENDS SHALL BE TWO PIPE
DIAMETERS FROM THE BRANCH, RISER, OR
MAIN.
E. UNLESS NOTED OTHERWISE, ALL DIFFUSERS
AND GRILLE RUN-OUTS ARE THE SAME SIZE AS
THE NECK/DUCT CONNECTION SIZE SPECIFIED
IN THE AIR DEVICE SCHEDULE.
F. ALL DIFFUSER AND GRILLE TAKEOFFS SHALL
INCLUDE A BALANCING DAMPER.
G. COORDINATE ALL THERMOSTAT LOCATIONS
WITH ALL OTHER WALL MOUNTED OBJECTS
BEFORE INSTALLATION.
H. PROVIDE ISOLATION BALL VALVES FOR EACH
PIPING BRANCH. LOCATE AS CLOSE TO MAIN AS
POSSIBLE.
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 MECHANICAL
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 PLUMBING PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR TELECOM
ROOM 133 PLUMBING
DEMOLITION PLAN
N O
R T H0 2 4 8
N O
R T H0 2 4 8
TR
T H
RL
RS
5T
02-2-DAC-1
TWO SETS OF
REFRIGERANT SUCTION /
LIQUID TO THIRD FLOOR.
ONE SET OF REFRIGERANT
SUCTION / LIQUID UP FROM
FIRST FLOOR.
3/4" D
1" D
NURSE
OFFICE
NURSE
OFFICE
TR
NURSE
OFFICE
TR
NO NEW PLUMBING
WORK IN THIS AREA.
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:0
:5
A
M C
U s e rs \a v a s a
\D o c u m e n ts
\M
-3
V A
A le x a n d ri a
E H
R M
B ld g a v a s a
N N
C C
.r v t
002.MP402
BUILDING 2, SECOND FLOOR,
TELECOM ROOM 256 PLANS
9 62AV
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
SWR
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
B. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
C. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VAPHS REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
D. NO DEAD ENDS SHALL REMAIN. THE MAXIMUM
LENGTH OF DEAD ENDS SHALL BE TWO PIPE
DIAMETERS FROM THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .