Attachment 7 - Key Subcontractor Information.docx

DOCX document 98 KB Posted

Attached to
Y1DZ--502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
Solicitation number
36C77626R0104
Issued by

About this file

This is a Key Subcontractor Information (KSI) template form for Solicitation 36C77626R0104, an EHRM Infrastructure Upgrades project in Pineville, Louisiana. The form is designed to be completed by offerors for submission with their proposals and counts toward the specified page limitations. Offerors must submit one KSI form for each of up to three projects maximum; no additional projects beyond the three will be accepted. Each project submission must be furnished and installed by a communications installer and shall include a final acceptance date.

The KSI form requires offerors to document specific project information including the installation location, project title, contract number, contract value, prime contractor name, client name and contact information, address, telephone and email, project start date, final acceptance date, and system project number. Each submission must demonstrate Division 27 complexity in the project description and meet or exceed $5 million in Division 27 complexity work. Additionally, offerors must provide a detailed project description for each system, including the function, operation, and installation methodology for all systems related to the project. Projects cannot be assigned more than one system project number.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
ME_SUBMITTAL_PKA-AK24NL_PUZ-AH24NL_XbtyE.pdf PDF
ME_SUBMITTAL_PKA-AK36NL_PUZ-AK36NL_6PSmo.pdf PDF
RFI Update 10-7-26.pdf PDF
Amendment 0006.pdf PDF
RFI Responses.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Site Visit Sign In Sheet 8-20-26.pdf PDF
Site Visit Agenda.pdf PDF
Amendment 0003.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0002.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0001.pdf PDF
Attachment 9 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 4 - Vol 3 Drawings.pdf PDF
Attachment 3 - Volume 2 Drawings.pdf PDF
Attachment 10 - Wage Determination.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - Site Visit Details.docx DOCX document
Attachment 8 - Key Personnel.docx DOCX document
Attachment 5 - Vol 4 Drawings.pdf PDF
Attachment 10 - Key Subcontractor Information.docx DOCX document
Attachment 11 - Key Personnel.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Vol 1 Drawings.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Attachment 6 - Vol 2 Drawings Part 4.pdf PDF
Attachment 5 - Vol 2 Drawings Part 3.pdf PDF
Attachment 8 - Vol 4 Drawings.pdf PDF
Attachment 7 - Vol 3 Drawings.pdf PDF
Attachment 3 - Vol 2 Drawings.pdf PDF
Attachment 12 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 14 - Site Visit Details.docx DOCX document
Attachment 4 - Vol 2 Drawings Part 2.pdf PDF
36C77626R0104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 36C77626R0104 | EHRM INFRASTRUCTURE UPDGRADES PINEVILLE, LA.

KEY SUBCONTRACTOR INFORMATON (KSI)

*KSIs should be provided back to the PRIME to incorporate into their proposal, all KSIs should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

KEY SUBCONTRACTOR INFORMATION – Offeror to complete 1 form for each project #1-3. No other projects beyond projects 1-3 will be accepted. Projects cannot have more than one system project number. Projects submitted shall be furnished and installed by the communications installer. Shall have a final acceptance date. Shall demonstrate division 27 complexity in the project description and meet or exceed 5 million dollars of division 27 complexity work.

1. PROJECT INFORMATION

· Installation location

· Project Title

· Contract Number

· Contract Value

· Prime Contractor Name

· Client’s name and contact information as listed below

· Address:

· Telephone and E-mail

· Date of Project Start

· Date of Final Acceptance.

· System Project Number.

2. PROJECT DESCRIPTION

Description of each system related to this project; include function, operation, and installation image1.tiff

File details come from the government source that posted it. Updated .