Attachment 2 - Vol 1 Drawings.pdf
PDF 15 MB Posted
- Solicitation number
- 36C77626R0104
About this file
This is a technical drawings file (Volume 1) supporting an infrastructure upgrade solicitation for the Department of Veterans Affairs at multiple facilities in Louisiana. The drawings provide visual documentation and specifications for the comprehensive infrastructure improvements outlined in the solicitation, which encompasses electrical system upgrades (panel replacement, power distribution for normal and emergency systems), bonding and UPS installations, Building Management System interfaces, HVAC assessment and upgrades, data center reconfiguration with rack/cabinet relocation and cable management, communication infrastructure enhancements (new data outlets, patch panels, Cat 6A cabling), physical security upgrades, fiber backbone assessment and installation campus-wide, wide area network diversification, and hazardous material abatement. The drawings apply to 20 primary buildings at the main facility (Buildings 1-9, 13-16, 45-46, 49, 136, 142, 147, and 171) as well as satellite Community-Based Outpatient Clinics (CBOCs) in Jennings, Lafayette, Lafayette Campus B, and Natchitoches. These technical drawings serve as the visual reference materials contractors will use to understand spatial layouts, existing infrastructure conditions, proposed modifications, and technical specifications necessary to develop accurate proposals and execute the scope of work.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-001.1
COVER VOLUME 1
1 86MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
VA PROJECT #: 502-21-222
WVS
VOLUME 1
VOLUME 1 OF 4
SHEET LIST
SHEET NUMBER SHEET NAME DWG OF DWG
GENERAL
G-001.1 COVER VOLUME 1 1 86
G-002 GENERAL INFORMATION 2 86
G-003 CAMPUS MAP 3 86
G-004 TYPICAL ICRA CONDITIONS AND DETAILS 4 86
G-005 CONTRACTOR WORK PROCEDURES 5 86
001.G-101 BUILDING 1, BASEMENT OVERALL PLAN 6 86
001.G-111 BUILDING 1, FIRST FLOOR OVERALL PLAN 7 86
001.G-121 BUILDING 1, SECOND FLOOR OVERALL PLAN 8 86
002.G-111 BUILDING 2, FIRST FLOOR, OVERALL PLAN 9 86
002.G-121 BUILDING 2, SECOND FLOOR, OVERALL PLAN 10 86
002.G-131 BUILDING 2, THIRD FLOOR, OVERALL PLAN 11 86
002.G-141 BUILDING 2, FOURTH FLOOR, OVERALL PLAN 12 86
003.G-111 BUILDING 3, FIRST FLOOR OVERALL PLAN 13 86
003.G-121 BUILDING 3, SECOND FLOOR OVERALL PLAN 14 86
003.G-131 BUILDING 3, THIRD FLOOR OVERALL PLAN 15 86
004.G-101 BUILDING 4, BASEMENT OVERALL PLAN 16 86
004.G-111 BUILDING 4, FIRST FLOOR OVERALL PLAN 17 86
005.G-101 BUILDING 5, BASEMENT FLOOR ELECTRICAL OVERALL PLAN 18 86
005.G-111 BUILDING 5, FIRST FLOOR OVERALL PLAN 19 86
005.G-121 BUILDING 5, SECOND FLOOR OVERALL PLAN 20 86
006.G-101 BUILDING 6, BASEMENT OVERALL PLAN 21 86
006.G-111 BUILDING 6, FIRST FLOOR OVERALL PLAN 22 86
006.G-121 BUILDING 6, SECOND FLOOR OVERALL PLAN 23 86
006.G-131 BUILDING 6, THIRD FLOOR OVERALL PLAN 24 86
007.G-100 BUILDING 7, BASEMENT FLOOR, OVERALL PLAN 25 86
007.G-110 BUILDING 7, FIRST FLOOR, OVERALL PLAN 26 86
007.G-120 BUILDING 7, SECOND FLOOR, OVERALL PLAN 27 86
007.G-130 BUILDING 7, THIRD FLOOR, OVERALL PLAN 28 86
007.G-140 BUILDING 7, FOURTH FLOOR, OVERALL PLAN 29 86
007.G-101 BUILDING 7, BASEMENT, OVERALL PLAN A 30 86
007.G-102 BUILDING 7, BASEMENT, OVERALL PLAN B 31 86
007.G-103 BUILDING 7, BASEMENT, OVERALL PLAN C 32 86
007.G-104 BUILDING 7, BASEMENT, OVERALL PLAN D 33 86
007.G-105 BUILDING 7, BASEMENT, OVERALL PLAN E 34 86
007.G-106 BUILDING 7, BASEMENT, OVERALL PLAN F 35 86
007.G-111 BUILDING 7, FIRST FLOOR, OVERALL PLAN A 36 86
007.G-112 BUILDING 7, FIRST FLOOR, OVERALL PLAN B 37 86
007.G-113 BUILDING 7, FIRST FLOOR, OVERALL PLAN C 38 86
007.G-114 BUILDING 7, FIRST FLOOR, OVERALL PLAN D 39 86
007.G-115 BUILDING 7, FIRST FLOOR, OVERALL PLAN E 40 86
007.G-116 BUILDING 7, FIRST FLOOR, OVERALL PLAN F 41 86
007.G-121 BUILDING 7, SECOND FLOOR, OVERALL PLAN A 42 86
007.G-122 BUILDING 7, SECOND FLOOR, OVERALL PLAN B 43 86
007.G-123 BUILDING 7, SECOND FLOOR, OVERALL PLAN C 44 86
007.G-124 BUILDING 7, SECOND FLOOR, OVERALL PLAN D 45 86
007.G-125 BUILDING 7, SECOND FLOOR, OVERALL PLAN E 46 86
007.G-126 BUILDING 7, SECOND FLOOR, OVERALL PLAN F 47 86
007.G-131 BUILDING 7, THIRD FLOOR, OVERALL PLAN A 48 86
007.G-132 BUILDING 7, THIRD FLOOR, OVERALL PLAN B 49 86
007.G-133 BUILDING 7, THIRD FLOOR, OVERALL PLAN C 50 86
007.G-134 BUILDING 7, THIRD FLOOR, OVERALL PLAN D 51 86
007.G-135 BUILDING 7, THIRD FLOOR, OVERALL PLAN E 52 86
007.G-136 BUILDING 7, THIRD FLOOR, OVERALL PLAN F 53 86
007.G-141 BUILDING 7, FOURTH FLOOR, OVERALL PLAN A 54 86
007.G-142 BUILDING 7, FOURTH FLOOR, OVERALL PLAN B 55 86
007.G-143 BUILDING 7, FOURTH FLOOR, OVERALL PLAN C 56 86
007.G-144 BUILDING 7, FOURTH FLOOR, OVERALL PLAN D 57 86
007.G-145 BUILDING 7, FOURTH FLOOR, OVERALL PLAN E 58 86
007.G-146 BUILDING 7, FOURTH FLOOR, OVERALL PLAN F 59 86
008.G-101 BUILDING 8, FIRST FLOOR OVERALL PLANS 60 86
009.G-110 BUILDING 9, FIRST FLOOR ELECTRICAL, OVERALL PLAN 61 86
009.G-111 BUILDING 9, FIRST FLOOR OVERALL PLAN A 62 86
009.G-112 BUILDING 9, FIRST FLOOR OVERALL PLAN B 63 86
009.G-113 BUILDING 9, FIRST FLOOR OVERALL PLAN C 64 86
009.G-120 BUILDING 9, SECOND FLOOR OVERALL PLAN 65 86
009.G-121 BUILDING 9, SECOND FLOOR OVERALL PLAN A 66 86
009.G-122 BUILDING 9, SECOND FLOOR OVERALL PLAN B 67 86
009.G-123 BUILDING 9, SECOND FLOOR ELECTRICAL, OVERALL PLAN C 68 86
009.G-130 BUILDING 9, THIRD FLOOR OVERALL PLAN 69 86
009.G-131 BUILDING 9, THIRD FLOOR OVERALL PLAN A 70 86
009.G-132 BUILDING 9, THIRD FLOOR OVERALL PLAN B 71 86
009.G-133 BUILDING 9, THIRD FLOOR OVERALL PLAN C 72 86
013.G-111 BUILDING 13, FIRST FLOOR OVERALL PLAN 73 86
014.G-111 BUILDING 14, FIRST FLOOR, OVERALL PLAN 74 86
015.G-111 BUILDING 15, FIRST FLOOR OVERALL PLAN 75 86
016.G-111 BUILDING 16, FIRST FLOOR, OVERALL PLAN 76 86
045.G-111 BUILDING 45, FIRST FLOOR, OVERALL PLAN 77 86
045.G-121 BUILDING 45, SECOND FLOOR, OVERALL PLAN 78 86
046.G-111 BUILDING 46, FIRST FLOOR, OVERALL PLAN 79 86
046.G-121 BUILDING 46, SECOND FLOOR, OVERALL PLAN 80 86
046.G-131 BUILDING 46, THIRD FLOOR, OVERALL PLAN 81 86
049.G-111 BUILDING 49, FIRST FLOOR, OVERALL PLAN 82 86
136.G-111 BUILDING 136, FIRST FLOOR, OVERALL PLAN 83 86
142.G-111 BUILDING 142, FIRST FLOOR, OVERALL PLAN 84 86
147.G-111 BUILDING 147, FIRST FLOOR, OVERALL PLAN 85 86
171.G-111 BUILDING 171, FIRST FLOOR, OVERALL PLANS 86 86
W
AL
TE
R DAVID VAN SCOTER
REG. NO. 9953
Docusign Envelope ID: 7FA18971-B6F6-44A9-896C-7B85FF50EEA5
3/23/2026
TELECOM ROOM PHASING NOTES
A. WORK RELATED THE REMODELING OF EXISTING ROOMS INTO NEW
TELECOMMUNICATION ROOMS SHALL BE PERFORMED SEQUENTIALLY BY
FLOOR STARTING AT THE LOWEST FLOOR LEVEL. ALL WORK, EXCLUDING
WORK IN THE TELECOMMUNICATION ROOMS, WILL BE COMPLETED ON THE
FLOOR AND APPROVED BY THE COR BEFORE PROCEEDING TO THE NEXT
FLOOR.
B. CONTRACTOR WILL BE ALLOWED TO MODIFY OR CONSTRUCT FOUR
TELECOMMUNICATION ROOMS AT A TIME. ALL FOUR ROOMS MUST BE
COMPLETED AND APPROVED BY COR PRIOR TO PROCEEDING TO WORK ON
ADDITIONAL ROOMS.
C. WORK HOURS AND SPECIAL CONSIDERATIONS WITHIN THE WORK
CONSTRAINT BY AREA MATRIX.
D. ANY DATA PORTS MOVED FROM OLD INFRASTRUCTURE TO NEW SHALL BE
OPERABLE AT THE END OF EACH WORKDAY. THE PRIORITY IS TO NOT LOSE
DATA SERVICE FOR MORE THAN ONE SHIFT.
E. COORDINATE WITH COR FOR ALL OUTAGES THAT WILL AFFECT MORE THAN 6
ROOMS AT A TIME. OUTAGE MUST BE APPROVED IN WRITING A MINIMUM OF 3
WEEKS PRIOR.
F. DATA CABLING REPLACEMENT FOR AREAS SERVED BY A NEWLY
CONSTRUCTED TELECOMMUNICATIONS ROOM SHOULD BE INSTALLED IN THE
FOLLOWING MANNER:
F.1 CONSTRUCT CLOSET, INSTALL RACKS AND EQUIPMENT.
F.2 RUN CABLING TO EACH ROOM SERVED BY THE CLOSET DOWN THE
CORRIDORS AND COIL THE CABLE IN EACH DESTINATION ROOM.
F.3 TERMINATE ALL CABLES AT THE PATCH PANELS WITHIN THE NEW
CLOSET.
F.4 PULL OUT OLD CABLES AT EACH ROOM AND TERMINATE AT NEW
PORTS SPECIFIED. A MAXIMUM OF 6 ROOMS CAN BE TAKEN OUT
OF SERVICE AT A TIME.
F.5 BLANK ANY FACEPLATES NO LONGER USED UP, AND INSTALL
FACEPLATE COVERS.
F.6 COORDINATE WITH THE COR TO BE PRESENT DURING TEST AND
CERTIFY ALL CABLES PER SPECIFICATION PRIOR TO MOVING TO
NEXT ROOMS.
F.7 PLUG ALL EXISTING EQUIPMENT INTO NEW PORTS.
G. DATA CABLING REPLACEMENT FOR AREAS SERVED BY A MOVED
TELECOMMUNICATIONS ROOM SHOULD BE INSTALLED IN THE FOLLOWING
MANNER:
G.1 DATA CABLING REPLACEMENT FOR AREAS SERVED BY A MOVED
TELECOMMUNICATIONS ROOM SHOULD BE INSTALLED IN THE
FOLLOWING MANNER:
G.2 BUILD ONE NEW RACK AT A TIME IF SPACE IS CONSTRAINED. RUN
CABLING TO EACH ROOM SERVED BY THE CLOSET DOWN THE
CORRIDORS AND COIL THE CABLE OUTSIDE EACH ROOM.
G.3 TERMINATE ALL CABLES AT THE PATCH PANELS WITHIN THE NEW
RACK.
G.4 PULL OUT OLD CABLES AT EACH ROOM AND TERMINATE AT NEW
PORTS SPECIFIED. A MAXIMUM OF 6 ROOMS CAN BE TAKEN OUT OF
SERVICE AT A TIME.
G.5 BLANK ANY FACEPLATES NO LONGER USED UP, AND INSTALL
FACEPLATE COVERS.
G.6 COORDINATE WITH THE COR TO BE PRESENT DURING TEST AND
CERTIFY ALL CABLES PER SPECIFICATION PRIOR TO MOVING NEXT
ROOMS. PLUG ALL EXISTING EQUIPMENT INTO NEW PORTS.
G.7 REPEAT FOR EACH RACK UNTIL ALL RACKS IN CLOSET ARE
COMPLETE.
H. REMOVE ALL EXISTING CABLING THAT HAS BEEN DISCONNECTED AS PART OF
THIS PROJECT. REMOVE CABLING BY FLOOR AFTER COMPLETION OF NEW
DATA CABLING ON THAT FLOOR.
I. CONTRACTOR TO PROVIDE A DRAFT PHASING PLAN DENOTING THE ORDER IN
WHICH THE TELECOM IMPROVEMENTS WILL BE COMPLETED WITHIN 30 DAYS
OF PROJECT AWARD. THE PHASING PLAN SHALL ADDRESS THE FOLLOWING
REQUIREMENTS:
I.1 SIMULTANEOUS OPERATION OF OLD AND NEW TELECOMMUNICATION
ROOMS (TRs): DURING THE CUTOVER PERIOD, EXISTING CONNECTIONS TO OLD TRs MUST REMAIN ACTIVE UNTIL FULL CUTOVER TO THE NEW
TR IS COMPLETE. THE PHASING PLAN SHALL EXPLICITLY DESCRIBE HOW
OLD AND NEW TRs WILL BE KEPT OPERATIONAL SIMULTANEOUSLY
THROUGHOUT THE TRANSITION.
I.2 A-SIDE / B-SIDE DISTRIBUTION CUTOVER SEQUENCE: THE
RECOMMENDED APPROACH FOR TRANSITIONING FROM OLD TRs TO NEW TRs IS AS FOLLOWS:
a. BRING UP THE NEW B-SIDE DISTRIBUTION TO ALL NEW TRs WHILE LEAVING THE OLD TRs ACTIVE ON THE EXISTING
DISTRIBUTION.
b. ONCE ALL NEW TRs ARE FULLY OPERATIONAL ON THE A-SIDE
DISTRIBUTION, PROCEED TO MOVE THE A-SIDE
DISTRIBUTION TO THE NEW TRs.
c. AT NO POINT SHALL BOTH THE B-SIDE AND B-SIDE
DISTRIBUTIONS BE IN TRANSITION SIMULTANEOUSLY. THIS
ENSURES CONTINUOUS NETWORK CONNECTIVITY
THROUGHOUT THE CUTOVER PROCESS.
I.3 NATIONAL OIT SWING SWITCH LIMITATION: NATIONAL OIT LIMITS THE
NUMBER OF SWING SWITCHES TO 10 PER SITE AT ANY GIVEN TIME. SINCE
NO NEW SWITCHES ARE PROVIDED UNDER THIS CONTRACT AND EXISTING
EQUIPMENT IS BEING RELOCATED, THE PHASING PLAN SHALL ACCOUNT
FOR THIS CONSTRAINT. THE NUMBER OF TRs BEING CUT OVER
SIMULTANEOUSLY SHALL NOT EXCEED THE AVAILABLE SWING SWITCH
ALLOTMENT.
I.4 4 NATIONAL OIT ADVANCE NOTIFICATION: NATIONAL OIT REQUIRES A
MINIMUM OF 4 WEEKS ADVANCE NOTICE PRIOR TO ANY PROPOSED TR
CUTOVER ACTIVITY SO THAT SWITCHES CAN BE RECONFIGURED. THE
CONTRACTOR SHALL INCORPORATE THIS LEAD TIME INTO THE PHASING
PLAN AND SUBMIT CUTOVER NOTIFICATIONS TO NATIONAL OIT IN
ACCORDANCE WITH THIS REQUIREMENT. THE COR SHALL BE COPIED ON
ALL SUCH NOTIFICATIONS.
J. CONTRACTOR SHOULD KEEP A ROLLING 3 WEEK LOOK AHEAD DENOTING
SCHEDULE FOR CABLING WORK IN EACH AREA.
K. CONTRACTOR TO SCHEDULE WALK THROUGH OF EACH DEPARTMENT AT
LEAST 90 DAYS PRIOR TO STARTING WORK TO DISCUSS SEQUENCING AND
DISCUSS REQUIREMENTS OF EACH DEPARTMENT.
L. ALL ICRA REQUIREMENTS TO BE VERIFIED WITH VA COR AND INFECTION
CONTROL PERSONNEL PRIOR TO BEGINNING WORK. ADJUSTMENTS TO THE
ICRA REQUIREMENTS LISTED IN THESE DOCUMENTS SHALL BE MADE
ACCORDING TO INFECTION CONTROL PERSONNEL DIRECTION.
M. CONTRACTOR WILL BE RESPONSIBLE TO SETUP ALL PROJECT MEETINGS
USING THE MICROSOFT TEAMS OR AN EQUIVALENT APPLICATION.
DISCIPLINE CALL OUT
(GENERAL, ARCH, MP - MECHANCIAL AND PLUMBING,
ET - ELECTRICAL AND TECHNOLOGY, ETC.)
SHEET NO. EXAMPLE ## A 001
SHEET NUMBER
BUILDING NUMBER REFERENCE CALL OUT
(1, 5, 6, 19, 22)
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER
CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE
NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• ANSI/TIA
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE
DESIGN STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY
(ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL
STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING
(MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
OF THE SPECIFICATIONS.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW
OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS
APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY
THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
BLDG BUILDING
CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
COR CONTRACTING
OFFICER
REPRESENTATIVE
DEMO DEMOLITION
DET/DTL DETAIL
DIM DIMENSION
DWG(S) DRAWING(S)
FEC FIRE EXTINGUISHER
CABINET
FIN FINISH
FLR FLOOR
FT FOOT/FEET
GC GENERAL CONTRACTOR
GA GAUGE
GEN GENERAL
GYP GYPSUM
IN INCH
INSUL INSULATION
INT INTERIOR
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
RM ROOM
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
TYP TYPICAL
UNO UNLESS NOTED
OTHERWISE
VA VETERAN AFFAIRS
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
CL
262 FEET (80 METERS)262 FEET (80 METERS)
F
E E
T
M
E T
E R
S
F
E E
T
M
E T
E R
S
TELECOMMUNICATIONS
ROOM
MAXIMUM COVERAGE AREA
PER TELECOMMUNICATION
ROOM
VA ALEXANDRIA HEALTH CARE SYSTEM
2495 SHERVEPORT HWY, 71N
PINEVILLE, LA 71360
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-002
GENERAL INFORMATION
2 86MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
WVS
CODE STANDARDS AND EXECUTIVE ORDERS
GENERAL SYMBOL LEGEND
TELECOMMUNICATION
ROOM COVERAGE LEGEND
PROJECT LOCATION MAP PROJECT SITE MAP
PROJECT IMAGE
W
AL
T115
T117
T120
8A
JACIE DRIVE
WAREHOUSE DRIVE
VETERANS LOOP
VETERANS LOOP
WELLNESS LANE
NORTH ENTRANCE
OAK VIEW DRIVEW
VETERANS LOOP
OAK VIEW DRIVEW
VETERANS LOOP
CHAPEL DRIVE
H
SCENIC VIEW ROAD
SCENIC VIEW ROAD
SCENIC VIEW ROAD
E85 LANE
VETERANS LOOP
CHILLER DRIVE
BUILDING NOT IN SCOPE
BUILDING IN SCOPE
LEGEND
GENERAL PARKING AREA
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-003
CAMPUS MAP
3 86MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
WVS
Scale: No Scale
CAMPUS MAP
N O
R T H
W
AL
TELECOM OR OTHER
FUNCTIONAL ROOM
CORRIDOR
NON-RATED TEMPORARY
BARRIER
TEMPORARY DOOR
NEW DOOR
NEW ROUGH OPENING
M
IN
C
L R
STICKY MATS
TELECOM OR OTHER
FUNCTIONAL ROOM
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
NEW DOOR AT CORRIDOR EXISTING DOOR TO REMAIN
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
CORRIDOR
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
NEW DOOR
NEW ROUGH OPENING
STICKY MATS
NEW WALLS
M
IN
C
L R
TELECOM OR OTHER
FUNCTIONAL ROOM
CORRIDOR
NON-RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
REMOVE EXISTING DOOR
AND FRAME
INFILL ROUGH OPENING
AS NEEDED
M
IN
C
L R
STICKY MATS
EXISTING DOOR AND FRAME TO BE
REMOVED
NEW DOOR AND ROOM AT
CORRIDOR
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
CORRIDOR
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
NEW DOOR
NEW ROUGH OPENING
STICKY MATS
DEMO EXISTING WALLS
M
IN
C
L R
NEW DOOR AND ROOM AT
CORRIDOR
NEW FLOOR FINISH
DEMO FLOOR FINISHES
NEW TELECOM ROOM IN OPEN
SPACE
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
STICKY MATS
REMOVE EXISTING
EQUIPMENT
TELECOM OR OTHER
FUNCTIONAL ROOM
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
EXISTING DOOR TO REMAIN
TELECOM OR OTHER
FUNCTIONAL ROOM
DEMO EXISTING WALLS
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
CORRIDOR
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
NEW DOOR
NEW ROUGH OPENING
STICKY MATS
M
IN
C
L R
NEW DOOR AND ROOM AT
CORRIDOR
EXISTING ROOM
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
STICKY MATS
NEW DOOR AND WALL AT EXISTING
ROOM
EXISTING
NEW DOOR
NEW WALL
EXISTING ROOM
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
REMOVE EXISTING DOOR
AND FRAME
INFILL ROUGH OPENING
AS NEEDED
STICKY MATS
NEW TELECOM AT STORAGE ROOM
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
EXISTING ROOM
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
TEMPORARY BARRIER
45-MIN RATED
TEMPORARY DOOR
STICKY MATS
REMOVE EXISTING
EQUIPMENT
NEW TELECOM AT OPEN SPACE
NEW TELECOM OR
OTHER FUNCTIONAL
ROOM
VACANT LARGE
SPACE
STICKY MATS
1-HR RATED TEMPORARY
BARRIER
45-MIN RATED
TEMPORARY DOOR
STICKY MATS
NEW DOOR
NEW WALL
NEW TELECOM AT NURSE STATION
PLASTIC SHEET ICRA BARRIER
ZIPPER DOOR
NEW DATA RECEPTACLE
STICKY MAT
INDIVIDUAL RECEPTACLE
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
ABOVE CEILING WORK IN CORRIDOR
CABLE TRAY WORK
ABOVE
STICKY MATS
PLASTIC SHEET
ICRA BARRIER
ZIPPER DOOR
EXISTING WALL
NURSE STATION OR
OPEN WORK AREA
NEW DATA
RECEPTACLE
EXISTING WALL
EXISTING CASEWORK
20'-0" MAX
C L E
A R
M
IN
OPEN OFFICE AREA
DUST CONTROL PLAN NOTES
1. PROVIDE STICKY MATS AT THE PLASTIC BARRIERS AND CHANGE DAILY
OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND
DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND
DEBRIS CONTROL
2. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS AS POSSIBLE.
3. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED
TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT. A CLEAN CART SHALL BE
USED TO BRING IN ALL MATERIAL. A NOT-SO-CLEAN CART SHALL BE
USED TO REMOVE ALL MATERIAL FROM THE CONSTRUCTION AREA.
5. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC
ROUTES.EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS
WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED
BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE,
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR
MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE
SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA.
THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
6. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
7. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH
CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
8. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED
OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR
PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
9. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND
WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF
THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO
REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE,
PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800
CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE
OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A
RE-CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL
BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE
DUCTS. CONTINUOUS MONITORING FOR NEGATIVE AIR IS REQUIRED.
10. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
11. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS
NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY
THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS
12. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM
SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING
THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE
CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA.
ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED
THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND
MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL
FROM THE CONSTRUCTION ZONE OR WORK AREA.
13. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONSTRUCTION SITE HAS BEEN CLEANED.
ICRA NOTES
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF
EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
FIRE RESISTANT
SEALANT, BOTH SIDES
FIRE RESISTANT
SEALANT, BOTH SIDES
FIRE RESISTANT
SEALANT, BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-004
TYPICAL ICRA CONDITIONS AND
DETAILS
4 86MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
WVS
Scale: 1/4" = 1'-0"
TYPICAL ICRA CONDITIONS
A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
B. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. VERIFY ALL FIELD CONDITIONS.
C. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
D. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
E. EXISTING WINDOWS THAT NEED TO BE TEMPORARILY
REMOVED TO ACCOMMODATE DISCHARGED AIR
EXHAUST DUCT, SHALL BE REINSTALLED AFTER
CONSTRUCTION.
F. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE VA ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
G. CONTRACTOR SHALL VISIT ALL AREAS OF WORK,
INCLUDING WALKING THE SITE, MEASURING EXISTING
DIMENSIONS AND OBSERVING EXISTING CONDITIONS
BEFORE BEGINNING WORK ORDERING MATERIALS,
OR STARTING ANY CONSTRUCTION. CONTRACTOR
TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE
CONDITION PRIOR TO START OF WORK AND
ORDERING OF MATERIALS.
H. CONTRACTOR SHALL RECYCLE REMOVED
MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1
SPECIFICATIONS.
I. CONTRACTOR TO PROTECT AREA ADJACENT TO THE
DEMOLITION AND NEW CONSTRUCTION WORK TO
PREVENT DAMAGES. IF DAMAGED, REPAIR, PATCH,
REPLACE, OR SAND SMOOTH AND TO MATCH
EXISTING ADJACENT MATERIALS. REPORT ANY AND
ALL DAMAGES TO COR.
J. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY
WHEN DISCREPANCIES TO THE DRAWINGS ARE
FOUND IN THE FIELD.
K. CONTRACTOR TO INSTALL TEMPORARY DIGITAL
MANOMETER TO MONITOR AND ENSURE PRESSURE
LEVEL TO MEET VA GUIDELINE WITHIN
CONSTRUCTION AREA. WITH VA COR PRIOR TO
INSTALLATION.
L. PROTECT AND COVER HVAC DIFFUSERS WITHIN
ROOMS DURING CONSTRUCTION.
M. CONTRACTOR SHALL COVER ALL FURNITURE WITHIN
ROOM WITH PLASTIC, PRIOR TO COMMENCING WORK
IN A SPACE AND REMOVE PRIOR TO POST-
CONSTRUCTION TERMINAL CLEANING.
N. TEMPORARY BARRIERS SHALL BE INSPECTED BY VA
LIFE SAFETY AND ICRA STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN CONSTRUCTION SPACE.
O. DOORS TO CORRIDORS FROM OCCUPIED ROOMS
SHALL NOT BE BLOCKED DURING SHIFTS.
P. IF ABOVE CEILING WORK WILL BLOCK ENTIRE
CORRIDOR (SUCH AS IN A 5'-0" WIDE NON-ACUTE
CORRIDOR), WORK MUST OCCUR OUTSIDE NORMAL
OPERATING HOURS FOR THAT AREA.
Q. USE OF MODULAR ICRA BARRIERS IN LIEU OF
CONSTRUCTED BARRIERS MUST BE SUBMITTED FOR
COR APPROVAL PRIOR TO USE. MODULAR SYSTEMS
MUST PROVIDE THE SAME INFECTION CONTROL AND
FIRE RATING REQUIRED.
R. USE OF MOBILE CONTAINMENT (ICRA) CART IS
ACCEPTABLE FOR ABOVE CEILING WORK THAT CAN
BE LIMITED TO THE CONTAINMENT OF THE CART.
S. TEMPORARY BARRIER SHALL BE INSTALLED FOR
EACH OF THE ROOMS OR CONSTRUCTION AREAS AS
IDENTIFIED WITHIN THE SCOPE OF WORK OF THE
CONTRACT DOCUMENTS.
T. PLASTIC SHEET BARRIERS MAY NOT BE REUSED.
CONTRACTOR SHALL TAKE CARE TO CONTAIN ANY
DUST ON PLASTIC SHEET BARRIERS DURING
REMOVAL AND DISPOSAL.
U. CONSTRUCTED AND/OR MODULAR ICRA BARRIERS
SHALL BE WIPED CLEAN BEFORE REMOVAL TO AVOID
SPREADING DUST.
V. NO MORE THAN 1 CEILING TILE PER 50 SQ.FT. SHALL
BE REMOVED WITHOUT PROPER ICRA AND LIFE
SAFETY MEASURES IN PLACE.
W
AL
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:1
A
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\M S
-3
E
H R
M ls ta rn e s C
B U
M B
.r v t
G-005
CONTRACTOR WORK PROCEDURES
5 86MEL
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 24, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
WVS
3. COORDINATE WITH DIRECTOR OF PHARMACY PRIOR TO ANY ACTIVITY. PHARMACIST MUST BE ON SITE FOR ANY ACTIVITY.
2. NO MORE THAN 1 OPERATING ROOM SHALL BE DOWN AT ANY TIME. WORK SHALL BE COMPLETED WITHIN ONE WORK RESTRICTED NIGHT SHIFT, LEAVING THE SPACE BROOM SWEPT AND READY FOR A VA TERMINAL
CLEAN BY 5:00 AM.
1. NO MORE THAN 4 INPATIENT BEDS WILL BE DOWN AT ONE TIME, UNLESS COORDINATED BY THE COR BASED ON PATIENT CENSUS.
NOTES:
OUTPATIENT CLINICS HIGH X X X X X X X
SLEEP LAB HIGH X X X X X X X X
RETAIL SPACE MEDIUM X X X X
RADIOLOGY / IMAGING HIGH X X X X
MORGUE HIGH X X X X
PHYSICAL THERAPY HIGH X X X X X X
PHARMACY HIGHEST X X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3
INPATIENT MENTAL HEALTH HIGH X X X X
INPATIENT NURSING UNIT HIGH X X X X NOTE 1 X X X X NOTE 1 X X NOTE 1 X X X X X NOTE 1
ENDOSCOPY HIGHEST X X X X
MEDICAL RECORDS LOW X X X X
LOGISTICS MEDIUM X X X X
LAB / MICROBIOLOGY HIGH X X X X X X X
INFORMATION TECHNOLOGY LOW X X X X
ICU / CRITICAL CARE HIGHEST X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1
ONCOLOGY / HEMATOLOGY HIGHEST X X X X
SURGERY HIGHEST X X X X X NOTE 2 X X X X X X NOTE 2 X X X X X X X NOTE 2 X X X X X X NOTE 2
DIALYSIS HIGHEST X X X X X
SPECIALTY CLINICS HIGH X X X X X X X
FACILITIES LOW X X X X
ENGINEERING LOW X X X X
EMS MEDIUM X X X X
EMERGENCY DEPARTMENT HIGH X X X X X NOTE 1 X X X X X NOTE 1 X X X X X X X NOTE 1 X X X X X X NOTE 1
EDUCATION LOW X X X X
CANTEEN MEDIUM X X X X X X
DIETARY / FOOD SERVICE MEDIUM X X X X
COMMON AREA LOW X X X X
STERILE PROCESSING HIGHEST X X X X X X X X X X X X X
INTERVENTIONAL CARDIOLOGY HIGHEST X X X X X X X
BIO - MED MEDIUM X X X X X X
ANESTHESIOLOGY HIGH X X X X X
ADMINISTRATION LOW X X X X X
DEPARTMENTS
R
IS
K G
R O
U P
B U
S
IN
E S
S H
O U
R S
(7 :3
A
M
:3
P
M
N
IG
H T
H O
U R
S (5
:3 P
M
:3
A
M
R E
S T
R
IC
T E
D N
IG
H
T H
O U
R S
P
M
A
M
W E
E K
E E
N D
O N
L Y
(F R
ID
A
Y
:3 P
M
M O
N D
A Y
:0
A
M
W E
E K
E N
D O
N L
Y N
IG
H
T H
O U
R S
F
R I, S
A T
S
U N
:3
P
M
:3
A
M
A D
V A
N C
E D
N O
T
IC
E
D O
W N
T
IM
E S
C H
E D
U L
E
S
IN
G L
E M
U L
T
IP
L E
R O
O M
S
N O
IS
E
R E
S T
R
IC
T
IO
N
V A
A P
P R
O V
A L
B U
S
IN
E S
S H
O U
R S
(7 :3 a m
:3 p m
N
IG
H T
H O
U R
S (5
:3 P
M
:3
A
M
R E
S T
R
IC
T E
D N
IG
H
T H
O U
R S
P
M
A
M
W E
E K
E E
N D
O N
L Y
(F R
ID
A
Y
:3 P
M
M O
N D
A Y
:0
A
M
W K
E N
D O
N L
Y N
IG
H
T H
O U
R S
(F R
I, S
A T
S
U N
:3
P
M
:3
A
M
A D
V A
N C
E D
N O
T
IC
E
D O
W N
T
IM
E
S
C H
E D
U L
E
S
IN
G L
E M
U L
T
IP
L E
R O
O M
S
N O
IS
E
R E
S T
R
IC
T
IO
N
V A
A P
P R
O V
A L
B U
S
IN
E S
S H
O U
R S
(7 :3 a m
:3 p m
N
IG
H T
H O
U R
S (5
:3 P
M
:3
A
M
R E
S T
R
IC
T E
D N
IG
H
T H
O U
R S
P
M
A
M
W E
E K
E E
N D
O N
L Y
F
R
ID
A Y
:3
P
M
M O
N D
A Y
:0
A
M
W E
E K
E N
D O
N L
Y N
IG
H
T H
O U
R S
(F R
I, S
A T
S
U N
:3
P
M
:3
A
M
A D
V A
N C
E D
N O
T
IC
E
D O
W N
T
IM
E S
C H
E D
U L
E
S
IN
G L
E
M U
L T
IP
L
E R
O O
M S
N O
IS
E
R E
S T
R
IC
T
IO
N
V A
A P
P R
O V
A L
B U
S
IN
E S
S H
O U
R S
(7 :3 a m
:3 p m
N
IG
H T
H O
U R
S (5
:3 P
M
:3
A
M
R E
S T
R
IC
T E
D N
IG
H
T H
O U
R S
P
M
A
M
W E
E K
E E
N D
O N
L Y
(F R
ID
A
Y
:3 P
M
M O
N D
A Y
:0
A
M
W E
E K
E N
D O
N L
Y N
IG
H
T H
O U
R S
F
R I, S
A T
S
U N
:3
P
M
:3
A
M
A D
V A
N C
E N
O T
IC
E
D O
W N
T
IM
E S
C H
E D
U L
E
S
IN
G L
E
M U
L T
IP
L
E R
O O
M S
N O
IS
E
R E
S T
R
IC
T
IO
N
V A
A P
P R
O V
A L
WORKING HOURS SHUTDOWN CRITERIA REMARKS WORKING HOURS SHUTDOWN CRITERIA REMARKS WORKING HOURS SHUTDOWN CRITERIA REMARKS WORKING HOURS SHUTDOWN CRITERIA REMARKS
TYPE A TYPE C TYPE C TYPE D
W
AL
3 4 5 6
8A
2A
3A
3B
13 14
EXISTING CCTV RACK
EXISTING CCTV RACKEXISTING IT EQUIPMENT
EXISTING IT EQUIPMENT
SEE SITE PLAN FOR CIRCUIT 'A'
4 5
SEE TABLE "CABLE TRAY CAPACITY
PLANNING" ON SHEET ET501. CABLE
TRAY DEPTH TO BE 4".
PROPOSED
TELECOM ROOM
A. CONTRACTOR IS RESPONSIBLE FOR TAKING
NEW DATA DROPS TO DESIGNATED ROOMS
ACCORDING TO SCHEDULE. REFER TO
SPECIFICATION SECTION 271510, APPENDIX 1,
FOR DATA DROP SCHEDULE. PLAN IS
INTENDED FOR ROUTING AND DISTANCES.
B. SEE ET DRAWINGS FOR MORE INFORMATION
ON THE FIBER REQUIREMENTS.
C. CONTRACTOR SHALL DETERMINE EXACT
ROUTING IN FIELD.
D. ALL EXISTING CONDITIONS, CONDUIT, AND
DEVICES ARE BASED ON BEST AVAILABLE
INFOMATION AT TIME OF ENGINEERING
SURVEY AND VISUAL INSPECTION. VERIFY
EXISTING CONDITIONS.
E. DEVICES WITH LIGHT/GREY LINES ARE
EXISTING TO REMAIN.
F. REPAIR/REPLACE CEILING TILES DAMAGED
DURING CONSTRUCTION AT NO EXTRA COST
TO THE GOVERNMENT.
G. ALL FIBER SHALL BE LABELED EVERY 20 FEET
WITH ‘CKT A’ OR ‘CKT B’ AND TELECOM ROOM
NUMBER. SEE FIBER CABEL LABELING
SCHEME DETAIL.
H. PROVIDE J-HOOKS AND/OR CONDUITS IN
LOCATIONS WHERE NEW CABLE TRAY ROUTE
AND SIZE ISN’T VIABLE. NEW J-HOOKS
AND/OR CONDUIT TO COMPLETE/SUPPORT
CABLE ROUTING BACK TO TELECOM ROOM
WITH PROPOSED CONNECTED RACK. SEE J-
HOOK SPACING REQUIREMENTS DETAIL.
I. THIS SHEET SPECIFIES OVERALL WORK
RELATED TO ELECTRICAL AND TECHNOLOGY
ROUTING, FIRE PENETRATIONS AND
ARCHITECTURAL SHEETS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR
ENSURING APPLICABLE DISCIPLINES COVER
WORK ASSOCIATED WITH THESE SHEETS.
J. PROVIDE FIRE/SMOKE RATED FIRE SLEEVE
ASSEMBLIES (RATED AT 2 HOURS). SEAL
FLOOR OPENING AFTER FIBER IS INSTALLED
AND TESTED.
K. FIRE STOP AND SMOKE STOP ALL NEW AND
RE-USED PENETRATIONS THROUGH RATED
PARTITIONS.
L. ALL FLOOR PENETRATION TO BE ASSUMED 2
HOUR RATED.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\E T
-3
V A
A le x a n d ri a E
H R
M
B ld g ls ta rn e s C
B U
M B
.r v t
001.G-101
BUILDING 1, BASEMENT OVERALL PLAN
6 86LAS
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 20, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
KTK
Scale: 3/16" = 1'-0"
BUILDING 1, BASEMENT OVERALL PLAN
N O
R T H0 42 8
CABLE TRAY LEGEND
1 PROPOSED ROUTING OF FIBER. CONTRACTOR TO
VERIFY ROUTING. FIBER IS TO BE RAN INSIDE OF
INNERDUCT AND SUPPORTED EVERY 5'-0" WITH
J-HOOKS.
2 EXISTING OI&T CLOSET, ONCE ALL DATA CABLING
SERVICED OUT OF THIS CLOSET IS REPLACED.
CONFIRM WITH OI&T THAT NO ACTIVE DATA
DROPS ARE SERVED OUT OF THE CLOSET. UPON
CONFIRMATION, COORDINATE FOR REMOVAL OF
ALL VA OWNED NETWORK SWITCHES. REMOVE
PATCH PANELS AND ALL ASSOCIATED CABLING
SERVED FROM DEMOLISHED CLOSET. BID
DEMOLITION AND DISPOSAL OF IT RACK AND ANY
NON-DATA COMPONENTS THAT ARE HOUSED IN
THE RACK. LEAVE THE RACK IN PLACE WITH UPS
POWER.
3 INSTALL NEW PATCH PANEL AT OLD IT CLOSET
AND NEW CLOSET. PROVIDE AND INSTALL PATCH
CABLING FOR ALL SPECIAL SYSTEMS CONTAINED
IN THE CLOSET.
4 PROVIDE (4) 4” FIRE/SMOKE SLEEVE ASSEMBLY (2
HOUR) FOR THE FIBER OPTIC RISER FOR
CIRCUITS A & B. SEE BUILDING FIBER RISER
DIAGRAM FOR MORE INFORMATION. COORDINATE
ALL WORK.
5 PROVIDE (4) 4" CONDUIT STUBS FROM HAND HOLE
TO 6" INSIDE BUILDING.
6 PROVIDE HAND HOLE WITHIN 5' OF BUILDING
EXTERIOR WALL. REFERENCE HAND HOLE DETAIL
ON TELECOMMUNICATIONS HANDHOLE DETAIL
FOR MORE INFORMATION.
7 SEE CIVIL DRAWING(S) FOR CONTINUATION.
8 PROVIDE (2) 4" CORE DRILL OPENINGS WITH UL
APPROVED FIRE/SMOKE SLEEVE ASSEMBLIES (2
HOUR) FOR THE FIBER OPTIC RISER FOR
CIRCUITS A & B. SEE BUILDING FIBER RISER
DIAGRAM FOR MORE INFORMATION. COORDINATE
ALL WORK.
9 PROVIDE (2) 4" CORE DRILL OPENINGS WITH UL
APPROVED FIRE/SMOKE SLEEVE ASSEMBLIES (2
HOUR) FOR THE FIBER OPTIC RISER FOR CAT 6A
CABLES. COORDINATE ALL WORK.
10 PROPOSED PATHWAY ROUTES. SURVEY AND SITE
OBSERVATION SHOWS A LIMITED CLEARANCE
ABOVE THE CEILING IN THESE AREAS. PROVIDE
J-HOOKS AS REQUIRED TO SUPPORT ALL
CABLING. CONTRACTOR TO VERIFY EXISTING
CONDITIONS.
11 PROVIDE (4) 4" CONDUITS FROM HAND HOLE TO
BUILDING.
Docusign Envelope ID: 31EDC0F6-5827-45E5-8E99-758108BAC466
3/23/2026 3/23/2026
Date
MARCH 24, 2026
GFI
WP
E E
LOBBY
NURSING
CONFERENCE
ROOM
UNIT
SUPERVISOR
SECRETARY
NURSING
EXECUTIVE
120A
PROGRAM
ASSISTANT
120B
NURSING
ADMIN.
AREA
TIME
KEEPER
119B
EQUIPMENT
ROOM
119A
ASSOC.
CHIEF
NURSE
ADMINISTRATIVE
ASSISTANT
STORAGE
MALE
FEMALE
HRM
MANAGER
SECRETARY
AAC
HRM
ADMINISTRATION
AREA
CLERK
109A
CLERK
109B
CLERK
CLERK
PMS
PMS
PANEL 'N115'
PANEL 'E11'
001.ET401
001.MP401
001.A-401
LIMIT OF COVERAGE FOR TR 103
PANEL 'N11N'
01-1-CU-1 01-1-CU-2
8 8
TR
'B'-4
'A'-8,10 'A'-8,10
SEE TABLE "CABLE TRAY CAPACITY
PLANNING" ON SHEET ET501. CABLE
TRAY DEPTH TO BE 4".
PROPOSED
TELECOM ROOM
A. CONTRACTOR IS RESPONSIBLE FOR TAKING
NEW DATA DROPS TO DESIGNATED ROOMS
ACCORDING TO SCHEDULE. REFER TO
SPECIFICATION SECTION 271510, APPENDIX 1,
FOR DATA DROP SCHEDULE. PLAN IS
INTENDED FOR ROUTING AND DISTANCES.
B. SEE ET DRAWINGS FOR MORE INFORMATION
ON THE FIBER REQUIREMENTS.
C. CONTRACTOR SHALL DETERMINE EXACT
ROUTING IN FIELD.
D. ALL EXISTING CONDITIONS, CONDUIT, AND
DEVICES ARE BASED ON BEST AVAILABLE
INFOMATION AT TIME OF ENGINEERING
SURVEY AND VISUAL INSPECTION. VERIFY
EXISTING CONDITIONS.
E. DEVICES WITH LIGHT/GREY LINES ARE
EXISTING TO REMAIN.
F. REPAIR/REPLACE CEILING TILES DAMAGED
DURING CONSTRUCTION AT NO EXTRA COST
TO THE GOVERNMENT.
G. ALL FIBER SHALL BE LABELED EVERY 20 FEET
WITH ‘CKT A’ OR ‘CKT B’ AND TELECOM ROOM
NUMBER. SEE FIBER CABEL LABELING
SCHEME DETAIL.
H. PROVIDE J-HOOKS AND/OR CONDUITS IN
LOCATIONS WHERE NEW CABLE TRAY ROUTE
AND SIZE ISN’T VIABLE. NEW J-HOOKS
AND/OR CONDUIT TO COMPLETE/SUPPORT
CABLE ROUTING BACK TO TELECOM ROOM
WITH PROPOSED CONNECTED RACK. SEE J-
HOOK SPACING REQUIREMENTS DETAIL.
I. THIS SHEET SPECIFIES OVERALL WORK
RELATED TO ELECTRICAL AND TECHNOLOGY
ROUTING, FIRE PENETRATIONS AND
ARCHITECTURAL SHEETS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR
ENSURING APPLICABLE DISCIPLINES COVER
WORK ASSOCIATED WITH THESE SHEETS.
J. PROVIDE FIRE/SMOKE RATED FIRE SLEEVE
ASSEMBLIES (RATED AT 2 HOURS). SEAL
FLOOR OPENING AFTER FIBER IS INSTALLED
AND TESTED.
K. FIRE STOP AND SMOKE STOP ALL NEW AND
RE-USED PENETRATIONS THROUGH RATED
PARTITIONS.
L. ALL FLOOR PENETRATION TO BE ASSUMED 2
HOUR RATED.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\E T
-3
V A
A le x a n d ri a E
H R
M
B ld g ls ta rn e s C
B U
M B
.r v t
001.G-111
BUILDING 1, FIRST FLOOR OVERALL
PLAN
7 86LAS
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 20, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
KTK
Scale: 3/16" = 1'-0"
BUILDING 1, FIRST FLOOR OVERALL PLAN
N O
R T H0 42 8
CABLE TRAY LEGEND
11 PROVIDE (2) 4" CORE DRILL OPENINGS WITH UL
APPROVED FIRE/SMOKE SLEEVE ASSEMBLIES (2
HOUR) FOR THE FIBER OPTIC RISER FOR CAT 6A
CABLES. COORDINATE ALL WORK.
12 FIBER CABLING CONTINUES INTO CONNECTING
CORRIDOR TO NEXT BUILDING. CONTRACTOR TO
VERIFY ROUTING. FIBER IS TO BE RAN INSIDE OF
INNERDUCT AND SUPPORTED EVERY 5'-0" WITH
J-HOOKS.
1 EXISTING FIRE ALARM ANNUNCIATOR PANEL
(EDWARDS E5 T3).
2 EXISTING OI&T CLOSET, ONCE ALL DATA CABLING
SERVICED OUT OF THIS CLOSET IS REPLACED.
CONFIRM WITH OI&T THAT NO ACTIVE DATA
DROPS ARE SERVED OUT OF THE CLOSET. UPON
CONFIRMATION, COORDINATE FOR REMOVAL OF
ALL VA OWNED NETWORK SWITCHES. REMOVE
PATCH PANELS AND ALL ASSOCIATED CABLING
SERVED FROM DEMOLISHED CLOSET. BID
DEMOLITION AND DISPOSAL OF IT RACK AND ANY
NON-DATA COMPONENTS THAT ARE HOUSED IN
THE RACK. LEAVE THE RACK IN PLACE WITH UPS
POWER.
3 INSTALL NEW PATCH PANEL AT OLD IT CLOSET
AND NEW CLOSET. PROVIDE AND INSTALL PATCH
CABLING FOR ALL SPECIAL SYSTEMS CONTAINED
IN THE CLOSET.
4 PROVIDE (2) 4" CORE DRILL OPENINGS WITH UL
APPROVED FIRE/SMOKE SLEEVE ASSEMBLIES (2
HOUR) FOR THE FIBER OPTIC RISER FOR
CIRCUITS A & B. SEE BUILDING 1 FIBER RISER
DIAGRAM FOR MORE INFORMATION. COORDINATE
ALL WORK.
5 CABLES AND/OR CABLE TRAY CANNOT RUN
ABOVE CEILING IN THIS AREA.
6 PROPOSED PATHWAY ROUTES. SURVEY AND SITE
OBSERVATION SHOWS A LIMITED CLEARANCE
ABOVE THE CEILING IN THESE AREAS. PROVIDE
J-HOOKS AS REQUIRED TO SUPPORT ALL
CABLING. CONTRACTOR TO VERIFY EXISTING
CONDITIONS.
7 ROUTE CABLES FROM THIS SIDE OF FLOOR
BELOW THEN UP TO NEW TELECOM ROOM ON
THIS FLOOR.
8 PROVIDE NEMA 3R 30A FUSED DISCONNECT AND
CODE REQUIRED WP GFI OUTLET. POWER
CONDENSING UNIT FROM PANEL ‘A’ OF THE TR
THAT IT IS SERVING. USE 2P-20A CIRCUIT
BREAKER.
9 EXISTING GENERAL ELECTRIC NAB 225A, MLO
PANEL ‘E11’ TO SERVE NEW TR ROOM CRITICAL
POWER PANEL IN ROOM TR-103. PROVIDE ONE
60A 3 POLE GE TEB CIRCUIT BREAKER IN SPACE
22, 24, 26 AND CIRCUIT TO PANEL IN TR USING 3-2
AWG, 1-1 AWG NEU, 1-8 AWG EG IN 1-1/2”
CONDUIT.
10 EXISTING GENERAL ELECTRIC NLAB 225A, MLO
PANEL ‘N115’ TO SERVE NEW TR ROOM NORMAL
POWER PANEL IN ROOM TR-103. REMOVE
EXISTING 20A SPARE BREAKERS FROM 14, 16, 18.
PROVIDE ONE 60A 3 POLE GE THQB CIRCUIT
BREAKER IN SPACE 14, 16, 18 AND CIRCUIT TO
PANEL IN TR USING 3-2 AWG, 1-1 AWG NEU, 1-8
AWG EG IN 1-1/2” CONDUIT.
# KEY NOTES:
Docusign Envelope ID: 31EDC0F6-5827-45E5-8E99-758108BAC466
3/23/2026 3/23/2026
DIRECTOR
204E
ADMIN
ASSISTANT
DIRECTOR
OFFICE
204D
NURSE
EXECTUTIVE
SECTRETARY
203A
CONFERENCE
ROOM
CSO
BREAK
ROOM
CSO
OFFICE
AACOS
OFFICE
COS
SECRETARY
OFFICE
COPY
ROOM
213A
CAC
OFFICE
213B
SECRETARY
OFFICE
CHEIF
OF
STAFF
212A
CONFERENCE
ROOM
PUBLIC
AFFAIRS
MALE
TOILET
TOILET
207C
FEMALE
TOILET
207A
EMS
207B
ENTRY
KITCHEN
DIRECTOR'S
ADMIN
SUPPORT
SECRETARY
OFFICE
204B
SECRETARY
OFFICE
204C
ASSOCIATE
DIRECTOR
204F
S T
A
IR
S D
O W
N
S T
A
IR
S U
P
BATHROOM
204G
NURSE
EXECUTIVE
OFFICE
FILE
ROOM
LIMIT OF COVERAGE FOR TR 202
001.ET402
001.MP402
001.A-402
EXISTING
PANEL 'E12'EXISTING
PANEL 'N12'
SEE TABLE "CABLE TRAY CAPACITY
PLANNING" ON SHEET ET501. CABLE
TRAY DEPTH TO BE 4".
PROPOSED
TELECOM ROOM
A. CONTRACTOR IS RESPONSIBLE FOR TAKING
NEW DATA DROPS TO DESIGNATED ROOMS
ACCORDING TO SCHEDULE. REFER TO
SPECIFICATION SECTION 271510, APPENDIX 1,
FOR DATA DROP SCHEDULE. PLAN IS
INTENDED FOR ROUTING AND DISTANCES.
B. SEE ET DRAWINGS FOR MORE INFORMATION
ON THE FIBER REQUIREMENTS.
C. CONTRACTOR SHALL DETERMINE EXACT
ROUTING IN FIELD.
D. ALL EXISTING CONDITIONS, CONDUIT, AND
DEVICES ARE BASED ON BEST AVAILABLE
INFOMATION AT TIME OF ENGINEERING
SURVEY AND VISUAL INSPECTION. VERIFY
EXISTING CONDITIONS.
E. DEVICES WITH LIGHT/GREY LINES ARE
EXISTING TO REMAIN.
F. REPAIR/REPLACE CEILING TILES DAMAGED
DURING CONSTRUCTION AT NO EXTRA COST
TO THE GOVERNMENT.
G. ALL FIBER SHALL BE LABELED EVERY 20 FEET
WITH ‘CKT A’ OR ‘CKT B’ AND TELECOM ROOM
NUMBER. SEE FIBER CABEL LABELING
SCHEME DETAIL.
H. PROVIDE J-HOOKS AND/OR CONDUITS IN
LOCATIONS WHERE NEW CABLE TRAY ROUTE
AND SIZE ISN’T VIABLE. NEW J-HOOKS
AND/OR CONDUIT TO COMPLETE/SUPPORT
CABLE ROUTING BACK TO TELECOM ROOM
WITH PROPOSED CONNECTED RACK. SEE J-
HOOK SPACING REQUIREMENTS DETAIL.
I. THIS SHEET SPECIFIES OVERALL WORK
RELATED TO ELECTRICAL AND TECHNOLOGY
ROUTING, FIRE PENETRATIONS AND
ARCHITECTURAL SHEETS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR
ENSURING APPLICABLE DISCIPLINES COVER
WORK ASSOCIATED WITH THESE SHEETS.
J. PROVIDE FIRE/SMOKE RATED FIRE SLEEVE
ASSEMBLIES (RATED AT 2 HOURS). SEAL
FLOOR OPENING AFTER FIBER IS INSTALLED
AND TESTED.
K. FIRE STOP AND SMOKE STOP ALL NEW AND
RE-USED PENETRATIONS THROUGH RATED
PARTITIONS.
L. ALL FLOOR PENETRATION TO BE ASSUMED 2
HOUR RATED.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \l s ta rn e s \D o c u m e n ts
\E T
-3
V A
A le x a n d ri a E
H R
M
B ld g ls ta rn e s C
B U
M B
.r v t
001.G-121
BUILDING 1, SECOND FLOOR OVERALL
PLAN
8 86LAS
ELECTRONIC HEALTH
RECORD MODERNIZATION
(EHRM)
ALEXANDRIA VA HEALTH CARE SYSTEM
2495 SHREVEPORT HWY, 71N
PINEVILLE, LA 71360
MARCH 20, 2026
100% CONSTRUCTION DOCUMENTS
502-21-22220-398
VARIOUS
KTK
Scale: 3/16" = 1'-0"
BUILDING 1, SECOND FLOOR OVERALL PLAN
N O
R T H0 42 8
CABLE TRAY LEGEND
1 PROPOSED PATHWAY ROUTES. SURVEY AND SITE
OBSERVATION SHOWS A LIMITED CLEARANCE
ABOVE THE CEILING IN THESE AREAS. PROVIDE
J-HOOKS AS REQUIRED TO SUPPORT ALL
CABLING. CONTRACTOR TO VERIFY EXISTING
CONDITIONS.
2 PROVIDE (2) 4" CORE DRILL OPENINGS WITH UL
APPROVED FIRE/SMOKE SLEEVE ASSEMBLIES (2
HOUR) FOR THE FIBER OPTIC RISER FOR
CIRCUITS A & B. BUILDING 1 FIBER RISER
DIAGRAM FOR MORE INFORMATION. COORDINATE
ALL WORK.
3 INSTALL NEW PATCH PANEL AT OLD IT CLOSET
AND NEW CLOSET. TERMINATE AT PATCH PANEL
FOR DESIGNATION.
4 PROVIDE (2) 4” FIRE/SMOKE SLEEVE ASSEMBLY (2
HOUR) FOR THE FIBER OPTIC RISER FOR
CIRCUITS A & B. SEE BUILDING 1 FIBER RISER
DIAGRAM FOR MORE INFORMATION. COORDINATE
ALL WORK.
5 EXISTING GENERAL ELECTRIC NLAB 225A, MLO
PANEL ‘N12’ TO SERVE NEW TR ROOM NORMAL
POWER PANEL IN ROOM TR-202. PROVIDE ONE
60A 3 POLE GE THQB CIRCUIT BREAKER IN PANEL
AND CIRCUIT TO PANEL IN TR USING 3-2 AWG, 1-1
AWG NEU, 1-8 AWG EG IN 1 1/2” CONDUIT.
6 EXISTING GENERAL ELECTRIC NAB 225A, MLO
PANEL ‘E12’ TO SERVE NEW TR ROOM CRITICAL
POWER PANEL IN ROOM TR-202. PROVIDE ONE
60A 3 POLE GE TEB CIRCUIT BREAKER IN PANEL
AND CIRCUIT TO PANEL IN TR USING 3-2 AWG, 1-1
AWG NEU, 1-8 AWG EG IN 1 1/2” CONDUIT.
Docusign Envelope ID: 31EDC0F6-5827-45E5-8E99-758108BAC466
3/23/2026 3/23/2026
NURSING
EDUCATION
EDUCATION
SERVICES
CORRIDOR
LOBBY
LOBBY
101A
DIR.
OFFICE
STAIRS
1SC-2
UNION
OFF.
STORAGE
131A
TLT.
NURSE
CLASSROOM
NURSE
CLASSROOM
DVB
LOCK
DVB
LIN. CL.
ELEC.
CL.
105A
STAIRS
1SS-2
TOILET
H.K CL.
STOR.
117K
BR. RM
117J
ELETR.
117H
OFFICE
117G
CHIEF
PSYCH
117F
SECRE.
117E
WAITING
RM
117D
OFFICE
117C
OFFICE
117B
OFFICE
117A
OFFICE
116A
OFFICE
MALE
TOILET
STORAGE
NURSE
NURSE
EDUC.
NURSE
EDUC.
DIR.
ESHCL
TRASH
MAINT
ONOCOLOGY
FAC.
MAN.
VALEX
STORAGE
STAIRS
1SN-2
MRA
128H
ENTRY
CIRCUL.
DESK
128A
STORAGE
128C
WORK
RM.
128B
RESTROOM
128D
LIBRARY
128E
CON. RM.
128F
CHIEF
128G
WK RM
VALEX
ADMIN.
127A
VAULT
127B
TOILET
126C OFFICE
126D
OFFICE
126E
COOR.
127C
COM.
RM.
126A
CON. RM.
126B
LIMIT OF COVERAGE FOR TR 133
002.ET401
002.MP401
002.A-401
TR
EXISTING
PANEL
'N-2-G-S-1'
EXISTING
PANEL
'N-2-G-S-2'
EXISTING
PANEL 'G/SX' 4
SEE TABLE "CABLE TRAY CAPACITY
PLANNING" ON SHEET ET501. CABLE
TRAY DEPTH TO BE 4".
PROPOSED
TELECOM ROOM
A. CONTRACTOR IS RESPONSIBLE FOR TAKING
NEW DATA DROPS TO DESIGNATED ROOMS
ACCORDING TO SCHEDULE. REFER TO
SPECIFICATION SECTION 271510, APPENDIX 1,
FOR DATA DROP SCHEDULE. PLAN IS
INTENDED FOR ROUTING AND DISTANCES.
B. SEE ET DRAWINGS FOR MORE INFORMATION
ON THE FIBER REQUIREMENTS.
C. CONTRACTOR SHALL DETERMINE EXACT
ROUTING IN FIELD.
D. ALL EXISTING CONDITIONS, CONDUIT, AND
DEVICES ARE BASED ON BEST AVAILABLE
INFOMATION AT TIME OF ENGINEERING
SURVEY AND VISUAL INSPECTION. VERIFY
EXISTING CONDITIONS.
E. DEVICES WITH LIGHT/GREY LINES ARE
EXISTING TO REMAIN.
F. REPAIR/REPLACE CEILING TILES DAMAGED
DURING CONSTRUCTION AT NO EXTRA COST
TO THE GOVERNMENT.
G. ALL FIBER SHALL BE LABELED EVERY 20 FEET
WITH ‘CKT A’ OR ‘CKT B’ AND TELECOM ROOM
NUMBER. SEE FIBER CABEL LABELING
SCHEME DETAIL.
H. PROVIDE J-HOOKS AND/OR CONDUITS IN
LOCATIONS WHERE NEW CABLE TRAY ROUTE
AND SIZE ISN’T VIABLE. NEW J-HOOKS
AND/OR CONDUIT TO COMPLETE/SUPPORT
CABLE ROUTING BACK TO TELECOM ROOM
WITH PROPOSED CONNECTED RACK. SEE J-
HOOK SPACING REQUIREMENTS DETAIL.
I. THIS SHEET SPECIFIES OVERALL WORK
RELATED TO ELECTRICAL AND TECHNOLOGY
ROUTING, FIRE PENETRATIONS AND
ARCHITECTURAL SHEETS. GENERAL
CONTRACTOR IS RESPONSIBLE FOR
ENSURING APPLICABLE DISCIPLINES COVER
WORK ASSOCIATED WITH THESE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .