This is a Technical Questions and Responses Tracking Sheet for federal solicitation 36C77626R0104 regarding the 502-21-222 EHRM Infrastructure Upgrades project in Pineville, LA. The document addresses contractor inquiries and VA responses regarding HVAC system specifications, refrigerant requirements, equipment selections, and installation parameters for the infrastructure upgrade.

Key technical clarifications include: (1) mold present in Building 45 should not be disturbed; contractors must wear appropriate PPE during installation work; (2) directional drilling for duct bank installation at Building 13 shall not exceed six feet below grade; (3) the 225-foot refrigerant piping requirement refers to allowable piping length capability of selected equipment rather than minimum installed line set length, with actual line sets installed per routing requirements and manufacturer limits; (4) the revised basis of design specifies Mitsubishi P-Series R-454B wall-mounted split systems (PKA-AK36NL/PUZ-AK36NL for 3-ton units and PKA-AK24NL/PUZ-AH24NL for 2-ton units) with maximum allowable piping length of 165 feet and maximum height difference of 100 feet; (5) 2-ton units require 2-pole 30A, 208V circuits while 3-ton units require 2-pole 50A, 208V breakers with specified wire gauges and conduit; and (6) for ceiling-suspended applications, one Mitsubishi PCA-AK36NL 3-ton unit with PUY-AK36NL outdoor unit replaces the discontinued Daikin model, powered by a 2-pole 50A, 208V breaker with equivalent electrical specifications.

View the file

Other files

File Type Posted
ME_SUBMITTAL_PKA-AK36NL_PUZ-AK36NL_6PSmo.pdf PDF
Amendment 0007.pdf PDF
ME_SUBMITTAL_PKA-AK24NL_PUZ-AH24NL_XbtyE.pdf PDF
Amendment 0006.pdf PDF
RFI Responses.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Site Visit Sign In Sheet 8-20-26.pdf PDF
Site Visit Agenda.pdf PDF
Amendment 0003.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0002.pdf PDF
Attachment 11 - Site Visit Details.docx DOCX document
Amendment 0001.pdf PDF
Attachment 7 - Key Subcontractor Information.docx DOCX document
Attachment 9 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 4 - Vol 3 Drawings.pdf PDF
Attachment 3 - Volume 2 Drawings.pdf PDF
Attachment 10 - Wage Determination.pdf PDF
Attachment 6 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - Site Visit Details.docx DOCX document
Attachment 8 - Key Personnel.docx DOCX document
Attachment 5 - Vol 4 Drawings.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Attachment 6 - Vol 2 Drawings Part 4.pdf PDF
Attachment 5 - Vol 2 Drawings Part 3.pdf PDF
Attachment 10 - Key Subcontractor Information.docx DOCX document
Attachment 11 - Key Personnel.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Vol 1 Drawings.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 8 - Vol 4 Drawings.pdf PDF
Attachment 7 - Vol 3 Drawings.pdf PDF
Attachment 3 - Vol 2 Drawings.pdf PDF
Attachment 12 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 14 - Site Visit Details.docx DOCX document
Attachment 4 - Vol 2 Drawings Part 2.pdf PDF
36C77626R0104.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND SOLICITATION #: 36C77626R0104

RESPONSES TRACKING SHEET PROJECT TITLE:

502-21-222 EHRM Infrastructure Upgrades

Pineville, LA

# CONTRACTOR QUESTION VA RESPONSE

194 Building 45 is presently out of service, and it is our understanding that this is because of mold concerns within the building. Can you confirm what measures should be taken to address mold under this project?

Assume for bidding purposes that mold will be present but not disturbed over the course of the work. Contractor is required to wear appropriate PPE during installation work.

99 C-304-Note #8-contractor shall bore or tunnel under existing structure to install new duct bank at Bldg #13. We cannot find the profile at Bldg#13.

Contractor shall assume, for bidding purposes, that directional drilling for this run shall be at a depth no greater than six (6) feet below grade.

151 225-Foot Refrigerant Piping Requirement: MP601 states, “Allowable refrigerant piping length shall be a minimum of 225 feet.” Please confirm the intent is that the selected equipment must be capable of an allowable refrigerant piping length of at least 225 feet, and not that each installed line set is required to be a minimum of 225 feet. Also confirm equivalent-length and vertical-lift limitations are to be based on the selected manufacturer's requirements.

As a follow up question, does the basis of design equipment meet this requirement?

Confirmed. The note refers to the allowable refrigerant piping length of the selected equipment; it does not require each installed line set to be a minimum of 225 feet. Line sets shall be installed at the lengths required by the actual routing. Equivalent length, vertical lift (height difference), and number-of-bends limitations shall be per the selected manufacturer's published requirements. The revised basis of design (Mitsubishi P-Series, R-454B) has a maximum allowable piping length of 165 feet and a maximum height difference of 100 feet; installed piping shall not exceed the selected manufacturer's limits.

158 The HVAC units scheduled call for 410 A refrigerant, however this has been phased out and is no longer available. Units with the new 454 refrigerant do not fit the design layout and in all cases require a separate additional power circuit to the indoor units. The design assumed the units would be powered form the outdoor units by a power/com wire. Will the VA please provide an updated selection for these units?

The basis of design is revised to the Mitsubishi P-Series R-454B wall-mounted split systems: PKA-AK36NL indoor / PUZ-AK36NL outdoor (3-ton) and PKA-AK24NL indoor / PUZ-AH24NL outdoor (2-ton).

These indoor units are powered from the outdoor unit through the indoor-outdoor interconnect (S1-S2, 208/230V), so a separate power circuit to the indoor units is not required. 2-ton units remain on the 2-pole 30A, 208V circuits shown on the plans. All 3-ton units shall be a 2-pole 50A, 208V breaker with (3) #8 AWG and (1) #10 AWG equipment ground in 1" conduit.

# CONTRACTOR QUESTION VA RESPONSE

159 Daikin is listed as the basis of design for the mini split units. They have advised that they no longer produce a 3-ton indoor ceiling suspended model. They advised installing two (2) 1 ½ ton wall mount units. Due to the 225 ft line set required, these will also require power at the interior unit. Will the VA please confirm an updated model number or alternate solution for these mini-split units?

Provide one (1) Mitsubishi PCA-AK36NL 3-ton ceiling-suspended indoor unit with PUY-AK36NL outdoor unit in lieu of the Daikin 3-ton ceiling-suspended unit. Two (2) 1-1/2-ton wall-mounted units are not required. Power this unit from a 2-pole 50A, 208V breaker with (3) #8 AWG and (1) #10 AWG equipment ground in 1" conduit.