Attachment 6 - Drawings 3 of 4.pdf

PDF 10 MB Posted

Attached to
Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
Solicitation number
36C77622B0017
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is an attachment to a solicitation for construction services. The solicitation number is 36C77622B0017 and is for Y1DZ--EHRM Training and Admin Space Support Construction located in Milwaukee, Wisconsin. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency. The solicitation seeks construction services to support training and administrative spaces as described in document IFB - 36C77622B0017 - 2-10-22 and related supporting attachments. The response due date and anticipated award date cannot be determined from this attachment alone.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf PDF
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
36C77622B0017 0004.pdf PDF
Drawing Changes 3-23-22.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
Technical Questions - Milwaukee EHRM 3-23-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
Question 74 Porch Detail.pdf PDF
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 3 - Final SOW - 1-27-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

DN

DN

UP

DN

B -W

IN

G

C -W

IN

G

STORAGE

CB49

STAIR

CB4

VESTIBULE

CB50

TRAINING

CB48

TRAINING

CB45

TRAINING

CB46

TRAINING

CB44

TRAINING

CB43

TRAINING

CB41

MECHANICAL

CB42

CORRIDOR

CB40

ELEV.

C2-P

ELEV. LOBBY

CB22

VESTIBULE

CB24

CIRC.

CB17

DHW / UTILITY

CB21

ELEC. ROOM

CB16

STORAGE

CB15

CIRC.

CB23

STORAGE

CB18

WOMENS RR

CB19-A

VESTIBULE

CB22A

4' - 0" 3' - 3"3' - 11 1/4" 4' - 2 1/2"

MENS RR

CB19-B

DK1

CH1

CO1

PS1

A. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE EQUIPMENT,

FURNISHINGS, AND TECHNOLOGY, AND WALL MOUNTED ACCESSORIES AS

REQUIRED. REFER TO ARCHITECTURE SHEETS FOR MORE INFORMATION.

B. COORDINATE ALL EQUIPMENT LOCATIONS AND UTILITIES REQUIREMENTS

WITH EQUIPMENT PLANS, SCHEDULES, AND ENGINEERING DRAWINGS.

C. REFER TO FURNITURE VENDOR DRAWINGS AND DETAILED FURNITURE

SCHEDULE FOR FINAL FURNITURE PLACEMENT.

D. ALL EQUIPMENT AND FURNITURE INDICATED IN THE DRAWINGS ARE DRAWN

TO SCALE FOR TEST FITTING UNLESS OTHERWISE NOTED.

E. FURNITURE AND EQUIPMENT IS FURNISHED BY THE VA AND IS SHOWN FOR

COORDINATION OF UTILITIES AND POSSIBLE LAYOUT ONLY.

EQUIPMENT GENERAL NOTES

A

SOUTH

B D

BUILDING 6 BASEMENT KEY PLAN

N

SHADE INDICATES

AREA NOT IN

SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

C

SOUTH

C

NORTH

A

NORTH

D

BUILDING 6 THIRD FLOOR KEY PLAN

N

HATCH INDICATES

ROOF AREA

BELOW, NIC

NO SHADE

INDICATES

LOCATION OF

PROJECT, TYP

C SOUTH

C

NORTH

(ROOF

ONLY)

SHADE INDICATES

AREA NOT IN

SCOPE, TYP

OFFICE

C304

RECEPTION

C308

OFFICE

C307

OFFICE

C302

STAIR C1

C1

ETR

C303

OPEN OFFICE

C305

STAIR

C306

CORRIDOR

C3A

ELEVATOR C1

C1

RESTROOM

C301-A

UTILITY

C301-B

C -W

IN

G

D -W

IN

G

WS-1

1. INSTALL WHITEBOARD THIS LOCATION. SIZE BY VA OR VA'S VENDOR.

INTERIOR FINISHES PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

C

U s e rs \c s u tt o n \D o c u m e n ts

\1

.1

.2

A v c s u tt o n B

F V

.r v t

/1 /2

:1

:5

P

M

QH100

BASEMENT - C-WING - EQUIPMENT

PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 JF CS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"QH100

2 BASEMENT EQUIPMENT PLAN

N

SCALE: 1/8" = 1'-0"QH100

1 THIRD FLOOR EQUIPMENT PLAN - C-WING

Revisions: Date:

DN

DN

DN

DN

DN

UP

DN

DN

A. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE EQUIPMENT,

FURNISHINGS, AND TECHNOLOGY, AND WALL MOUNTED ACCESSORIES AS

REQUIRED. REFER TO ARCHITECTURE SHEETS FOR MORE INFORMATION.

B. COORDINATE ALL EQUIPMENT LOCATIONS AND UTILITIES REQUIREMENTS

WITH EQUIPMENT PLANS, SCHEDULES, AND ENGINEERING DRAWINGS.

C. REFER TO FURNITURE VENDOR DRAWINGS AND DETAILED FURNITURE

SCHEDULE FOR FINAL FURNITURE PLACEMENT.

D. ALL EQUIPMENT AND FURNITURE INDICATED IN THE DRAWINGS ARE DRAWN

TO SCALE FOR TEST FITTING UNLESS OTHERWISE NOTED.

E. FURNITURE AND EQUIPMENT IS FURNISHED BY THE VA AND IS SHOWN FOR

COORDINATION OF UTILITIES AND POSSIBLE LAYOUT ONLY.

EQUIPMENT GENERAL NOTES

HAC

FILES/SCANNING

A115

STAIR

CORRIDOR

A101

MECHANICAL

A121

BREAKOUT

A122

TRAINING

A124

WOMEN

RESTROOM

ELEVATOR

TRAINING

A118-A

STORAGE

A116-C

CIRC.

A117

CORRIDOR

TRAINING

A118-B

A104

MEN

RESTROOM

VESTIBULE

OIT

SUPPORT

A106

A117

A111

B D

BUILDING 6 FIRST FLOOR KEY PLAN

N

SHADE INDICATES AREA

NOT IN SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

A

SOUTH

C

SOUTH

C

NORTH

A

NORTH

CIRC.

C116

ELEV.

C2-P

ELEV. LOBBY

C120

WAITING

C142

LIGHTWELL

C----

STORAGE

C119-C STAIR C2

C2

MECHANICAL

C126

TRAINING

C106-C

IT ROOM

C118-B

TRAINING

C148

TRAINING

C146

TRAINING

C144

TRAINING

C141

TRAINING

C143

TRAINING

C145

CORRIDOR

C140

B -W

IN

G

C -W

IN

G

C -W

IN

G

D -W

IN

G

WOMENS RR

C119-A BREAK AREA

C118

SECURITY

C118-A

MENS RR

C119-B

WAITING

C124 CONFERENCE ROOM

C124-A

STAIR

C4

CH2

CH3

TB2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

C

U s e rs \c s u tt o n \D o c u m e n ts

\1

.1

.2

A v c s u tt o n B

F V

.r v t

/1 /2

:1

:0

P

M

QH101

FIRST FLOOR- A-WING AND C

WING - EQUIPMENT PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 JF CS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"QH101

1 FIRST FLOOR EQUIPMENT PLAN - A-WING

N

SCALE: 1/8" = 1'-0"QH101

2 FIRST FLOOR EQUIPMENT PLAN - C-WING NORTH

N

17.10

17.11

17.12

17.13

17.14

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 4" FPD UP

(E) 3" FPD

A-WING NORTH

A-WING SOUTH

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER DECK

ROOM

AB05

ROOM

AB04

CORRIDOR

AB13

ELEVATOR

A

ROOM

AB11

ROOM

AB11B

ROOM

AB14

ROOM

AB01

ROOM

AB11A

(E) 6" DRY PIPE VALVE

(E) FIRE DEPARTMENT

CONNECTION

(E) 3" FPD(E) 3" FPD

(E) 3" FPD

(E) 3" FPD (E) 3" FPD

(E) 6" FPD

(E) 3" FPD

(E) 3" FPD

(E) 3" FPD

(E) 2" FPD

(E) 3" FPD

(E) 3" FPD

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER RAMP

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER DECK

(E) FPD PIPING

UNDER DECK

A-WING NORTH

A-WING SOUTH

(E) 6" FPD UP

(E) 6" FPD UP

(E) 4" FPD

4" FP UP

6" FP

(E) UG 8" FP

FX401

(2) 2 1/2" HOSE VALVES FOR

FORWARD FLOW TEST CONNECTION

6" WET PIPE VALVE

6" DOUBLE CHECK BACKFLOW

PREVENTER W/ TAMPER SWITCH

MECHANICAL ROOM

AB07A

ROOM

AB07

ROOM

AB08

ROOM

AB09

ROOM

AB06

STAIR

A1

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

A B C D

BUILDING 6 KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

WHITE SHADE INDICATES

LOCATION OF PROJECT,

TYP

#PLAN NOTES

1. REFER TO SECTION VIEWS ON SHEET FX401 FOR WORK AT FIRE RISER

VALVES.

2. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION

SYSTEM.

LEGEND & ABBREVIATIONS

NEW PIPING

EXISTING PIPING

FIRE PROTECTION (DRY PIPE SYSTEM)

FPD

EXISTING TO REMAIN(E)

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

REVISION NUMBER#

SQUARE FEETSF

QUICK RESPONSEQR

GALLONS PER MINUTEGPM

DOWNDN

FIRE PROTECTION (WET PIPE SYSTEM)

FP

PIPING TO BE REMOVED

POINT OF REMOVAL BETWEEN DEMOLITION

AND EXISTING WORK

OUTSIDE STEM AND YOKEOS&Y

A

A-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

FIRST FLOOR, TYP

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX101

BASEMENT FIRE SUPPRESSION

PLAN - A WING

PP GP

1/8" = 1'-0"

BASEMENT FIRE SUPPRESSION PLAN - A WING NORTH

1/8" = 1'-0"

BASEMENT FIRE SUPPRESSION PLAN - A WING SOUTH

11/12/2021

ELEV.

C2-P

(E) 4" FPD

FP

FP

FP FP

FP UP FP UP

VESTIBULE

CB50

TRAINING

CB45

TRAINING

CB43

TRAINING

CB41

TRAINING

CB48

TRAINING

CB46

TRAINING

CB44

MECHANICAL-1

CB42-1

ELEV. LOBBY

CB22

VESTIBULE

CB24

ELEC. ROOM

CB16

STORAGE

CB15

WOMENS RR-1

CB19-A-1

VESTIBULE-2

CB50-2

STAIR C2-1

C2-1

LIGHT HAZARD

ORDINARY HAZARD GROUP 1

ORDINARY HAZARD GROUP 2

C WING NORTH

C WING SOUTH

STAIR

CB4

STORAGE

CB49

CORRIDOR-1

CB40-1

MECHANICAL-2

CB42-2

VESTIBULE

CB22A

CIRC.

CB23

WOMENS RR-2

CB19-A-2

MENS RR-2

CB19-B-2

STORAGE

CB18

CIRC.-1

CB17-1

CIRC.-2

CB17-2

IT ROOM

CB18-C

CORRIDOR C

CB12

DHW / UTILITY

CB21

FP

FP

FP UP

FP FP

2 2

(E) 4" FPD

(E) 3" FPD UP

(E) 4" FPD

(E) 4" FPD

(E) 2" FPD

(E) 4" DRY

PIPE VALVE

(E) FIRE DEPARTMENT

CONNECTION

C WING NORTH

C WING SOUTH

STAIR C1-1

C1-1

CORRIDOR C

CB12

ELEV. EQUIP.-2

CB11-2

ELEV.

C1-P

RR-MENS

CB06

RR-WOMEN'S

CB10

CIRC.

CB07

FM OFFICE

CB05

CIRC.

CB08

ELECTRICAL CLOSET

CB09

(E) UG 6" FP

FX401

6" DOUBLE CHECK BACKFLOW

PREVENTER W/ TAMPER SWITCH

6" WET PIPE VALVE

FP

4" FP UP

6" FP

FP

(2) 2 1/2" HOSE VALVES FOR

FORWARD FLOW TEST CONNECTION

CORRIDOR C

CB12

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD

ORDINARY HAZARD

GROUP I

ORDINARY HAZARD

GROUP II

0.10 GPM/SF OVER 1500

SF

0.15 GPM/SF OVER 1500

SF

0.20 GPM/SF OVER 1500

SF

100 GPM

250 GPM

250 GPM

30 MIN

60 MIN

90 MIN

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

BASE AREA

BASE AREA

BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

1 SPRINKLER PER 130 SF

1 SPRINKLER PER 130 SF

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

#PLAN NOTES

1. REFER TO SECTION VIEWS ON SHEET FX401 FOR WORK AT FIRE RISER

VALVES.

2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND

ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE

SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN

ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.

3. REMOVE DRY PIPE FIRE SPRINKLER LINE AND ASSOCIATED COMPONENTS

BACK TO POINT SHOWN AND CAP.

4. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION

SYSTEM.

LEGEND & ABBREVIATIONS

NEW PIPING

EXISTING PIPING

FIRE PROTECTION (DRY PIPE SYSTEM)

FPD

EXISTING TO REMAIN(E)

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

REVISION NUMBER#

SQUARE FEETSF

QUICK RESPONSEQR

GALLONS PER MINUTEGPM

DOWNDN

FIRE PROTECTION (WET PIPE SYSTEM)

FP

PIPING TO BE REMOVED

POINT OF REMOVAL BETWEEN DEMOLITION

AND EXISTING WORK

OUTSIDE STEM AND YOKEOS&Y

FIRE HAZARD LEGEND

A B C D

BUILDING 6 KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

WHITE SHADE INDICATES

LOCATION OF PROJECT,

TYP

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX102

BASEMENT FIRE SUPPRESSION

PLAN - C WING

PP GP

1/8" = 1'-0"

BASEMENT FIRE SUPPRESSION PLAN - C WING NORTH

1/8" = 1'-0"

BASEMENT FIRE SUPPRESSION PLAN - C WING SOUTH

DN

17.10

17.11

17.12

17.13

17.14

(E) 4" FPD

(E) 4" FPD DN

(E) 4" FPD

FPD

BREAKOUT

A122

MECHANICAL

A121

TRAINING

A118-B

OIT CLOSET

A104

CORRIDOR-1

A101-1

CORRIDOR

A/B

TRAINING

A124

A WING NORTH

A WING SOUTH

LIGHT HAZARD

ORDINARY HAZARD GROUP 1

ORDINARY HAZARD GROUP 2

CIRC.

A117

STORAGE

A116-C

PORCH

C310

PORCH

C311

4" FP DN

TRAINING

A118-A

FP

FP

FP

FP

FP FP

FP

FP

FP

STAIR

A1

CORRIDOR-2

A101-2

VESTIBULE

A100

(E) 4" FPD

FPD

FPD

FPD

FPD

FPD FPD

MECHANICAL ROOM

A116

ROOM

A117

ROOM

A109

ROOM

A112

SCANNING ROOM

A113

CONFERENCE ROOM

A114

FILES/SCANNING

A115

NON-VA CARE

A108

NON-VA CARE

A108

A WING NORTH

A WING SOUTH

(E) 6" FPD DN

(E) 6" FPD UP & DN

PORCH

C312

PORCH

C312

A

A-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

FIRST FLOOR, TYP

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD

ORDINARY HAZARD

GROUP I

ORDINARY HAZARD

GROUP II

0.10 GPM/SF OVER 1500

SF

0.15 GPM/SF OVER 1500

SF

0.20 GPM/SF OVER 1500

SF

100 GPM

250 GPM

250 GPM

30 MIN

60 MIN

90 MIN

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

BASE AREA

BASE AREA

BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

1 SPRINKLER PER 130 SF

1 SPRINKLER PER 130 SF

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

#PLAN NOTES

1. CONNECT NEW DRY PIPE FIRE SPRINKLER PIPING TO EXISTING AT POINT

SHOWN.

2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND

ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE

SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN

ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.

3. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION

SYSTEM.

LEGEND & ABBREVIATIONS

NEW PIPING

EXISTING PIPING

FIRE PROTECTION (DRY PIPE SYSTEM)

FPD

EXISTING TO REMAIN(E)

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

REVISION NUMBER#

SQUARE FEETSF

QUICK RESPONSEQR

GALLONS PER MINUTEGPM

DOWNDN

FIRE PROTECTION (WET PIPE SYSTEM)

FP

PIPING TO BE REMOVED

POINT OF REMOVAL BETWEEN DEMOLITION

AND EXISTING WORK

OUTSIDE STEM AND YOKEOS&Y

FIRE HAZARD LEGEND

A B C D

BUILDING 6 KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

WHITE SHADE INDICATES

LOCATION OF PROJECT,

TYP

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX103

FIRST FLOOR FIRE SUPPRESSION

PLAN - A WING

PP GP

1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN - A WING NORTH

1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN - A WING SOUTH

FP FP

FP DN FP DN

FP FP

STAIR C2-2

C2-2

LIGHTWELL

C----

CIRC.

C116

MENS RR-1

C119-B-1

WOMENS RR

C119-A

TRAINING

C145

TRAINING

C148

TRAINING

C146

ELEV.-2

C2-P-2

TRAINING

C144

TRAINING

C143

IT ROOM

C118-B

TRAINING

C141

MECHANICAL

C126

C WING NORTH

C WING SOUTH

FP

FP

FP

FP

FP

FP

FP

FP

LIGHT HAZARD

ORDINARY HAZARD GROUP 1

ORDINARY HAZARD GROUP 2

CORRIDOR-1

C140-1

STAIR

C4

CORRIDOR-2

C140-2

WAITING

C142

WAITING

C124

ELEV. LOBBY

C120

SECURITY

C118-A

STORAGE

C119-C

CONFERENCE ROOM

C124-A

ELEV. MACHINE.

C121

BREAK AREA

C118

TRAINING

C106-C

FP DN

FP

FP

FP

FP

(E) 3" FPD UP & DN

(E) 2" FPD

STAIR

C106

CORRIDOR

C115A

STAIR C1-2

C1-2

4" FP UP & DN

FP

C WING NORTH

C WING SOUTH

ROOM

C104

ROOM

C105

ROOM

C108

ROOM

C107

ROOM

C103

ELEV. EQUIP.-1

CB11-1

ROOM

C109

Space

C132

CORRIDOR

C115B

CORRIDOR

B/C

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD

ORDINARY HAZARD

GROUP I

ORDINARY HAZARD

GROUP II

0.10 GPM/SF OVER 1500

SF

0.15 GPM/SF OVER 1500

SF

0.20 GPM/SF OVER 1500

SF

100 GPM

250 GPM

250 GPM

30 MIN

60 MIN

90 MIN

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

BASE AREA

BASE AREA

BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

1 SPRINKLER PER 130 SF

1 SPRINKLER PER 130 SF

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

#PLAN NOTES

1. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND

ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE

SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN

ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.

2. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION

SYSTEM.

LEGEND & ABBREVIATIONS

NEW PIPING

EXISTING PIPING

FIRE PROTECTION (DRY PIPE SYSTEM)

FPD

EXISTING TO REMAIN(E)

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

REVISION NUMBER#

SQUARE FEETSF

QUICK RESPONSEQR

GALLONS PER MINUTEGPM

DOWNDN

FIRE PROTECTION (WET PIPE SYSTEM)

FP

PIPING TO BE REMOVED

POINT OF REMOVAL BETWEEN DEMOLITION

AND EXISTING WORK

OUTSIDE STEM AND YOKEOS&Y

FIRE HAZARD LEGEND

A B C D

BUILDING 6 KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

WHITE SHADE INDICATES

LOCATION OF PROJECT,

TYP

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX104

FIRST FLOOR FIRE SUPPRESSION

PLAN - C WING

PP GP

1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN - C WING NORTH

1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN - C WING SOUTH

(E) 3" FPD DN

(E) 3" FPD

ROOM

C203

ROOM

C204

ROOM

C208

ROOM

C209

ROOM

C207

CORRIDOR

C201A

STAIR

C205

4" FP UP & DN

FP

3" FPD UP

STAIR C1-2

C1-2

CORRIDOR

C201

(E) 1" FPD UP

3" FPD DN

LIGHT HAZARD

ORDINARY HAZARD GROUP 1

(E) 3" FPD UP

(E) 2" FPD

(E) 3" FPD

STAIR C1-2

C1-2

OFFICE

C304

RESTROOM-1

C301-A-1

RESTROOM-2

C301-A-2

UTILITY

C301-B

OFFICE

C302

OFFICE

C307

STAIR

C306

ETR

C303

OPEN OFFICE-2

C305-2

CORRIDOR

C3A

OPEN OFFICE-3

C305-3

ELEVATOR C1

C1

4" FP DN

FP

FP

RECEPTION

C308

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

FIRE SPRINKLER HAZARD SCHEDULE

CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES

LIGHT HAZARD

ORDINARY HAZARD

GROUP I

ORDINARY HAZARD

GROUP II

0.10 GPM/SF OVER 1500

SF

0.15 GPM/SF OVER 1500

SF

0.20 GPM/SF OVER 1500

SF

100 GPM

250 GPM

250 GPM

30 MIN

60 MIN

90 MIN

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

QR; K = 5.6 OR K = 8.0

BASE AREA

BASE AREA

BASE AREA

SPRINKLER DENSITY

1 SPRINKLER PER 225 SF

1 SPRINKLER PER 130 SF

1 SPRINKLER PER 130 SF

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

#PLAN NOTES

1. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION

SYSTEM.

2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND

ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE

SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN

ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.

3. CONNECT NEW DRY PIPE SPRINKLER PIPING TO EXISTING AT POINT SHOWN.

LEGEND & ABBREVIATIONS

NEW PIPING

EXISTING PIPING

FIRE PROTECTION (DRY PIPE SYSTEM)

FPD

EXISTING TO REMAIN(E)

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

EXISTING WORK

PIPE UP

PIPE DOWN

PIPING CONTINUATION

REVISION NUMBER#

SQUARE FEETSF

QUICK RESPONSEQR

GALLONS PER MINUTEGPM

DOWNDN

FIRE PROTECTION (WET PIPE SYSTEM)

FP

PIPING TO BE REMOVED

POINT OF REMOVAL BETWEEN DEMOLITION

AND EXISTING WORK

OUTSIDE STEM AND YOKEOS&Y

FIRE HAZARD LEGEND

A B C D

BUILDING 6 KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

WHITE SHADE INDICATES

LOCATION OF PROJECT,

TYP

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX105

SECOND & THIRD FLOOR FIRE

SUPPRESSION PLANS

PP GP

1/8" = 1'-0"

SECOND FLOOR FIRE SUPPRESSION PLAN - C WING

1/8" = 1'-0"

THIRD FLOOR FIRE SUPPRESSION PLAN - C WING

FIRST FLOOR

100' - 0"

BASEMENT

90' - 0"

6" DOUBLE CHECK BACKFLOW

PREVENTER WITH TAMPER SWITCH

(E) FIRE DEPARTMENT

CONNECTION

(E) 6" DRY PIPE VALVE

(E) 6" FPD TO A-WING

(E) 8" CHECK VALVE

(E) 4" CHECK VALVE

(E) 6" OS&Y VALVE

(2) 2 1/2" HOSE VALVES FOR

FORWARD FLOW TEST CONNECTION

4" FP

4" FP

6" FP

6" FP TO A-WING

FLOW SWITCH RELOCATED

PRESSURE SWITCH

RELOCATED 6"

DRY PIPE VALVE

RELOCATED 6"

OS&Y VALVE

4" CHECK VALVE

6" BUTTERFLY VALVE WITH

TAMPER SWITCH

4" CONTROL VALVE TO

FORWARD FLOW TEST

CONNECTION

6" WET PIPE VALVE WITH

INSPECTORS TEST AND DRAIN

(E) 8" FP

6 7

FIRST FLOOR

100' - 0"

BASEMENT

90' - 0"

(E) FIRE DEPARTMENT

CONNECTION

(E) 6" DRY PIPE VALVE

(E) 6" FPD TO A-WING

(E) 8" FP

(E) 8" CHECK VALVE

(E) 4" CHECK VALVE

(E) 6" OS&Y VALVE

6" DRY PIPE VALVE

(TO BE RELOCATED)

6" OS&Y VALVE (TO

BE RELOCATED)

PRESSURE SWITCH

(TO BE RELOCATED)

FIRST FLOOR

100' - 0"

BASEMENT

90' - 0"

(E) FIRE DEPARTMENT

CONNECTION

(E) 4" DRY PIPE VALVE

(E) 4" FPD TO C-WING

(E) 4" CHECK VALVE

(2) 2 1/2" HOSE VALVES FOR

FORWARD FLOW TEST CONNECTION

6" FP TO C-WING

6" FP

6" FP

4" FP

4" FP

4" CHECK VALVE

(E) PRESSURE SWITCH

(E) 6" FP

6" DOUBLE CHECK BACKFLOW

PREVENTER WITH TAMPER SWITCH

6" BUTTERFLY VALVE WITH

TAMPER SWITCH

6" WET PIPE VALVE WITH

INSPRECTORS TEST AND DRAIN

FLOW SWITCH

4" CONTROL VALVE TO FORWARD

FLOW TEST CONNECTION

GENERAL NOTES

A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED

AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.

B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE

ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY

IMPACT THE PROGRESS OF WORK.

C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND

PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR

DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.

D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS

REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE

INTERFERENCE WITH OTHER CONSTRUCTION.

E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE

DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER

CONTRACTOR.

F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL

OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO

CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND

METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD

CLASSIFICATIONS SHOWN.

G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM

ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.

H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN

PROJECT SCOPE AREA.

I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY

PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.

#PLAN NOTES

1. CUT PIPING TEMPORARILY FOR NEW PIPING CONNECTION.

2. REMOVE PIPING AND COMPONENTS BETWEEN POINTS SHOWN. PIPING TO

BE RECONFIGURED AND DRY PIPE VALVE, OS&Y VALVE, AND PRESSURE

SWITCH TO BE RELOCATED AND RE-USED. REFER TO NEW WORK PIPING

SHOWN ON THIS SHEET.

3. PROVIDE CAP FOR FUTURE CONNECTION.

4. CONNECT NEW DRY PIPE SPRINKLER PIPING TO EXISTING AT POINT SHOWN.

5. CONNECT NEW WET PIPE SPRINKLER PIPING TO EXISTING AT POINT

SHOWN.

6. ONE VALVE REQUIRED FOR EACH 250 GPM DEMAND.

7. LOCATE AS REQUIRED TO MAKE ACCESSIBLE OUTSIDE OF EXTERIOR

GATED AREA.

8. CORE DRILL THROUGH EXTERIOR WALL FOR INSTALLATION OF PIPING.

9. DRAIN TO EXISTING SUMP BASIN.

10. CONNECT DRAIN TO EXISTING DRAIN LINE USED FOR EXISTING DRY PIPE

VALVES.

/2

/2

:4

:4

A

M

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

BID DOCUMENTS

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

BID DOCUMENTS 11/12/2021

Revisions: Date:

FX401

FIRE SUPPRESSION RISER

SECTIONS

PP GP

1/2" = 1'-0"

A-WING RISER SECTION - NEW WORK

1/2" = 1'-0"

A-WING RISER SECTION - DEMOLITION WORK

1/2" = 1'-0"

C-WING RISER SECTION - NEW WORK

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF ECHANICAL ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BFP REDUCED PRESSURE BACKFLOW PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

EX EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK (DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWH KILOWATT-HOUR

PLUMBING ABBREVIATIONS

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM. NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAGE

PTRV PRESSURE TEMPERATURE RELIEF VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR CONDITIONING ONTRACTORS

NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNITS

YCO YARD CLEANOUT

YH YARD HYDRANT

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

VIEW TITLE

NORTH ARROW

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

DRAWING SYMBOLS

XX-X X

EQUIPMENT NUMBER

BUILDING NO. WHERE EQUIPMENT IS LOCATED

EQUIPMENT ABBREVIATION

UNIT NUMBER TAG

FE

CO

GENERAL PLUMBING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45o OR 90o

BOTTOM CONNECTION, 45o OR 90o

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

POINT OF CONNECTION BETWEEN NEW AND EXISTING

WORK

LIMIT OF DEMOLITION

INVERTED BUCKET TRAP SET INCLUDING PIPING

ACCESSORIES

FLOAT & THERMOSTATIC TRAP SET INCLUDING STRAINER

PIPING ACCESSORIES

THERMOMETER

PRESSURE GAGE

FLOW ELEMENT

CLEAN OUT

HOSE BIB

AV

GATE VALVE

GLOBE VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

THREE-WAY TWO POSITION CONTROL VALVE

PRESSURE REGULATING VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE / TEMPERATURE)

AUTOMATIC AIR VENT

PLUMBING VALVE SYMBOLS

A. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL OTHER SYSTEMS. ANY

COST DUE TO LACK OF COORDINATION OF THIS SYSTEM WITH OTHER SYSTEMS WILL BE

THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE AREA TO BECOME

FAMILIAR WITH THE EXISTING CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF

EXISTING UTILITIES PRIOR TO CONSTRUCTION. ROUTE PIPING AND CONNECT AS

REQUIRED.

C. DO NOT ROUTE ANY SYSTEMS OVER EXISTING AND/OR NEW ELECTRICAL AND/OR IT AND

TELECOMMUNCIATIONS ROOMS.

D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS, CEILING, ETC. WHERE

REQUIRED FOR NEW CONSTRUCTION. PATCHING SHALL MATCH EXISTING CONSTRUCTION

& FINISHES. COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT.

E. PROVIDE VALVE TAGS & PLASTIC LAMINATE IDENTIFICATION ON CEILING FOR ALL NEW

AND EXISTING VALVES AND EQUIPMENT LOCATED WITHIN THE CONSTRUCTION LIMITS AS

INDICATED IN THE SPECIFICATIONS.

F. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

G. CONTRACTOR IS TO VERIFY THE PRESENCE OF EXISTING CONDUIT IN THE EXISTING

FLOOR SLABS PRIOR TO ANY WORK TAKING PLACE.

PLUMBING GENERAL NOTES

SCALE: ??

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:1

A M

P000

PLUMBING SYMBOLS AND

ABBREVIATIONSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

PLUMBING DEMOLITION GENERAL NOTES

A. SEE SHEET P000 FOR GENERAL NOTES.

B. SOME COMPONENTS OF EXISTING SYSTEMS MAY HAVE CODE VIOLATIONS

BEFORE AND DURING DEMOLITION, PARTICULARLY ABOVE CEILINGS, BEHIND

CHASE WALLS, IN-WALL, AND ABOVE AND BELOW PRIMARY SPACES TO BE

DEMOLISHED WHEN NOT DOCUMENTED ON DRAWINGS, AND NOT OBSERVED

DURING SITE WALK-THROUGH.

PLUMBING DEMOLITION PLAN NOTES

1. REMOVE PORTION OF EXISTING 3" CW PIPING FOR NEW PIPING.

CA

CB

C

D

E

17.1717.16

F

G

H

L C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

A

SOUTH

B D

BUILDING 6 BASEMENT KEY PLAN

N

SHADE INDICATES

AREA NOT IN

SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

C

SOUTH

C

NORTH

A

NORTH

M

N

O

P

17.1717.16

L

CORRIDOR C

CB12

3" CW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:1

A M

PD100

BASEMENT - C WING - PLUMBING

DEMOLITION PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

NN

SCALE: 1/8" = 1'-0"PD100

1 BASEMENT - C WING NORTH - PLUMBING DEMOLITION PLAN

NN

SCALE: 1/8" = 1'-0"PD100

2 BASEMENT - C WING SOUTH - PLUMBING DEMOLITION PLAN

PLUMBING PIPING PLAN NOTES

1. CONNECT NEW 4" SAN PIPING INTO EXISTING MAIN IN THIS AREA.

2. CONNECT NEW 3" CW PIPING INTO EXISTING MAIN AT THIS LOCATION.

3. INSTALL NEW 2" SUMP PUMP DISCHARGE PIPING OUTSIDE AT 18 INCHES

ABOVE GRADE. PROVIDE CONCRETE SPLASH BLOCK AND TURN ELBOW

DOWN OVER BLOCK. PROVIDE INSECT SCREEN OVER OPENING.

PLUMBING PIPING GENERAL NOTES

A. SEE SHEET P000 FOR GENERAL NOTES.

B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED

AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.

M

N

O

P

17.1717.16

L

M A

T C

H L

IN

E

B -W

IN

G

C -W

IN

G

CORRIDOR C

CB12

3" CW

3" CW

CA

CB

C

D

E

17.1717.16

F

G

H

L

B -W

IN

G

C -W

IN

G

CORRIDOR

CB40

TRAINING

CB45

TRAINING

CB48

TRAINING

CB46

TRAINING

CB43

TRAINING

CB44

TRAINING

CB41

CIRC.

CB23

ELEV. LOBBY

CB22

ELEV.

C2-P VESTIBULE

CB24

STORAGE

CB15

ELEC. ROOM

CB16

DHW / UTILITY

CB21

MECHANICAL

CB42

VESTIBULE

CB50

STORAGE

CB18

3" CW

PP400

SP-C2-P

3/4" HWR

1 1/4" HW

3" CW

P-606

2 1/2" CW,

1" HW,

3/4" HWR UP

1 1/4" CW

1 1/4" HW

3/4" HWR

3" CW

2" CW

3/4" HW

1/2" HWR

2 1/2" CW

1" HW

3/4" HWR

ISOLATION

VALVE

ISOLATION

VALVE

ISOLATION

VALVE

WOMENS RR

CB19-A

MENS RR

CB19-B

PP400

2" CW

3/4" HW

1/2" HWR

4" SAN

4" SAN1

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

A

SOUTH

B D

BUILDING 6 BASEMENT KEY PLAN

N

SHADE INDICATES

AREA NOT IN

SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

C

SOUTH

C

NORTH

A

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:2

A M

PP100

BASEMENT - C WING - PLUMBING

PIPING PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

NN

SCALE: 1/8" = 1'-0"PP100

1 BASEMENT - C WING SOUTH - PLUMBING PIPING PLAN

SCALE: 1/8" = 1'-0"PP100

2 BASEMENT - C WING NORTH - PLUMBING PIPING PLAN - WATER

PLUMBING PIPING GENERAL NOTES

A. SEE SHEET P000 FOR GENERAL NOTES.

B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED

AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.

PLUMBING PIPING PLAN NOTES #

1. RECONNECT EXISTING PLUMBING UTILITIES TO NEW PLUMBING FIXTURE.

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

B D

BUILDING 6 FIRST FLOOR KEY PLAN

N

SHADE INDICATES AREA

NOT IN SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

A

SOUTH

C

SOUTH

C

NORTH

A

NORTH

CA

CB

C

D

E

17.1717.16

F

G

H

L

ELEV. LOBBY

C120

ELEV.

C2-P

BREAK AREA

C118

SECURITY

C118-A

STORAGE

C119-C

CORRIDOR

C115B

B -W

IN

G

C -W

IN

G

C -W

IN

G

D -W

IN

G

PP400

BREAK AREA

C118

MENS RR

C119-BWOMENS RR

C119-A

2 1/2" CW

1" HW

3/4" HWR

2 1/2" CW,

1" HW,

3/4" HWR DN

ISOLATION

VALVE

ISOLATION

VALVE

PP400

P-606

P-413

1/2" HWR

1/2" HW

1/2" CW

M

N

O

P

17.1717.16

L

C106

B -W

IN

G

C -W

IN

G

C -W

IN

G

D -W

IN

G

M

N

17.1717.16

OFFICE

C304

OFFICE

C302

CORRIDOR

C3A

RESTROOM

C301-A

P-401

P-103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:2

A M

PP102

FIRST AND THIRD FLOORS - C

WING - PLUMBING PIPING PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

NN

SCALE: 1/8" = 1'-0"PP102

1 FIRST FLOOR - C WING NORTH - PLUMBING PIPING PLAN

SCALE: 1/8" = 1'-0"PP102

2 FIRST FLOOR - C WING SOUTH - PLUMBING PIPING PLAN

Revisions: Date:

SCALE: 1/8" = 1'-0"PP102

3 THIRD FLOOR - C-WING - PLUMBING PIPING PLAN

T T

T

TT

G

H

DWH-CB21 HWCP-CB21

P-202

P-201

P-103

P-103P-103

P-103

P-103

P-103

P-404 P-404 P-404 P-404

3/4" HW

2" CW

OFFSET UP

ISOLATION

VALVE ISOLATION

VALVE

1 1/4" CW

1 1/4" HW

3/4" HWR

3/4" HWR

1 1/4" HW

1 1/4" CW

P-FD-D P-FD-D

2" CW 2" CW

1 1/2" CW 1 1/2" CW

2" CW 2" CW

2" CW

3/4" HW

1/2" HWR

2" CW

2" CW

1 1

3 3

P-FD-D

DHW / UTILITY

CB21

MENS RR

CB19-B

WOMENS RR

CB19-A

G

H

P-413

P-202

P-201

P-103

P-103

P-103

P-103

P-103

P-103

P-404

P-404

P-404 P-404

2" CW

3/4" HW

1/2" HWR

2" CW

2" CW

2" CW

3/4" HW

1/2" HWR

2" CW 2" CW

2" CW 2" CW

1 1/2" CW

1 1/2" CW

1 1

ISOLATION

VALVE

ISOLATION

VALVE

WOMENS RR

C119-A

MENS RR

C119-B

STORAGE

C119-C

G

H

P-FD-D

DWH-CB21

HWCP-CB21

DHW / UTILITY

CB21

MENS RR

CB19-B

WOMENS RR

CB19-A

4"V UP

4"SAN UP

P-103

P-103

P-103

P-FD-D P-FD-D

P-103

P-201

P-202

P-103 P-103

4" SAN

4" SAN

2" V

2" V

4" SAN

FCO

4" SAN

G

H

STORAGE

C119-C

MENS RR

C119-B

WOMENS RR

C119-A

P-103

P-103

P-103P-103

P-103

P-103 P-202

P-201

P-404 P-404 P-404 P-404

4"V UP/DN4"SAN DN

4" SAN

2" V

2" V

4" SAN

4"V UP TO

4' VTR

P-FD-D P-FD-D

2" SAN

1 1/2" V

PLUMBING PIPING PLAN NOTES

1. 1-1/2" CW DOWN TO WATER CLOSET. PROVIDE WATER HAMMER ARRESTOR

AT WATER CONNECTION. INSTALL IN ACCESSIBLE LOCATION. INSTALL PER

MANUFACTURER'S REQUIREMENTS.

2. 1" CW DOWN TO URINAL. PROVIDE WATER HAMMER ARRESTOR AT WATER

CONNECTION. INSTALL IN ACCESSIBLE LOCATION. INSTALL PER

MANUFACTURER'S REQUIREMENTS.

3. 1/2" CW, 1/2" HW, 1/2" HWR DOWN TO LAVATORY. INSTALL HWR TO WITHIN 12

INCHES OF HW MIXING VALVE CONNECTION TO LAVATORY.

4. 1/2" CW, 1/2" HW DOWN TO SINK. INSTALL HWR TO WITHIN 12 INCHES OF HW

MIXING VALVE CONNECTION TO SINK.

5. INSTALL FULL LINE SIZE WALL CLEANOUT APPROXIMATELY 12 INCHES A.F.F.

COORDINATE WITH WALL MATERIAL AND CENTER IN TILE, WHERE

NECESSARY.

6. PROVIDE MAIN MASTER THERMOSTATIC MIXING VALVE NEAR WATER

HEATER.

PLUMBING PIPING GENERAL NOTES

A. SEE SHEET P000 FOR GENERAL NOTES.

B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED

AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:3

A M

PP400

PLUMBING ENLARGED PLANS

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP400

1 BASEMENT - C WING NORTH - ENLARGED PLUMBING PIPING PLAN - DOMESTIC WATER

SCALE: 1/4" = 1'-0"PP400

2 FIRST FLOOR - C WING NORTH - ENLARGED PLUMBING PIPING PLAN - DOMESTIC WATER

N

N

SCALE: 1/4" = 1'-0"PP400

3 BASEMENT - C WING NORTH - ENLARGED PLUMBING PIPING PLAN WASTE/VENT

SCALE: 1/4" = 1'-0"PP400

4 FIRST FLOOR - C WING NORTH - ENLARGED PLUMBING PIPING PLAN WASTE/VENT

N

EXTERIOR SIDE OF CONCRETE

WALL

1/4" STEEL PLATE WATER

STOP & ANCHOR COLLAR

FLEXIBLE EXPANSION JOINT

MIN. DEFLECTION 15"

MIN. EXPANSION 4"

RESILIENT WATERPROOF

CAULKING

5/8"

ROD

WELD

PIPE CENTERED IN

SLEEVE

1/4"x1/4"

IRON

PIPE CLAMP

STANDARD

WEIGHT GAL.

STEEL PIPE

SLEEVE

1/4"x1/4"

IRON

PIPE STRAP

MODULAR TYPE

WALL

PENETRATION

SEAL

FLANGED

CONNECTION

INTERIOR SIDE

OF WALL

STAINLESS STEEL BOLTS,

NUTS & WASHERS

2"

FLASHING MEMBRANE, MIN.

24" SQUARE 2 1/2 LB. TO 4 LB.

LEAD OR 16 OZ. COPPER.

ADJUSTABLE NICKEL

BRONZE STRAINER

WITH 4" FLANGE (FLUSH WITH

FINISHED FLOOR)

WEEP HOLES

COMPOSITION FLOORING

NOTE:

1. SLOPE MEMBRANE LINER 2% TO DRAIN.

2. PROVIDE FLASHING MEMBRANE WHEN DRAIN IS INSTALLED IN A NON MEMBRANE FLOOR

INVERTIBLE

FLASHING COLLAR

LOOSE

GRAVEL AT

WEEP HOLES

CAULKED, NO-HUB

OR THREADED CONNECTION

WIDE

FLANGE

INSTEAD OF USING A DOUBLE NUT - A

PIPE SLEEVE OVER ROD MAY BE USED

HANGER ROD

SUPPORT FOOT

BOLT TO FLOOR

(TYPICAL)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

35% SCHEMATIC DESIGN 11/20/2020

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:3

A M

PP500

PLUMBING DETAILS

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/8" = 1'-0"PP500

1 PIPE PENETRATION THROUGH WALLS BELOW GRADE

SCALE: 3/8" = 1'-0"PP500

2 TYPE "D" FLOOR DRAIN DETAIL

SCALE: 3/8" = 1'-0"PP500

4 INSTALLATION OF HANGER SUPPORT FOOT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/1 /2

:4

:3

A M

PP600

PLUMBING SCHEDULES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

PLUMBING FIXTURE SCHEDULE

MARK FIXTURE TYPE DESCRIPTION

CONNECTION SIZES (IN)

CW HW WASTE VENT

P-103 WATER CLOSET WATER CLOSET (WALL HUNG, ASME A112.19.2) OFFICE AND INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.

1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY, CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT

SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.

2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND

CARRIER.

3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE, WATER SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE, 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE.

VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2

INCHES) ABOVE SEAT.

1 1/2 - 4 2

P-201 URINAL URINAL (WALL HUNG, ASME A112.19.2) BOWL WITH INTEGRAL FLUSH DISTRIBUTION, WALL TO FRONT OF FLARE 343 MM (13.5 INCHES) MINIMUM. WALL HUNG WITH INTEGRAL TRAP, SIPHON JET FLUSHING ACTION 1.9 L (0.5 GALLONS) PER FLUSH WITH 50

MM (2 INCHES) BACK OUTLET AND 20 MM (3/4 INCH) TOP INLET SPUD.

1.SUPPORT URINAL WITH CHAIR CARRIER AND INSTALL WITH RIM 600 MM (24 INCHES) ABOVE FINISHED FLOOR.

2.FLUSHING DEVICE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED…