Attachment 6 - Drawings 3 of 4.pdf
PDF 10 MB Posted
- Attached to
- Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
- Solicitation number
- 36C77622B0017
About this file
This document is an attachment to a solicitation for construction services. The solicitation number is 36C77622B0017 and is for Y1DZ--EHRM Training and Admin Space Support Construction located in Milwaukee, Wisconsin. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency. The solicitation seeks construction services to support training and administrative spaces as described in document IFB - 36C77622B0017 - 2-10-22 and related supporting attachments. The response due date and anticipated award date cannot be determined from this attachment alone.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
DN
DN
UP
DN
B -W
IN
G
C -W
IN
G
STORAGE
CB49
STAIR
CB4
VESTIBULE
CB50
TRAINING
CB48
TRAINING
CB45
TRAINING
CB46
TRAINING
CB44
TRAINING
CB43
TRAINING
CB41
MECHANICAL
CB42
CORRIDOR
CB40
ELEV.
C2-P
ELEV. LOBBY
CB22
VESTIBULE
CB24
CIRC.
CB17
DHW / UTILITY
CB21
ELEC. ROOM
CB16
STORAGE
CB15
CIRC.
CB23
STORAGE
CB18
WOMENS RR
CB19-A
VESTIBULE
CB22A
4' - 0" 3' - 3"3' - 11 1/4" 4' - 2 1/2"
MENS RR
CB19-B
DK1
CH1
CO1
PS1
A. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE EQUIPMENT,
FURNISHINGS, AND TECHNOLOGY, AND WALL MOUNTED ACCESSORIES AS
REQUIRED. REFER TO ARCHITECTURE SHEETS FOR MORE INFORMATION.
B. COORDINATE ALL EQUIPMENT LOCATIONS AND UTILITIES REQUIREMENTS
WITH EQUIPMENT PLANS, SCHEDULES, AND ENGINEERING DRAWINGS.
C. REFER TO FURNITURE VENDOR DRAWINGS AND DETAILED FURNITURE
SCHEDULE FOR FINAL FURNITURE PLACEMENT.
D. ALL EQUIPMENT AND FURNITURE INDICATED IN THE DRAWINGS ARE DRAWN
TO SCALE FOR TEST FITTING UNLESS OTHERWISE NOTED.
E. FURNITURE AND EQUIPMENT IS FURNISHED BY THE VA AND IS SHOWN FOR
COORDINATION OF UTILITIES AND POSSIBLE LAYOUT ONLY.
EQUIPMENT GENERAL NOTES
A
SOUTH
B D
BUILDING 6 BASEMENT KEY PLAN
N
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
C
SOUTH
C
NORTH
A
NORTH
D
BUILDING 6 THIRD FLOOR KEY PLAN
N
HATCH INDICATES
ROOF AREA
BELOW, NIC
NO SHADE
INDICATES
LOCATION OF
PROJECT, TYP
C SOUTH
C
NORTH
(ROOF
ONLY)
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
OFFICE
C304
RECEPTION
C308
OFFICE
C307
OFFICE
C302
STAIR C1
C1
ETR
C303
OPEN OFFICE
C305
STAIR
C306
CORRIDOR
C3A
ELEVATOR C1
C1
RESTROOM
C301-A
UTILITY
C301-B
C -W
IN
G
D -W
IN
G
WS-1
1. INSTALL WHITEBOARD THIS LOCATION. SIZE BY VA OR VA'S VENDOR.
INTERIOR FINISHES PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
C
U s e rs \c s u tt o n \D o c u m e n ts
\1
.1
.2
A v c s u tt o n B
F V
.r v t
/1 /2
:1
:5
P
M
QH100
BASEMENT - C-WING - EQUIPMENT
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 JF CS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"QH100
2 BASEMENT EQUIPMENT PLAN
N
SCALE: 1/8" = 1'-0"QH100
1 THIRD FLOOR EQUIPMENT PLAN - C-WING
Revisions: Date:
DN
DN
DN
DN
DN
UP
DN
DN
A. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE EQUIPMENT,
FURNISHINGS, AND TECHNOLOGY, AND WALL MOUNTED ACCESSORIES AS
REQUIRED. REFER TO ARCHITECTURE SHEETS FOR MORE INFORMATION.
B. COORDINATE ALL EQUIPMENT LOCATIONS AND UTILITIES REQUIREMENTS
WITH EQUIPMENT PLANS, SCHEDULES, AND ENGINEERING DRAWINGS.
C. REFER TO FURNITURE VENDOR DRAWINGS AND DETAILED FURNITURE
SCHEDULE FOR FINAL FURNITURE PLACEMENT.
D. ALL EQUIPMENT AND FURNITURE INDICATED IN THE DRAWINGS ARE DRAWN
TO SCALE FOR TEST FITTING UNLESS OTHERWISE NOTED.
E. FURNITURE AND EQUIPMENT IS FURNISHED BY THE VA AND IS SHOWN FOR
COORDINATION OF UTILITIES AND POSSIBLE LAYOUT ONLY.
EQUIPMENT GENERAL NOTES
HAC
FILES/SCANNING
A115
STAIR
CORRIDOR
A101
MECHANICAL
A121
BREAKOUT
A122
TRAINING
A124
WOMEN
RESTROOM
ELEVATOR
TRAINING
A118-A
STORAGE
A116-C
CIRC.
A117
CORRIDOR
TRAINING
A118-B
A104
MEN
RESTROOM
VESTIBULE
OIT
SUPPORT
A106
A117
A111
B D
BUILDING 6 FIRST FLOOR KEY PLAN
N
SHADE INDICATES AREA
NOT IN SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
A
SOUTH
C
SOUTH
C
NORTH
A
NORTH
CIRC.
C116
ELEV.
C2-P
ELEV. LOBBY
C120
WAITING
C142
LIGHTWELL
C----
STORAGE
C119-C STAIR C2
C2
MECHANICAL
C126
TRAINING
C106-C
IT ROOM
C118-B
TRAINING
C148
TRAINING
C146
TRAINING
C144
TRAINING
C141
TRAINING
C143
TRAINING
C145
CORRIDOR
C140
B -W
IN
G
C -W
IN
G
C -W
IN
G
D -W
IN
G
WOMENS RR
C119-A BREAK AREA
C118
SECURITY
C118-A
MENS RR
C119-B
WAITING
C124 CONFERENCE ROOM
C124-A
STAIR
C4
CH2
CH3
TB2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
C
U s e rs \c s u tt o n \D o c u m e n ts
\1
.1
.2
A v c s u tt o n B
F V
.r v t
/1 /2
:1
:0
P
M
QH101
FIRST FLOOR- A-WING AND C
WING - EQUIPMENT PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 JF CS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"QH101
1 FIRST FLOOR EQUIPMENT PLAN - A-WING
N
SCALE: 1/8" = 1'-0"QH101
2 FIRST FLOOR EQUIPMENT PLAN - C-WING NORTH
N
17.10
17.11
17.12
17.13
17.14
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 4" FPD UP
(E) 3" FPD
A-WING NORTH
A-WING SOUTH
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER DECK
ROOM
AB05
ROOM
AB04
CORRIDOR
AB13
ELEVATOR
A
ROOM
AB11
ROOM
AB11B
ROOM
AB14
ROOM
AB01
ROOM
AB11A
(E) 6" DRY PIPE VALVE
(E) FIRE DEPARTMENT
CONNECTION
(E) 3" FPD(E) 3" FPD
(E) 3" FPD
(E) 3" FPD (E) 3" FPD
(E) 6" FPD
(E) 3" FPD
(E) 3" FPD
(E) 3" FPD
(E) 2" FPD
(E) 3" FPD
(E) 3" FPD
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER RAMP
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER DECK
(E) FPD PIPING
UNDER DECK
A-WING NORTH
A-WING SOUTH
(E) 6" FPD UP
(E) 6" FPD UP
(E) 4" FPD
4" FP UP
6" FP
(E) UG 8" FP
FX401
(2) 2 1/2" HOSE VALVES FOR
FORWARD FLOW TEST CONNECTION
6" WET PIPE VALVE
6" DOUBLE CHECK BACKFLOW
PREVENTER W/ TAMPER SWITCH
MECHANICAL ROOM
AB07A
ROOM
AB07
ROOM
AB08
ROOM
AB09
ROOM
AB06
STAIR
A1
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
A B C D
BUILDING 6 KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
WHITE SHADE INDICATES
LOCATION OF PROJECT,
TYP
#PLAN NOTES
1. REFER TO SECTION VIEWS ON SHEET FX401 FOR WORK AT FIRE RISER
VALVES.
2. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION
SYSTEM.
LEGEND & ABBREVIATIONS
NEW PIPING
EXISTING PIPING
FIRE PROTECTION (DRY PIPE SYSTEM)
FPD
EXISTING TO REMAIN(E)
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
REVISION NUMBER#
SQUARE FEETSF
QUICK RESPONSEQR
GALLONS PER MINUTEGPM
DOWNDN
FIRE PROTECTION (WET PIPE SYSTEM)
FP
PIPING TO BE REMOVED
POINT OF REMOVAL BETWEEN DEMOLITION
AND EXISTING WORK
OUTSIDE STEM AND YOKEOS&Y
A
A-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
FIRST FLOOR, TYP
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX101
BASEMENT FIRE SUPPRESSION
PLAN - A WING
PP GP
1/8" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN - A WING NORTH
1/8" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN - A WING SOUTH
11/12/2021
ELEV.
C2-P
(E) 4" FPD
FP
FP
FP FP
FP UP FP UP
VESTIBULE
CB50
TRAINING
CB45
TRAINING
CB43
TRAINING
CB41
TRAINING
CB48
TRAINING
CB46
TRAINING
CB44
MECHANICAL-1
CB42-1
ELEV. LOBBY
CB22
VESTIBULE
CB24
ELEC. ROOM
CB16
STORAGE
CB15
WOMENS RR-1
CB19-A-1
VESTIBULE-2
CB50-2
STAIR C2-1
C2-1
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
C WING NORTH
C WING SOUTH
STAIR
CB4
STORAGE
CB49
CORRIDOR-1
CB40-1
MECHANICAL-2
CB42-2
VESTIBULE
CB22A
CIRC.
CB23
WOMENS RR-2
CB19-A-2
MENS RR-2
CB19-B-2
STORAGE
CB18
CIRC.-1
CB17-1
CIRC.-2
CB17-2
IT ROOM
CB18-C
CORRIDOR C
CB12
DHW / UTILITY
CB21
FP
FP
FP UP
FP FP
2 2
(E) 4" FPD
(E) 3" FPD UP
(E) 4" FPD
(E) 4" FPD
(E) 2" FPD
(E) 4" DRY
PIPE VALVE
(E) FIRE DEPARTMENT
CONNECTION
C WING NORTH
C WING SOUTH
STAIR C1-1
C1-1
CORRIDOR C
CB12
ELEV. EQUIP.-2
CB11-2
ELEV.
C1-P
RR-MENS
CB06
RR-WOMEN'S
CB10
CIRC.
CB07
FM OFFICE
CB05
CIRC.
CB08
ELECTRICAL CLOSET
CB09
(E) UG 6" FP
FX401
6" DOUBLE CHECK BACKFLOW
PREVENTER W/ TAMPER SWITCH
6" WET PIPE VALVE
FP
4" FP UP
6" FP
FP
(2) 2 1/2" HOSE VALVES FOR
FORWARD FLOW TEST CONNECTION
CORRIDOR C
CB12
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER 1500
SF
0.15 GPM/SF OVER 1500
SF
0.20 GPM/SF OVER 1500
SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
#PLAN NOTES
1. REFER TO SECTION VIEWS ON SHEET FX401 FOR WORK AT FIRE RISER
VALVES.
2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND
ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE
SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN
ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.
3. REMOVE DRY PIPE FIRE SPRINKLER LINE AND ASSOCIATED COMPONENTS
BACK TO POINT SHOWN AND CAP.
4. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION
SYSTEM.
LEGEND & ABBREVIATIONS
NEW PIPING
EXISTING PIPING
FIRE PROTECTION (DRY PIPE SYSTEM)
FPD
EXISTING TO REMAIN(E)
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
REVISION NUMBER#
SQUARE FEETSF
QUICK RESPONSEQR
GALLONS PER MINUTEGPM
DOWNDN
FIRE PROTECTION (WET PIPE SYSTEM)
FP
PIPING TO BE REMOVED
POINT OF REMOVAL BETWEEN DEMOLITION
AND EXISTING WORK
OUTSIDE STEM AND YOKEOS&Y
FIRE HAZARD LEGEND
A B C D
BUILDING 6 KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
WHITE SHADE INDICATES
LOCATION OF PROJECT,
TYP
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX102
BASEMENT FIRE SUPPRESSION
PLAN - C WING
PP GP
1/8" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN - C WING NORTH
1/8" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN - C WING SOUTH
DN
17.10
17.11
17.12
17.13
17.14
(E) 4" FPD
(E) 4" FPD DN
(E) 4" FPD
FPD
BREAKOUT
A122
MECHANICAL
A121
TRAINING
A118-B
OIT CLOSET
A104
CORRIDOR-1
A101-1
CORRIDOR
A/B
TRAINING
A124
A WING NORTH
A WING SOUTH
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
CIRC.
A117
STORAGE
A116-C
PORCH
C310
PORCH
C311
4" FP DN
TRAINING
A118-A
FP
FP
FP
FP
FP FP
FP
FP
FP
STAIR
A1
CORRIDOR-2
A101-2
VESTIBULE
A100
(E) 4" FPD
FPD
FPD
FPD
FPD
FPD FPD
MECHANICAL ROOM
A116
ROOM
A117
ROOM
A109
ROOM
A112
SCANNING ROOM
A113
CONFERENCE ROOM
A114
FILES/SCANNING
A115
NON-VA CARE
A108
NON-VA CARE
A108
A WING NORTH
A WING SOUTH
(E) 6" FPD DN
(E) 6" FPD UP & DN
PORCH
C312
PORCH
C312
A
A-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
FIRST FLOOR, TYP
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER 1500
SF
0.15 GPM/SF OVER 1500
SF
0.20 GPM/SF OVER 1500
SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
#PLAN NOTES
1. CONNECT NEW DRY PIPE FIRE SPRINKLER PIPING TO EXISTING AT POINT
SHOWN.
2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND
ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE
SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN
ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.
3. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION
SYSTEM.
LEGEND & ABBREVIATIONS
NEW PIPING
EXISTING PIPING
FIRE PROTECTION (DRY PIPE SYSTEM)
FPD
EXISTING TO REMAIN(E)
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
REVISION NUMBER#
SQUARE FEETSF
QUICK RESPONSEQR
GALLONS PER MINUTEGPM
DOWNDN
FIRE PROTECTION (WET PIPE SYSTEM)
FP
PIPING TO BE REMOVED
POINT OF REMOVAL BETWEEN DEMOLITION
AND EXISTING WORK
OUTSIDE STEM AND YOKEOS&Y
FIRE HAZARD LEGEND
A B C D
BUILDING 6 KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
WHITE SHADE INDICATES
LOCATION OF PROJECT,
TYP
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX103
FIRST FLOOR FIRE SUPPRESSION
PLAN - A WING
PP GP
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN - A WING NORTH
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN - A WING SOUTH
FP FP
FP DN FP DN
FP FP
STAIR C2-2
C2-2
LIGHTWELL
C----
CIRC.
C116
MENS RR-1
C119-B-1
WOMENS RR
C119-A
TRAINING
C145
TRAINING
C148
TRAINING
C146
ELEV.-2
C2-P-2
TRAINING
C144
TRAINING
C143
IT ROOM
C118-B
TRAINING
C141
MECHANICAL
C126
C WING NORTH
C WING SOUTH
FP
FP
FP
FP
FP
FP
FP
FP
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
CORRIDOR-1
C140-1
STAIR
C4
CORRIDOR-2
C140-2
WAITING
C142
WAITING
C124
ELEV. LOBBY
C120
SECURITY
C118-A
STORAGE
C119-C
CONFERENCE ROOM
C124-A
ELEV. MACHINE.
C121
BREAK AREA
C118
TRAINING
C106-C
FP DN
FP
FP
FP
FP
(E) 3" FPD UP & DN
(E) 2" FPD
STAIR
C106
CORRIDOR
C115A
STAIR C1-2
C1-2
4" FP UP & DN
FP
C WING NORTH
C WING SOUTH
ROOM
C104
ROOM
C105
ROOM
C108
ROOM
C107
ROOM
C103
ELEV. EQUIP.-1
CB11-1
ROOM
C109
Space
C132
CORRIDOR
C115B
CORRIDOR
B/C
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER 1500
SF
0.15 GPM/SF OVER 1500
SF
0.20 GPM/SF OVER 1500
SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
#PLAN NOTES
1. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND
ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE
SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN
ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.
2. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION
SYSTEM.
LEGEND & ABBREVIATIONS
NEW PIPING
EXISTING PIPING
FIRE PROTECTION (DRY PIPE SYSTEM)
FPD
EXISTING TO REMAIN(E)
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
REVISION NUMBER#
SQUARE FEETSF
QUICK RESPONSEQR
GALLONS PER MINUTEGPM
DOWNDN
FIRE PROTECTION (WET PIPE SYSTEM)
FP
PIPING TO BE REMOVED
POINT OF REMOVAL BETWEEN DEMOLITION
AND EXISTING WORK
OUTSIDE STEM AND YOKEOS&Y
FIRE HAZARD LEGEND
A B C D
BUILDING 6 KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
WHITE SHADE INDICATES
LOCATION OF PROJECT,
TYP
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX104
FIRST FLOOR FIRE SUPPRESSION
PLAN - C WING
PP GP
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN - C WING NORTH
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN - C WING SOUTH
(E) 3" FPD DN
(E) 3" FPD
ROOM
C203
ROOM
C204
ROOM
C208
ROOM
C209
ROOM
C207
CORRIDOR
C201A
STAIR
C205
4" FP UP & DN
FP
3" FPD UP
STAIR C1-2
C1-2
CORRIDOR
C201
(E) 1" FPD UP
3" FPD DN
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
(E) 3" FPD UP
(E) 2" FPD
(E) 3" FPD
STAIR C1-2
C1-2
OFFICE
C304
RESTROOM-1
C301-A-1
RESTROOM-2
C301-A-2
UTILITY
C301-B
OFFICE
C302
OFFICE
C307
STAIR
C306
ETR
C303
OPEN OFFICE-2
C305-2
CORRIDOR
C3A
OPEN OFFICE-3
C305-3
ELEVATOR C1
C1
4" FP DN
FP
FP
RECEPTION
C308
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER 1500
SF
0.15 GPM/SF OVER 1500
SF
0.20 GPM/SF OVER 1500
SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
#PLAN NOTES
1. PROVIDE CAP FOR FUTURE CONNECTION TO WET PIPE FIRE PROTECTION
SYSTEM.
2. REMOVE DRY PIPE SYSTEM SPRINKLER HEADS IN THIS ROOM AND
ASSOCIATED BRANCH PIPING BACK TO MAINS. INSTALL NEW WET PIPE
SYSTEM SPRINKLER HEADS AND PIPING TO SERVE THIS ROOM IN
ACCORDANCE WITH NFPA 13 AND VA DESIGN MANUAL.
3. CONNECT NEW DRY PIPE SPRINKLER PIPING TO EXISTING AT POINT SHOWN.
LEGEND & ABBREVIATIONS
NEW PIPING
EXISTING PIPING
FIRE PROTECTION (DRY PIPE SYSTEM)
FPD
EXISTING TO REMAIN(E)
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
PIPE UP
PIPE DOWN
PIPING CONTINUATION
REVISION NUMBER#
SQUARE FEETSF
QUICK RESPONSEQR
GALLONS PER MINUTEGPM
DOWNDN
FIRE PROTECTION (WET PIPE SYSTEM)
FP
PIPING TO BE REMOVED
POINT OF REMOVAL BETWEEN DEMOLITION
AND EXISTING WORK
OUTSIDE STEM AND YOKEOS&Y
FIRE HAZARD LEGEND
A B C D
BUILDING 6 KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
WHITE SHADE INDICATES
LOCATION OF PROJECT,
TYP
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX105
SECOND & THIRD FLOOR FIRE
SUPPRESSION PLANS
PP GP
1/8" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN - C WING
1/8" = 1'-0"
THIRD FLOOR FIRE SUPPRESSION PLAN - C WING
FIRST FLOOR
100' - 0"
BASEMENT
90' - 0"
6" DOUBLE CHECK BACKFLOW
PREVENTER WITH TAMPER SWITCH
(E) FIRE DEPARTMENT
CONNECTION
(E) 6" DRY PIPE VALVE
(E) 6" FPD TO A-WING
(E) 8" CHECK VALVE
(E) 4" CHECK VALVE
(E) 6" OS&Y VALVE
(2) 2 1/2" HOSE VALVES FOR
FORWARD FLOW TEST CONNECTION
4" FP
4" FP
6" FP
6" FP TO A-WING
FLOW SWITCH RELOCATED
PRESSURE SWITCH
RELOCATED 6"
DRY PIPE VALVE
RELOCATED 6"
OS&Y VALVE
4" CHECK VALVE
6" BUTTERFLY VALVE WITH
TAMPER SWITCH
4" CONTROL VALVE TO
FORWARD FLOW TEST
CONNECTION
6" WET PIPE VALVE WITH
INSPECTORS TEST AND DRAIN
(E) 8" FP
6 7
FIRST FLOOR
100' - 0"
BASEMENT
90' - 0"
(E) FIRE DEPARTMENT
CONNECTION
(E) 6" DRY PIPE VALVE
(E) 6" FPD TO A-WING
(E) 8" FP
(E) 8" CHECK VALVE
(E) 4" CHECK VALVE
(E) 6" OS&Y VALVE
6" DRY PIPE VALVE
(TO BE RELOCATED)
6" OS&Y VALVE (TO
BE RELOCATED)
PRESSURE SWITCH
(TO BE RELOCATED)
FIRST FLOOR
100' - 0"
BASEMENT
90' - 0"
(E) FIRE DEPARTMENT
CONNECTION
(E) 4" DRY PIPE VALVE
(E) 4" FPD TO C-WING
(E) 4" CHECK VALVE
(2) 2 1/2" HOSE VALVES FOR
FORWARD FLOW TEST CONNECTION
6" FP TO C-WING
6" FP
6" FP
4" FP
4" FP
4" CHECK VALVE
(E) PRESSURE SWITCH
(E) 6" FP
6" DOUBLE CHECK BACKFLOW
PREVENTER WITH TAMPER SWITCH
6" BUTTERFLY VALVE WITH
TAMPER SWITCH
6" WET PIPE VALVE WITH
INSPRECTORS TEST AND DRAIN
FLOW SWITCH
4" CONTROL VALVE TO FORWARD
FLOW TEST CONNECTION
GENERAL NOTES
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN RENOVATED
AREAS IN ACCORDANCE WITH NFPA 13 AND VA FIRE PROTECTION MANUAL.
B. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE
ATTENTION OF THE VA COR IN WRITING ANY DISCREPANCIES WHICH MAY
IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND
PLATFORMS WHEN SUCH EQUIPMENT CAN NEGATIVELY EFFECT OR
DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS
REQUIRED TO PROVIDE A COMPLETE INSTALLATION AND TO ELIMINATE
INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES, PIPE LAYOUT, AND SPRINKLER HEAD LOCATIONS SHALL BE
DETERMINED BY HYDRAULIC CALCULATION BY THE FIRE SPRINKLER
CONTRACTOR.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL
OTHER TRADES. EQUIPMENT AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE MEANS AND
METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM
ZONES, SMOKE PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. REMOVE ALL ABANDONED FIRE PROTECTION PIPING LOCATED WITHIN
PROJECT SCOPE AREA.
I. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AT WET PIPE AND DRY
PIPE VALVES AND SUBMIT RESULTS AND SPRINKLER DESIGN.
#PLAN NOTES
1. CUT PIPING TEMPORARILY FOR NEW PIPING CONNECTION.
2. REMOVE PIPING AND COMPONENTS BETWEEN POINTS SHOWN. PIPING TO
BE RECONFIGURED AND DRY PIPE VALVE, OS&Y VALVE, AND PRESSURE
SWITCH TO BE RELOCATED AND RE-USED. REFER TO NEW WORK PIPING
SHOWN ON THIS SHEET.
3. PROVIDE CAP FOR FUTURE CONNECTION.
4. CONNECT NEW DRY PIPE SPRINKLER PIPING TO EXISTING AT POINT SHOWN.
5. CONNECT NEW WET PIPE SPRINKLER PIPING TO EXISTING AT POINT
SHOWN.
6. ONE VALVE REQUIRED FOR EACH 250 GPM DEMAND.
7. LOCATE AS REQUIRED TO MAKE ACCESSIBLE OUTSIDE OF EXTERIOR
GATED AREA.
8. CORE DRILL THROUGH EXTERIOR WALL FOR INSTALLATION OF PIPING.
9. DRAIN TO EXISTING SUMP BASIN.
10. CONNECT DRAIN TO EXISTING DRAIN LINE USED FOR EXISTING DRY PIPE
VALVES.
/2
/2
:4
:4
A
M
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
BID DOCUMENTS
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
BID DOCUMENTS 11/12/2021
Revisions: Date:
FX401
FIRE SUPPRESSION RISER
SECTIONS
PP GP
1/2" = 1'-0"
A-WING RISER SECTION - NEW WORK
1/2" = 1'-0"
A-WING RISER SECTION - DEMOLITION WORK
1/2" = 1'-0"
C-WING RISER SECTION - NEW WORK
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWH KILOWATT-HOUR
PLUMBING ABBREVIATIONS
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING ONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
VIEW TITLE
NORTH ARROW
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
DRAWING SYMBOLS
XX-X X
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION
UNIT NUMBER TAG
FE
CO
GENERAL PLUMBING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45o OR 90o
BOTTOM CONNECTION, 45o OR 90o
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
POINT OF CONNECTION BETWEEN NEW AND EXISTING
WORK
LIMIT OF DEMOLITION
INVERTED BUCKET TRAP SET INCLUDING PIPING
ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING STRAINER
PIPING ACCESSORIES
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
CLEAN OUT
HOSE BIB
AV
GATE VALVE
GLOBE VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE / TEMPERATURE)
AUTOMATIC AIR VENT
PLUMBING VALVE SYMBOLS
A. COORDINATE INSTALLATION OF PLUMBING SYSTEMS WITH ALL OTHER SYSTEMS. ANY
COST DUE TO LACK OF COORDINATION OF THIS SYSTEM WITH OTHER SYSTEMS WILL BE
THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE AREA TO BECOME
FAMILIAR WITH THE EXISTING CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF
EXISTING UTILITIES PRIOR TO CONSTRUCTION. ROUTE PIPING AND CONNECT AS
REQUIRED.
C. DO NOT ROUTE ANY SYSTEMS OVER EXISTING AND/OR NEW ELECTRICAL AND/OR IT AND
TELECOMMUNCIATIONS ROOMS.
D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS, CEILING, ETC. WHERE
REQUIRED FOR NEW CONSTRUCTION. PATCHING SHALL MATCH EXISTING CONSTRUCTION
& FINISHES. COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT.
E. PROVIDE VALVE TAGS & PLASTIC LAMINATE IDENTIFICATION ON CEILING FOR ALL NEW
AND EXISTING VALVES AND EQUIPMENT LOCATED WITHIN THE CONSTRUCTION LIMITS AS
INDICATED IN THE SPECIFICATIONS.
F. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
G. CONTRACTOR IS TO VERIFY THE PRESENCE OF EXISTING CONDUIT IN THE EXISTING
FLOOR SLABS PRIOR TO ANY WORK TAKING PLACE.
PLUMBING GENERAL NOTES
SCALE: ??
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:1
A M
P000
PLUMBING SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
PLUMBING DEMOLITION GENERAL NOTES
A. SEE SHEET P000 FOR GENERAL NOTES.
B. SOME COMPONENTS OF EXISTING SYSTEMS MAY HAVE CODE VIOLATIONS
BEFORE AND DURING DEMOLITION, PARTICULARLY ABOVE CEILINGS, BEHIND
CHASE WALLS, IN-WALL, AND ABOVE AND BELOW PRIMARY SPACES TO BE
DEMOLISHED WHEN NOT DOCUMENTED ON DRAWINGS, AND NOT OBSERVED
DURING SITE WALK-THROUGH.
PLUMBING DEMOLITION PLAN NOTES
1. REMOVE PORTION OF EXISTING 3" CW PIPING FOR NEW PIPING.
CA
CB
C
D
E
17.1717.16
F
G
H
L C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
A
SOUTH
B D
BUILDING 6 BASEMENT KEY PLAN
N
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
C
SOUTH
C
NORTH
A
NORTH
M
N
O
P
17.1717.16
L
CORRIDOR C
CB12
3" CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:1
A M
PD100
BASEMENT - C WING - PLUMBING
DEMOLITION PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
NN
SCALE: 1/8" = 1'-0"PD100
1 BASEMENT - C WING NORTH - PLUMBING DEMOLITION PLAN
NN
SCALE: 1/8" = 1'-0"PD100
2 BASEMENT - C WING SOUTH - PLUMBING DEMOLITION PLAN
PLUMBING PIPING PLAN NOTES
1. CONNECT NEW 4" SAN PIPING INTO EXISTING MAIN IN THIS AREA.
2. CONNECT NEW 3" CW PIPING INTO EXISTING MAIN AT THIS LOCATION.
3. INSTALL NEW 2" SUMP PUMP DISCHARGE PIPING OUTSIDE AT 18 INCHES
ABOVE GRADE. PROVIDE CONCRETE SPLASH BLOCK AND TURN ELBOW
DOWN OVER BLOCK. PROVIDE INSECT SCREEN OVER OPENING.
PLUMBING PIPING GENERAL NOTES
A. SEE SHEET P000 FOR GENERAL NOTES.
B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED
AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
M
N
O
P
17.1717.16
L
M A
T C
H L
IN
E
B -W
IN
G
C -W
IN
G
CORRIDOR C
CB12
3" CW
3" CW
CA
CB
C
D
E
17.1717.16
F
G
H
L
B -W
IN
G
C -W
IN
G
CORRIDOR
CB40
TRAINING
CB45
TRAINING
CB48
TRAINING
CB46
TRAINING
CB43
TRAINING
CB44
TRAINING
CB41
CIRC.
CB23
ELEV. LOBBY
CB22
ELEV.
C2-P VESTIBULE
CB24
STORAGE
CB15
ELEC. ROOM
CB16
DHW / UTILITY
CB21
MECHANICAL
CB42
VESTIBULE
CB50
STORAGE
CB18
3" CW
PP400
SP-C2-P
3/4" HWR
1 1/4" HW
3" CW
P-606
2 1/2" CW,
1" HW,
3/4" HWR UP
1 1/4" CW
1 1/4" HW
3/4" HWR
3" CW
2" CW
3/4" HW
1/2" HWR
2 1/2" CW
1" HW
3/4" HWR
ISOLATION
VALVE
ISOLATION
VALVE
ISOLATION
VALVE
WOMENS RR
CB19-A
MENS RR
CB19-B
PP400
2" CW
3/4" HW
1/2" HWR
4" SAN
4" SAN1
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
A
SOUTH
B D
BUILDING 6 BASEMENT KEY PLAN
N
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
C
SOUTH
C
NORTH
A
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:2
A M
PP100
BASEMENT - C WING - PLUMBING
PIPING PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
NN
SCALE: 1/8" = 1'-0"PP100
1 BASEMENT - C WING SOUTH - PLUMBING PIPING PLAN
SCALE: 1/8" = 1'-0"PP100
2 BASEMENT - C WING NORTH - PLUMBING PIPING PLAN - WATER
PLUMBING PIPING GENERAL NOTES
A. SEE SHEET P000 FOR GENERAL NOTES.
B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED
AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
PLUMBING PIPING PLAN NOTES #
1. RECONNECT EXISTING PLUMBING UTILITIES TO NEW PLUMBING FIXTURE.
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
B D
BUILDING 6 FIRST FLOOR KEY PLAN
N
SHADE INDICATES AREA
NOT IN SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
A
SOUTH
C
SOUTH
C
NORTH
A
NORTH
CA
CB
C
D
E
17.1717.16
F
G
H
L
ELEV. LOBBY
C120
ELEV.
C2-P
BREAK AREA
C118
SECURITY
C118-A
STORAGE
C119-C
CORRIDOR
C115B
B -W
IN
G
C -W
IN
G
C -W
IN
G
D -W
IN
G
PP400
BREAK AREA
C118
MENS RR
C119-BWOMENS RR
C119-A
2 1/2" CW
1" HW
3/4" HWR
2 1/2" CW,
1" HW,
3/4" HWR DN
ISOLATION
VALVE
ISOLATION
VALVE
PP400
P-606
P-413
1/2" HWR
1/2" HW
1/2" CW
M
N
O
P
17.1717.16
L
C106
B -W
IN
G
C -W
IN
G
C -W
IN
G
D -W
IN
G
M
N
17.1717.16
OFFICE
C304
OFFICE
C302
CORRIDOR
C3A
RESTROOM
C301-A
P-401
P-103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:2
A M
PP102
FIRST AND THIRD FLOORS - C
WING - PLUMBING PIPING PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
NN
SCALE: 1/8" = 1'-0"PP102
1 FIRST FLOOR - C WING NORTH - PLUMBING PIPING PLAN
SCALE: 1/8" = 1'-0"PP102
2 FIRST FLOOR - C WING SOUTH - PLUMBING PIPING PLAN
Revisions: Date:
SCALE: 1/8" = 1'-0"PP102
3 THIRD FLOOR - C-WING - PLUMBING PIPING PLAN
T T
T
TT
G
H
DWH-CB21 HWCP-CB21
P-202
P-201
P-103
P-103P-103
P-103
P-103
P-103
P-404 P-404 P-404 P-404
3/4" HW
2" CW
OFFSET UP
ISOLATION
VALVE ISOLATION
VALVE
1 1/4" CW
1 1/4" HW
3/4" HWR
3/4" HWR
1 1/4" HW
1 1/4" CW
P-FD-D P-FD-D
2" CW 2" CW
1 1/2" CW 1 1/2" CW
2" CW 2" CW
2" CW
3/4" HW
1/2" HWR
2" CW
2" CW
1 1
3 3
P-FD-D
DHW / UTILITY
CB21
MENS RR
CB19-B
WOMENS RR
CB19-A
G
H
P-413
P-202
P-201
P-103
P-103
P-103
P-103
P-103
P-103
P-404
P-404
P-404 P-404
2" CW
3/4" HW
1/2" HWR
2" CW
2" CW
2" CW
3/4" HW
1/2" HWR
2" CW 2" CW
2" CW 2" CW
1 1/2" CW
1 1/2" CW
1 1
ISOLATION
VALVE
ISOLATION
VALVE
WOMENS RR
C119-A
MENS RR
C119-B
STORAGE
C119-C
G
H
P-FD-D
DWH-CB21
HWCP-CB21
DHW / UTILITY
CB21
MENS RR
CB19-B
WOMENS RR
CB19-A
4"V UP
4"SAN UP
P-103
P-103
P-103
P-FD-D P-FD-D
P-103
P-201
P-202
P-103 P-103
4" SAN
4" SAN
2" V
2" V
4" SAN
FCO
4" SAN
G
H
STORAGE
C119-C
MENS RR
C119-B
WOMENS RR
C119-A
P-103
P-103
P-103P-103
P-103
P-103 P-202
P-201
P-404 P-404 P-404 P-404
4"V UP/DN4"SAN DN
4" SAN
2" V
2" V
4" SAN
4"V UP TO
4' VTR
P-FD-D P-FD-D
2" SAN
1 1/2" V
PLUMBING PIPING PLAN NOTES
1. 1-1/2" CW DOWN TO WATER CLOSET. PROVIDE WATER HAMMER ARRESTOR
AT WATER CONNECTION. INSTALL IN ACCESSIBLE LOCATION. INSTALL PER
MANUFACTURER'S REQUIREMENTS.
2. 1" CW DOWN TO URINAL. PROVIDE WATER HAMMER ARRESTOR AT WATER
CONNECTION. INSTALL IN ACCESSIBLE LOCATION. INSTALL PER
MANUFACTURER'S REQUIREMENTS.
3. 1/2" CW, 1/2" HW, 1/2" HWR DOWN TO LAVATORY. INSTALL HWR TO WITHIN 12
INCHES OF HW MIXING VALVE CONNECTION TO LAVATORY.
4. 1/2" CW, 1/2" HW DOWN TO SINK. INSTALL HWR TO WITHIN 12 INCHES OF HW
MIXING VALVE CONNECTION TO SINK.
5. INSTALL FULL LINE SIZE WALL CLEANOUT APPROXIMATELY 12 INCHES A.F.F.
COORDINATE WITH WALL MATERIAL AND CENTER IN TILE, WHERE
NECESSARY.
6. PROVIDE MAIN MASTER THERMOSTATIC MIXING VALVE NEAR WATER
HEATER.
PLUMBING PIPING GENERAL NOTES
A. SEE SHEET P000 FOR GENERAL NOTES.
B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED
AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:3
A M
PP400
PLUMBING ENLARGED PLANS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"PP400
1 BASEMENT - C WING NORTH - ENLARGED PLUMBING PIPING PLAN - DOMESTIC WATER
SCALE: 1/4" = 1'-0"PP400
2 FIRST FLOOR - C WING NORTH - ENLARGED PLUMBING PIPING PLAN - DOMESTIC WATER
N
N
SCALE: 1/4" = 1'-0"PP400
3 BASEMENT - C WING NORTH - ENLARGED PLUMBING PIPING PLAN WASTE/VENT
SCALE: 1/4" = 1'-0"PP400
4 FIRST FLOOR - C WING NORTH - ENLARGED PLUMBING PIPING PLAN WASTE/VENT
N
EXTERIOR SIDE OF CONCRETE
WALL
1/4" STEEL PLATE WATER
STOP & ANCHOR COLLAR
FLEXIBLE EXPANSION JOINT
MIN. DEFLECTION 15"
MIN. EXPANSION 4"
RESILIENT WATERPROOF
CAULKING
5/8"
ROD
WELD
PIPE CENTERED IN
SLEEVE
1/4"x1/4"
IRON
PIPE CLAMP
STANDARD
WEIGHT GAL.
STEEL PIPE
SLEEVE
1/4"x1/4"
IRON
PIPE STRAP
MODULAR TYPE
WALL
PENETRATION
SEAL
FLANGED
CONNECTION
INTERIOR SIDE
OF WALL
STAINLESS STEEL BOLTS,
NUTS & WASHERS
2"
FLASHING MEMBRANE, MIN.
24" SQUARE 2 1/2 LB. TO 4 LB.
LEAD OR 16 OZ. COPPER.
ADJUSTABLE NICKEL
BRONZE STRAINER
WITH 4" FLANGE (FLUSH WITH
FINISHED FLOOR)
WEEP HOLES
COMPOSITION FLOORING
NOTE:
1. SLOPE MEMBRANE LINER 2% TO DRAIN.
2. PROVIDE FLASHING MEMBRANE WHEN DRAIN IS INSTALLED IN A NON MEMBRANE FLOOR
INVERTIBLE
FLASHING COLLAR
LOOSE
GRAVEL AT
WEEP HOLES
CAULKED, NO-HUB
OR THREADED CONNECTION
WIDE
FLANGE
INSTEAD OF USING A DOUBLE NUT - A
PIPE SLEEVE OVER ROD MAY BE USED
HANGER ROD
SUPPORT FOOT
BOLT TO FLOOR
(TYPICAL)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
35% SCHEMATIC DESIGN 11/20/2020
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:3
A M
PP500
PLUMBING DETAILS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/8" = 1'-0"PP500
1 PIPE PENETRATION THROUGH WALLS BELOW GRADE
SCALE: 3/8" = 1'-0"PP500
2 TYPE "D" FLOOR DRAIN DETAIL
SCALE: 3/8" = 1'-0"PP500
4 INSTALLATION OF HANGER SUPPORT FOOT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/1 /2
:4
:3
A M
PP600
PLUMBING SCHEDULES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
PLUMBING FIXTURE SCHEDULE
MARK FIXTURE TYPE DESCRIPTION
CONNECTION SIZES (IN)
CW HW WASTE VENT
P-103 WATER CLOSET WATER CLOSET (WALL HUNG, ASME A112.19.2) OFFICE AND INDUSTRIAL, ELONGATED BOWL, SIPHON JET 4.8 L (1.28 GALLONS) PER FLUSH, WALL OUTLET. TOP OF SEAT SHALL BE BETWEEN 400 MM AND 432 MM (16 INCHES AND 17 INCHES) ABOVE FINISHED FLOOR. HANDICAPPED WATER CLOSET SHALL HAVE SEAT SET 450 MM (18 INCHES) ABOVE FINISHED FLOOR.
1.SEAT: INSTITUTIONAL/INDUSTRIAL, EXTRA HEAVY DUTY, CHEMICAL RESISTANT, SOLID PLASTIC, OPEN FRONT LESS COVER FOR ELONGATED BOWLS, INTEGRALLY MOLDED BUMPERS, CONCEALED CHECK HINGE WITH STAINLESS STEEL POST. SEAT
SHALL BE POSTURE CONTOURED BODY DESIGN. COLOR SHALL BE WHITE.
2.FITTINGS AND ACCESSORIES: GASKETS-NEOPRENE; BOLTS WITH CHROMIUM PLATED CAPS NUTS AND WASHERS AND
CARRIER.
3.FLUSH VALVE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED BRASS VALVE BODY, EXPOSED CHROME PLATED, NON-HOLD OPEN ADA APPROVED SIDE OSCILLATING HANDLE, WATER SAVER DESIGN PER FLUSH WITH MAXIMUM 10 PERCENT VARIANCE, 25 MM (1 INCH) SCREWDRIVER BACK CHECK ANGLE STOP WITH VANDAL RESISTANT CAP, ADJUSTABLE TAILPIECE, A HIGH BACK PRESSURE VACUUM BREAKER, SPUD COUPLING FOR 40 MM (1-1/2 INCHES) TOP SPUD, WALL AND SPUD FLANGES, SOLID-RING PIPE SUPPORT, AND SWEAT SOLDER ADAPTER WITH COVER TUBE AND SET SCREW WALL FLANGE.
VALVE BODY, COVER, TAILPIECE AND CONTROL STOP SHALL BE IN CONFORMANCE WITH ASTM ALLOY CLASSIFICATION FOR SEMI-RED BRASS. SEAT BUMPERS SHALL BE INTEGRAL PART OF FLUSH VALVE. SET CENTERLINE OF INLET 292 MM (11-1/2
INCHES) ABOVE SEAT.
1 1/2 - 4 2
P-201 URINAL URINAL (WALL HUNG, ASME A112.19.2) BOWL WITH INTEGRAL FLUSH DISTRIBUTION, WALL TO FRONT OF FLARE 343 MM (13.5 INCHES) MINIMUM. WALL HUNG WITH INTEGRAL TRAP, SIPHON JET FLUSHING ACTION 1.9 L (0.5 GALLONS) PER FLUSH WITH 50
MM (2 INCHES) BACK OUTLET AND 20 MM (3/4 INCH) TOP INLET SPUD.
1.SUPPORT URINAL WITH CHAIR CARRIER AND INSTALL WITH RIM 600 MM (24 INCHES) ABOVE FINISHED FLOOR.
2.FLUSHING DEVICE: LARGE CHLORAMINES RESISTANT DIAPHRAGM, SEMI-RED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .