MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf

PDF 458 KB Posted

Attached to
Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
Solicitation number
36C77622B0017
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This mechanical HVAC plan and federal contract opportunity are for the construction of an EHRM training and admin space support project located at 5000 West National Avenue in Milwaukee, Wisconsin. The mechanical HVAC plan details the layout of the new and existing HVAC system in the basement and first three floors of the C Wing at the project site. It includes specifications for new air handling units, ductwork, dampers, electric wall heaters, condensing units and other mechanical equipment. The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin for construction services in support of the EHRM training and admin space located in Milwaukee under solicitation number 36C77622B0017. Responses were due by February 10, 2022 and award is anticipated to be made in the near future.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
36C77622B0017 0004.pdf PDF
Drawing Changes 3-23-22.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
Technical Questions - Milwaukee EHRM 3-23-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
Question 74 Porch Detail.pdf PDF
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 6 - Drawings 3 of 4.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 3 - Final SOW - 1-27-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA

CB

C

D

E

17.1717.16

F

G

H

L

B -W

IN

G

C -W

IN

G

CORRIDOR

CB40

TRAINING

CB45

TRAINING

CB48

TRAINING

CB46

TRAINING

CB43

TRAINING

CB44

TRAINING

CB41

CIRC.

CB23

ELEV. LOBBY

CB22

ELEV.

C2-P

VESTIBULE

CB24

STORAGE

CB15

ELEC. ROOM

CB16CIRC.

CB17

DHW / UTILITY

CB21

VESTIBULE

CB50

STORAGE

CB18

WOMENS RR

CB19-A

MENS RR

CB19-B

MM400

36x12 RA

36x12 SA x R

A

16x10 EA 16x16 EA 16x16 EA UP

8 8

EG24

EG24

EG24

250EG24

1(TYP-4)

EWH-CB21

VESTIBULE

CB22A

CU-CB42

STAIR

CB4

STORAGE

CB49

ECH-CB49

x

8x8

SD8

150LSD36-6

LSD36-6

SD8

SD8

x

10x6

CU-C121

x R

A

SG12/4

150 UP VAV-CB41

916x10 x

RG36/10

SG12/4

SG12/4

SD6

SD6

SD6

SD6

x

RG12/8

SD6

SD6

SD6

SD6

VAV-CB44

16x10 x x

SG12/4

SG12/4

SG12/4

9 16x10 x x

SD6

SD6

SD6

SD6

SG12/4

SG12/4

SG12/4

SD6

SD6

SD6

SD6

VAV-CB46

x x

12x4

16x109

VAV-CB48

SG12/4

SG12/4

SG12/4

SG12/4

SG12/4

SG12/4

SD6

SD6

SD6

SD6

VAV-CB45

16x10 x x

VAV-CB43

916x10 x x 0 6

SD6

SD6

SD6

SD6

SG12/4

SG12/4

SG12/4

UP

UP

UP

UP

UP

RG36/10

RG36/10

RG36/10

RG36/10

RG36/10

x S

A

CU-C126

EX. CU

x R

A x R

A

MM500

x x

IT ROOM

CB18-C

CUH-CB50

CUH-CB4

CUH-CB22A

CUH-CB24

MECHANICAL

CB42

SG24/6

SG10/6

RG16/6

RG16/6

RG30/8

RG30/8

24x6 x

SG16/4

24x8

HWC-CB17

HWC-CB16

10x6

SG10/4

x

HWC-CB19A

450 HWC-CB19B

16x8 SA

SG10/4

SG10/4

10x4 18x6 x

HWC-CB23

18x6 SA x S

A

UP

UP

24x10 SA

16x4

10x4

SG12/4

8x6

28x16 SA

RG30/10

RG12/8

200 12x8

24x12 RA x R

A

24x6 SA

24x8 SA

26x12 SA x S

A

A

SOUTH

B D

BUILDING 6 BASEMENT KEY PLAN

N

SHADE INDICATES

AREA NOT IN

SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

C

SOUTH

C

NORTH

A

NORTH

M

N

O

P

17.1717.16

L

M A

T C

H L

IN

E

B -W

IN

G

C -W

IN

G

FM OFFICE

CB05

CIRC.

CB08

38x16 UP x

MECHANICAL HVAC GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED

AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.

MECHANICAL HVAC PLAN NOTES

1. VOLUME DAMPERS SHALL BE ACCESSIBLE AFTER MAIN DUCT INSTALLATION.

2. INSTALL ELECTRIC WALL HEATER WITH BOTTOM AT 12 INCHES AFF.

3. CONNECT NEW DUCTWORK TO EXISTING DUCTWORK IN THIS LOCATION.

4. PROVIDE TRANSFER AIR DUCT AND GRILLES BETWEEN ROOM AND

CORRIDOR.

5. INSTALL TIGHT TO BOTTOM OF STRUCTURE ABOVE.

6. INSTALL NEW CONDENSING ON CONCRETE PAD. PAD DIMENSIONS SHALL BE

4 INCHES LARGER THAN EQUIPMENT FOOTPRINT. COORDINATE WITH CIVIL

DRAWINGS FOR CONCRETE PAD DETAIL.

7. ALL EXPOSED SUPPLY AND RETURN DUCTWORK CONNECTED TO AHU-CB42

SHALL BE INSULATED PER SPECIFICATION SECTION 23 07 11.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/2

/2

:1

:0

A

M

MH100

BASEMENT - C WING -

MECHANICAL HVAC PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MH100

1 BASEMENT - C WING NORTH - MECHANICAL HVAC PLAN

N

N

SCALE: 1/8" = 1'-0"MH100

2 BASEMENT - C WING SOUTH - MECHANICAL HVAC PLAN

Revisions: Date:

Revision 1 03/21/2022

Sheets
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN
MM500 - MECHANICAL DETAILS
MM600 - MECHANICAL SCHEDULES
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN

File details come from the government source that posted it. Updated .