Attachment 3 - Final SOW - 1-27-22.pdf

PDF 296 KB Posted

Attached to
Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
Solicitation number
36C77622B0017
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This statement of work outlines construction services required for the EHRM Training and Admin Space Support Project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project consists of renovations to multiple buildings to meet EHRM upgrades for the hospital. Work includes renovations to areas in Buildings 6 and 20 and must be completed within 355 calendar days of receiving the notice to proceed. Key deliverables during construction include a logistics plan, construction security plan, construction phasing plan, submittal registry, accident prevention plan, construction schedule, schedule of values, and inspection and approval documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
Technical Questions - Milwaukee EHRM 3-23-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf PDF
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
36C77622B0017 0004.pdf PDF
Drawing Changes 3-23-22.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
Question 74 Porch Detail.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 6 - Drawings 3 of 4.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clement J. Zablocki VA Medical Center

EHRM Training and Admin Space Support

Project 695‐21‐703

Scope of Work

January 27, 2022

US Department of Veterans Affairs

Clement J. Zablocki VA Medical Center

5000 W. National Ave.

Milwaukee, WI 53295‐0001

STATEMENT OF WORK

Prepared by:

Facility Management Division

PROJECT NO: 695‐21‐703

PROJECT NAME: EHRM Training and Admin Space Support

I. General Description:

Provide Construction Services for Project#: 695‐21‐703 EHRM Training and Admin Space Support

II Project Scope:

1. Statement of Bid Items:

Item I, General Construction, Buildings 6 and 20:

1. Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project # 695‐21‐703: EHRM Training and Admin Space Support at Clement J.

Zablocki VA Medical Center, 5000 West National Avenue, Milwaukee, WI.

2. Project consists of renovations to:

a. Building 6, A‐Wing North First Floor

b. Building 6, C‐Wing North Basement

c. Building 6, C‐Wing First Floor

d. Building 6, C‐Wing South Basement through Third Floor

e. Building 20 Third Floor West for required EHRM upgrades for the hospital.

3. All work shall be completed within 355 calendar days after receiving Notice to Proceed.

III Schedule/Phasing:

This project shall be completed within Three Hundred Fifty‐Five (355) calendar days once NTP is issued.

Phase 1: Pre‐construction (kick‐off) Meeting is anticipated to be scheduled on the effective date identified in the Notice to Proceed (NTP).

Phase 2: Pre‐Construction Period duration is NTP + 30 calendar days (not to exceed). Within this period the contractor shall submit the following (as applicable per the specification requirements):

1. Logistics Plan.

2. Construction Security Plan.

3. Construction Phasing Plan.

4. Submittal Registry.

5. Accident Prevention Plan.

6. Activity Hazard Analyses.

7. Construction Schedule.

8. Schedule of Values.

9. Existing Conditions Survey.

10. Infection Control Plan.

11. Quality Control Plan.

12. Environmental Protection Plan.

13. Document Submissions.

14. Demolition Debris Management Plan.

15. Certificates, Licenses, and Training Documents.

16. Obtain PIV badges.

PROJECT NO: 695‐21‐703

PROJECT NAME: EHRM Training and Admin Space Support

Phase 3: Pre‐Construction VA Review Period. Phase 3 is anticipated to be 30 calendar days and shall be completed no later than NTP + 60 calendar days. Within this period the VA shall complete all review and approvals of contractor Pre‐Construction submittals.

Phase 4: Construction Period Phase duration is anticipated to be 250 days; to be completed no later than NTP + 310. All applicable documentation listed in Phases 2 and 3 and any necessary submittals required to mobilize must be approved by the COR prior to commencing work. No demolition or construction shall be started without COR review and approval of those items listed in the Pre‐Construction Period unless authorized in writing by the COR or the CO. Should naturally occurring weather delays occur, the contractor shall restart construction immediately once conditions permit.

Phase 5: Post‐Substantial Completion Period duration is NTP + 355 calendar days. The contractor shall provide all required materials to include the following within 45 days of completion of Phase 4.

1. Inspection and Approval by the COR and/or the CO.

2. Final Approval and Beneficial Occupancy when applicable.

3. Warranties documents and O&M Manuals.

4. As‐built drawings and record submittals.

5. Staff training when applicable.

6. Waste Reports.

7. Existing Conditions Re‐survey.

8. Release of Claims.

‐‐ End SOW ‐‐

File details come from the government source that posted it. Updated .