About this file

This mechanical piping plan drawing provides specifications for upgrades to the piping system in the first floor C wing at the EHRM Training and Admin Space Support facility in Milwaukee, Wisconsin. The drawing notes call for connecting 1-1/2 inch domestic hot water supply and return piping to the existing system, leaving existing steam and condensate piping in place in the chase, and installing a 3-way valve for hot water loop circulation and VFD turndown control. System components to be re-supported after demolition are also identified. Zones to be served by variable air volume boxes and hot water converters are labeled on the drawing.

The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin seeking proposals to complete construction work for the EHRM Training and Admin Space Support project located at 5000 West National Avenue in Milwaukee, Wisconsin. Offerors are invited to submit bids in response to solicitation number 36C77622B0017 by the closing date of November 12, 2021. The supporting documents provide additional requirements and specifications for the mechanical, electrical, and general construction work required.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
Technical Questions - Milwaukee EHRM 3-23-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf PDF
36C77622B0017 0004.pdf PDF
Drawing Changes 3-23-22.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
Question 74 Porch Detail.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 3 - Final SOW - 1-27-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 6 - Drawings 3 of 4.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T T

T

T T

T

T

T

T T

T

T

T

T

T

T

T

MECHANICAL PIPING GENERAL NOTES

A. REFER TO SHEET M000 FOR GENERAL NOTES.

B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED

AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.

MECHANICAL PIPING PLAN NOTES #

1. PROVIDE 1-1/2" HHWS/R CONNECTION TO EXISTING PIPING IN THIS AREA.

2. EXISTING STEAM/CONDENSATE PIPING SHALL REMAIN IN CHASE.

3. PROVIDE 3-WAY VALVE FOR HEATING HOT-WATER LOOP CIRCULATION AND

VFD TURNDOWN.

C-WING KEY PLAN

N

DARK SHADE INDICATES

AREA NOT IN SCOPE, TYP

PROJECT LOCATION:

BASEMENT & FIRST FLOOR

PROJECT LOCATION:

ALL FLOORS

PROJECT LOCATION:

FIRST FLOOR

C

B D

BUILDING 6 FIRST FLOOR KEY PLAN

N

SHADE INDICATES AREA

NOT IN SCOPE, TYP

NO SHADE INDICATES

LOCATION OF PROJECT,

TYP

A

SOUTH

C

SOUTH

C

NORTH

A

NORTH

CA

CB

C

D

E

17.1717.16

F

G

H

L

TRAINING

C145

TRAINING

C143

TRAINING

C141

TRAINING

C148

TRAINING

C146

TRAINING

C144

WAITING

C142

CORRIDOR

C140

WOMENS RR

C119-A

ELEV. LOBBY

C120

ELEV.

C2-P

BREAK AREA

C118

SECURITY

C118-A

TRAINING

C106-C

STAIR C2

C2

IT ROOM

C118-B

STORAGE

C119-C

CORRIDOR

C115B

CIRC.

C116

MECHANICAL

C126

CONFERENCE ROOM

C124-A

WAITING

C124

DSS-C121

EWH-C119C

EF-C119C

VAV-C148

VAV-C146

VAV-C144

VAV-C143

VAV-C145

VAV-C141

HWC-C106C

VAV-C142

EX. REFRIGERANT

PIPING UP/DN

2" HHWR DN

2" HHWS DN

REFRIGERANT

PIPING DN

2" HHWR

2" HHWS

1 1/2" HHWS

1 1/2" HHWR

3/4" HHWS

3/4" HHWR 1" HHWS

1" HHWR1" HHWS/R

TO BOX

1" HHWR

1" HHWS 1 1/4" HHWS

1 1/4" HHWR

3/4" HHWS

3/4" HHWR

1 1/2" HHWS

1 1/2" HHWR

1" HHWS/R

TO BOX

1 1/2" HHWR

1 1/2" HHWS

1 1/2" HHWR

1 1/2" HHWS

3/4" HHWS

3/4" HHWR

3/4" HHWS/R

TO BOX

3/4" HHWS/R

TO BOX

1 1/2" HHWS

1 1/2" HHWR

1 1/2" HHWS

1 1/2" HHWR

MM500

VAV-C148

3.0

HWC-C119A HWC-C119B

HWC-C118A

VAV-C145

3.8

VAV-C146

3.3

VAV-C143

3.3

VAV-C144

2.5

VAV-C141

2.0

VAV-C142

1.0

HWC-C124

3.00

HWC-C119B

2.00

HWC-C119A

2.00

HWC-C106C

4.75

1" HHWS

1" HHWR

MM400

CUH-C4

2.75

3/4" HHWR

3/4" HHWS

3/4" HHWR

3/4" HHWS

1" HHWR

1" HHWS

1" HHWS

HWC-C124A

1.50

1" HHWR

HWC-C124A

3/4" HHWS

3/4" HHWR

1 1/4" HHWR

1 1/4" HHWS

3/4" HHWR

3/4" HHWS

HWC-C118

HWC-C118

2.75

HWC-C118A

0.75

HWC-C124

2" HHWR

2" HHWS

2" HHWS

2" HHWR

1" HHWR

1" HHWS

3/4" HHWS

3/4" HHWR

CUH-C4

DSS-C121

M

N

O

P

17.1717.16

L

C106

CORRIDOR

C115B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs \c h a w k \D o c u m e n ts

\1 .1

.2

M E

P v c h a w k D

D

W

.r v t

/2

/2

:2

:3

A

M

MP103

FIRST FLOOR - C WING -

MECHANICAL PIPING PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

EHRM TRAINING AND ADMIN

SPACE SUPPORT

5000 West National Avenue, Milwaukee, WI 53295

695-21-703

11/12/2021 CDH AJS

100% BID DOCUMENTS

FULLY SPRINKLERED

NN

SCALE: 1/8" = 1'-0"MP103

1 FIRST FLOOR - C WING NORTH - MECHANICAL PIPING PLAN

SCALE: 1/8" = 1'-0"MP103

2 FIRST FLOOR - C WING SOUTH - MECHANICAL PIPING PLAN

Revisions: Date:

Revision 1 03/21/2022

Sheets
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN

File details come from the government source that posted it. Updated .