This mechanical piping plan drawing provides specifications for upgrades to the piping system in the first floor C wing at the EHRM Training and Admin Space Support facility in Milwaukee, Wisconsin. The drawing notes call for connecting 1-1/2 inch domestic hot water supply and return piping to the existing system, leaving existing steam and condensate piping in place in the chase, and installing a 3-way valve for hot water loop circulation and VFD turndown control. System components to be re-supported after demolition are also identified. Zones to be served by variable air volume boxes and hot water converters are labeled on the drawing.
The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin seeking proposals to complete construction work for the EHRM Training and Admin Space Support project located at 5000 West National Avenue in Milwaukee, Wisconsin. Offerors are invited to submit bids in response to solicitation number 36C77622B0017 by the closing date of November 12, 2021. The supporting documents provide additional requirements and specifications for the mechanical, electrical, and general construction work required.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T T
T
T T
T
T
T
T T
T
T
T
T
T
T
T
MECHANICAL PIPING GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED
AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
MECHANICAL PIPING PLAN NOTES #
1. PROVIDE 1-1/2" HHWS/R CONNECTION TO EXISTING PIPING IN THIS AREA.
2. EXISTING STEAM/CONDENSATE PIPING SHALL REMAIN IN CHASE.
3. PROVIDE 3-WAY VALVE FOR HEATING HOT-WATER LOOP CIRCULATION AND
VFD TURNDOWN.
C-WING KEY PLAN
N
DARK SHADE INDICATES
AREA NOT IN SCOPE, TYP
PROJECT LOCATION:
BASEMENT & FIRST FLOOR
PROJECT LOCATION:
ALL FLOORS
PROJECT LOCATION:
FIRST FLOOR
C
B D
BUILDING 6 FIRST FLOOR KEY PLAN
N
SHADE INDICATES AREA
NOT IN SCOPE, TYP
NO SHADE INDICATES
LOCATION OF PROJECT,
TYP
A
SOUTH
C
SOUTH
C
NORTH
A
NORTH
CA
CB
C
D
E
17.1717.16
F
G
H
L
TRAINING
C145
TRAINING
C143
TRAINING
C141
TRAINING
C148
TRAINING
C146
TRAINING
C144
WAITING
C142
CORRIDOR
C140
WOMENS RR
C119-A
ELEV. LOBBY
C120
ELEV.
C2-P
BREAK AREA
C118
SECURITY
C118-A
TRAINING
C106-C
STAIR C2
C2
IT ROOM
C118-B
STORAGE
C119-C
CORRIDOR
C115B
CIRC.
C116
MECHANICAL
C126
CONFERENCE ROOM
C124-A
WAITING
C124
DSS-C121
EWH-C119C
EF-C119C
VAV-C148
VAV-C146
VAV-C144
VAV-C143
VAV-C145
VAV-C141
HWC-C106C
VAV-C142
EX. REFRIGERANT
PIPING UP/DN
2" HHWR DN
2" HHWS DN
REFRIGERANT
PIPING DN
2" HHWR
2" HHWS
1 1/2" HHWS
1 1/2" HHWR
3/4" HHWS
3/4" HHWR 1" HHWS
1" HHWR1" HHWS/R
TO BOX
1" HHWR
1" HHWS 1 1/4" HHWS
1 1/4" HHWR
3/4" HHWS
3/4" HHWR
1 1/2" HHWS
1 1/2" HHWR
1" HHWS/R
TO BOX
1 1/2" HHWR
1 1/2" HHWS
1 1/2" HHWR
1 1/2" HHWS
3/4" HHWS
3/4" HHWR
3/4" HHWS/R
TO BOX
3/4" HHWS/R
TO BOX
1 1/2" HHWS
1 1/2" HHWR
1 1/2" HHWS
1 1/2" HHWR
MM500
VAV-C148
3.0
HWC-C119A HWC-C119B
HWC-C118A
VAV-C145
3.8
VAV-C146
3.3
VAV-C143
3.3
VAV-C144
2.5
VAV-C141
2.0
VAV-C142
1.0
HWC-C124
3.00
HWC-C119B
2.00
HWC-C119A
2.00
HWC-C106C
4.75
1" HHWS
1" HHWR
MM400
CUH-C4
2.75
3/4" HHWR
3/4" HHWS
3/4" HHWR
3/4" HHWS
1" HHWR
1" HHWS
1" HHWS
HWC-C124A
1.50
1" HHWR
HWC-C124A
3/4" HHWS
3/4" HHWR
1 1/4" HHWR
1 1/4" HHWS
3/4" HHWR
3/4" HHWS
HWC-C118
HWC-C118
2.75
HWC-C118A
0.75
HWC-C124
2" HHWR
2" HHWS
2" HHWS
2" HHWR
1" HHWR
1" HHWS
3/4" HHWS
3/4" HHWR
CUH-C4
DSS-C121
M
N
O
P
17.1717.16
L
C106
CORRIDOR
C115B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/2
/2
:2
:3
A
M
MP103
FIRST FLOOR - C WING -
MECHANICAL PIPING PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
NN
SCALE: 1/8" = 1'-0"MP103
1 FIRST FLOOR - C WING NORTH - MECHANICAL PIPING PLAN
SCALE: 1/8" = 1'-0"MP103
2 FIRST FLOOR - C WING SOUTH - MECHANICAL PIPING PLAN
Revisions: Date:
Revision 1 03/21/2022
| Sheets |
| MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN |
File details come from the government source that posted it. Updated .