This document contains technical questions and responses related to solicitation number 36C77622B0017 for the Milwaukee EHRM Training and Admin Space Support Construction Project. The questions and answers cover various mechanical and control aspects of the project, including clarifying that certain VAVs listed in the schedule are actually hot water coils, confirming that freeze stats are required for each AHU to match the existing station standard, and specifying that individual supply air temperature sensors are not required at each VAV as the sensor at the main AHU can be used globally. Additional questions and responses address slab thickness assumptions, saw cutting details for in-slab piping removal and replacement, and a request for an updated DDC points list, which is provided on sheet MM700 of the drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
36C77622B0017 0004.pdf PDF
Drawing Changes 3-23-22.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
Question 74 Porch Detail.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 6 - Drawings 3 of 4.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 3 - Final SOW - 1-27-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND

RESPONSES TRACKING SHEET

SOLICITATION #

36C77622B0017

PROJECT TITLE

Milwaukee EHRM Training and Admin Space Support Construction Project

# RECEIVED

DATE

ANSWERED

DATE

CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS

36 2/28/22 3/22/22 VAVs C106-C thru C124-A are listed on the VAV schedule but not shown on the plans. Associated thermostat locations reference hot water coils and not VAVs. Are VAVs 106-C, C118, C118-A, C118-B, C124, and C124-A required? If yes, please identify locations on the plans.

It appears that they might have been scheduled as VAVs and not HWCs. These VAVs are not required as they are covered in the HWC schedule. Please see Sheet MM600, Mechanical Schedules attached.

37 2/28/22 3/22/22 Specification 23 09 23 Low temperature protection devices (freeze stats) are not shown on the AHU Schematic. Are freeze stats required?

Freeze stats are required for each AHU. This shall match the existing Station standard with the existing BAS. Please see Sheet MM700, Mechanical Control Systems.

38 2/28/22 3/22/22 Specification section 23 09 23 - The VAV schematic shows a SA-T before the VAV box. Supply temperature is measured at each AHU. Can this point be used globally as the supply air temperature to each VAV box, or are individual supply air temperature sensors required at every VAV?

The SA-T sensor at the main AHU is only required, and not at each VAV. This shall match the existing Station standard with the existing BMS.

43 2/28/22 3/22/22 Can a DDC points list/schedule be provided? The updated AHU Points list on sheet MM700, Mechanical Control Systems.

77 2/28/22 3/22/22 Question #: 33 Sheet: N/A Spec: N/A Topic: Slab thickness Question: Please provide a floor slab thickness to be assumed for all floor slabs within the work area of this project.

Do not assume existing slab thickness. Field Verify.

Assume 8” nominally for bidding purposes, but it will vary throughout

90 2/28/22 3/22/22 Question #: 46 Sheet: N/A Spec: N/A Topic: Saw Cutting Question: Please provide a detail showing areas of floor slab to be saw cut for new removal and replacement of in-slab piping.

See plumbing drawings for locations of in slab piping.

Most of the new plumbing in C-Wing North Basement will be in new infill. See plan note 24 on AE100.