Attachment 1 - Specifications Volume 1.pdf
PDF 5 MB Posted
- Attached to
- Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
- Solicitation number
- 36C77622B0017
About this file
This is an invitation for bid (IFB) solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin for an EHRM Training and Admin Space Support construction project located in Milwaukee, Wisconsin. The solicitation seeks bids for construction services to support project number 695-21-703. The work includes renovations and upgrades to Building 6 and Building 20 on the Milwaukee VA Medical Center campus. The estimated cost range for the project is between $5-10 million. Bids are due by February 24, 2022 and the contract is to be awarded by April 29, 2022. The solicitation includes standard FAR clauses for construction contracts along with special contract requirements for work on the VA medical center campus.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM Training and Admin Space Support Project # 695-21-703
For the Department of Veterans Affairs
Clement. J. Zablocki Veterans Medical Center Milwaukee, WI. 53295
PROJECT MANUAL
Bid Documents Submission
Volume 1 of 2
11/12/2021
GUIDON DESIGN INC.
FFE, INC.
PROJECT CONTACTS:
OWNER: CLEMENT J. ZABLOCKI VA MEDICAL CENTER
Attn: Andrew Jacobs 5000 W. National Avenue Milwaukee, Wisconsin 53295 Phone: 414.384.2000 x 47297 Email: andrew.jacobs3@va.gov
AE PROJECT MANAGER: GUIDON DESIGN INC.
Attn: David Vallandingham 1221 N. Pennsylvania Street Indianapolis, Indiana 46202 Phone: 317.800.6388 x 130 Email: dvallandingham@guidondesign.com
ARCHITECT: GUIDON DESIGN INC.
Attn: Tyler Sanders 1221 N. Pennsylvania Street Indianapolis, Indiana 46202 Phone: 317.800.6388 x 126 Email: swhitcomb@guidondesign.com
M/E/P ENGINEER: GUIDON DESIGN INC.
Attn: Chris Hawk 1221 N. Pennsylvania Street Indianapolis, Indiana 46202 Phone: 317.800.6388 x 167 Email: chawk@guidondesign.com
STRUCTURAL ENGINEER: GUIDON DESIGN INC.
Attn: Lauren Lai 1221 N. Pennsylvania Street Indianapolis, Indiana 46202 Phone: 317.800.6388 x 117 Email: llai@guidondesign.com
CIVIL ENGINEER: GUIDON DESIGN INC.
Attn: Chad Butler 1221 N. Pennsylvania Street Indianapolis, Indiana 46202 Phone: 317.800.6388 x 108 Email: cbutler@guidondesign.com
ELECTRICAL ENGINEER: FFE INC.
Attn: Jack Bonbright 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 Phone: 513-758-2220 Email: jack.bonbright@ffeinc.us
FIRE PROTECTION FFE INC.
ENGINEER: Attn: Greg Pearson
110 Boggs Lane, Suite 170 Cincinnati, OH 45246 Phone: 513-758-2245 Email: greg.pearson@ffeinc.us mailto:swhitcomb@guidondesign.com mailto:chawk@guidondesign.com mailto:llai@guidondesign.com
Great Lakes Acquisition Center (GLAC) 05-01-21 695-21-703 EHRM Training and Admin Space Support Bid Documents Milwaukee VAMC November 12, 2021
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21 01 01 10SN Special Notes 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 01-21
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
Milwaukee VAMC November 12, 2021
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 18 13 Pedestrian Traffic Coatings 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 51 69.11 Aluminum Storm Windows 01-21 08 71 00 Door Hardware 01-21 08 71 13.11 Low Energy Power Assist Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21 10 22 26.13 Accordion Folding Partitions 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
Milwaukee VAMC November 12, 2021
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18
DIVISION 14– CONVEYING EQUIPEMENT
14 24 10 Modernization of Hydraulic Elevator 08-20
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 29 Sump Pumps 09-15 22 33 00 Electric Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17
Milwaukee VAMC November 12, 2021
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 15 00 Communications Structured Cabling 01-16
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 13 Conductors and Cables for Electronic Safety and Security
10-18
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
Great Lakes Acquisition Center (GLAC) 05-01-20
Milwaukee VAMC November 12, 2021
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLANS - BASEMENT AND FIRST FLOOR
GI102 LIFE SAFETY PLANS - SECOND AND THIRD FLOOR
GC101 INFECTION CONTROL / CONSTRUCTION LOGISTICS PLAN
HA100 HAZMAT. ABATEMENT BUILDING 20 AND 6 BASEMENT PLAN
HA101 HAZMAT. ABATEMENT 1ST, 2ND, AND 3RD FLOOR PLAN
CIVIL
CI001 CIVIL GENERAL NOTES
CD101 SITE DEMOLITION PLAN
CD102 SITE DEMOLITION PLAN
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS501 SITE DETAILS
CG101 GRADING AND UTILITY PLAN
CG102 GRADING AND UTILITY PLAN
STRUCTURAL
SI001 STRUCTURAL GENERAL NOTES
SF101 BUILDING 6 STRUCTURAL PLAN - BASEMENT
SF102 BUILDING 6 STRUCTURAL PLAN - FIRST FLOOR
SF103 BUILDING 20 STRUCTURAL PLAN
SF501 STRUCTURAL SECTIONS AND DETAILS
ARCHITECTURAL
AD100 BASEMENT - A- WING AND C-WING - DEMOLITION PLANS
AD101 FIRST FLOOR - A-WING AND B-WING - DEMOLITION PLANS
AD102 FIRST FLOOR - C-WING - DEMOLITION PLANS
AD103 2ND AND 3RD FLOOR AND ROOF - C-WING DEMOLITION - PLANS
AD104 BUILDING 20 – THIRD FLOOR - DEMOLITION PLAN
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
Milwaukee VAMC November 12, 2021
00 01 15 - 2
AE002 WALL TYPES
AE100 BASEMENT - C-WING - ARCHITECTURAL PLAN
AE101 FIRST FLOOR - A-WING AND B WING - ARCHITECTURAL PLANS
AE102 FIRST FLOOR - C-WING - ARCHITECTURAL PLANS
AE103 SECOND & THIRD FLOOR - C-WING - ARCHITECTURAL PLANS
AE104 BUILDING 20 - ARCHITECTURAL PLAN
AE105 BUILDING 20 – THIRD FLOOR – ARCHITECTURAL PLAN
AE110 BASEMENT - C-WING - REFLECTED CEILING PLAN
AE111 FIRST FLOOR - A-WING NORTH - REFLECTED CEILING PLANS
AE112 FIRST FLOOR - C-WING - REFLECTED CEILING PLAN
AE113 SECOND & THIRD FLOOR - C-WING - REFLECTED CEILING PLANS
AE201 A-WING - PORCH - ELEVATIONS
AE321 A-WING WOOD STAIR & RAMP PLANS AND SECTIONS
AE322 A- WING AND C-WING - EXTERIOR STAIR PLANS & SECTIONS
AE323 C-WING - INTERIOR STAIR PLANS & SECTIONS
AE324 C-WING - ELEVATOR PLANS & ELEVATIONS
AE401 WALL SECTIONS
AE501 BUILDING DETAILS
AE601 DOOR AND WINDOW SCHEDULE
AI100 BASEMENT - C-WING - FINISH PLANS
AI101 FIRST FLOOR - A-WING AND B WING - FINISH PLANS
AI102 FIRST FLOOR - C-WING - FINISH PLANS
AI103 SECOND & THIRD FLOOR - C-WING - FINISH PLANS
AI201 INTERIOR FINISHES ENLARGED PLANS & ELEVATIONS
AI202 INTERIOR FINISHES ENLARGED PLANS & ELEVATIONS
AI501 INTERIOR FINISHES AND CASEWORK DETAILS
AI601 FINISH SCHEDULES
AI900 BASEMENT - C-WING - SIGNAGE PLANS
AI901 FIRST FLOOR - A-WING AND B WING- SIGNAGE PLANS
AI902 FIRST FLOOR - C-WING - SIGNAGE PLANS
AI903 SECOND & THIRD FLOOR - C-WING - SIGNAGE PLANS
AI904 INTERIOR SIGNAGE AND EQUIPMENT SCHEDULES
AI905 SIGNAGE TYPES
QH100 BASEMENT - C-WING - EQUIPMENT PLAN
QH101 FIRST FLOOR- A-WING AND C WING - EQUIPMENT PLAN
FIRE PROTECTION
Milwaukee VAMC November 12, 2021
00 01 15 - 3
FX101 BASEMENT FIRE SUPPRESSION PLAN - A-WING
FX102 BASEMENT FIRE SUPPRESSION PLAN - C-WING
FX103 FIRST FLOOR FIRE SUPPRESSION PLAN - A-WING
FX104 FIRST FLOOR FIRE SUPPRESSION PLAN - C-WING
FX105 SECOND & THIRD FLOOR FIRE SUPPRESSION PLAN
FX401 FIRE SUPPRESSION RISER SECTIONS
PLUMBING
P000 PLUMBING SYMBOLS AND ABBREVIATIONS
PD100 BASEMENT - C-WING - PLUMBING DEMOLITION PLAN
PP100 BASEMENT - C-WING - PLUMBING PIPING PLAN
PP102 FIRST FLOOR - C-WING - PLUMBING PIPING PLAN
PP400 PLUMBING ENLARGED PLANS
PP500 PLUMBING DETAILS
PP600 PLUMBING SCHEDULES
PP700 PLUMBING SCHEMATICS AND RISERS
MECHANICAL
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD100 BASEMENT - C-WING - MECHANICAL DEMOLITION PLANS
MD101 FIRST FLOOR - A-WING - MECHANICAL DEMOLITION PLAN
MD102 FIRST FLOOR - C-WING - MECHANICAL DEMOLITION PLANS
MD103 SECOND & THIRD FLOOR MECHANICAL DEMOLITION PLANS
MH100 BASEMENT - C-WING - MECHANICAL HVAC PLANS
MH101 FIRST FLOOR - A-WING - MECHANICAL HVAC PLANS
MH102 FIRST FLOOR - C-WING - MECHANICAL HVAC PLANS
MH103 SECOND AND THIRD FLOOR - C-WING - MECHANICAL HVAC PLANS
MP100 BASEMENT - A/B WING - MECHANICAL PIPING PLANS
MP101 BASEMENT - C-WING - MECHANICAL PIPING PLAN
MP102 FIRST FLOOR - A-WING - MECHANICAL PIPING PLANS
MP103 FIRST FLOOR - C-WING - MECHANICAL PIPING PLANS
MP104 SECOND AND THIRD FLOORS - C-WING - MECHANICAL PIPING PLANS
MM400 MECHANICAL ENLARGED PLANS
MM500 MECHANICAL DETAILS
MM501 MECHANICAL DETAILS
MM600 MECHANICAL SCHEDULES
MM700 MECHANICAL CONTROL SYSTEMS
Milwaukee VAMC November 12, 2021
00 01 15 - 4
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EDL100 BASEMENT - C-WING - LIGHTING DEMOLITION PLANS
EDL101 FIRST FLOOR - A-WING - LIGHTING DEMOLITION PLANS
EDL103 FIRST FLOOR - C-WING - LIGHTING DEMOLITION PLANS
EDL104 SECOND & THIRD FLOOR - C-WING - LIGHTING DEMOLITION PLANS
EDP100 BASEMENT - C-WING - POWER DEMOLITION PLANS
EDP101 FIRST FLOOR - A-WING - POWER DEMOLITION PLANS
EDP102 FIRST FLOOR - B-WING - POWER DEMOLITION PLAN
EDP103 FIRST FLOOR - C-WING - POWER DEMOLITION PLANS
EDP104 SECOND & THIRD FLOOR - C-WING - POWER DEMOLITION PLANS
EL100 BASEMENT - C-WING - LIGHTING PLANS
EL101 FIRST FLOOR - A-WING - LIGHTING PLANS
EL103 FIRST FLOOR - C-WING - LIGHTING PLANS
EL104 SECOND & THIRD FLOOR - C-WING - LIGHTING PLANS
EP100 BASEMENT - C-WING - POWER PLANS
EP101 FIRST FLOOR - A-WING - POWER PLANS
EP102 FIRST FLOOR - B-WING - POWER PLAN
EP103 FIRST FLOOR - C-WING - POWER PLANS
EP104 SECOND & THIRD FLOOR - C-WING - POWER PLANS
EP300 ELECTRICAL ENLARGED PLANS
EP400 ELECTRICAL ONE-LINE DIAGRAM
EP500 ELECTRICAL DETAILS
EP501 ELECTRICAL DETAILS
EP600 ELECTRICAL SCHEDULES
EP601 ELECTRICAL SCHEDULES
EP602 ELECTRICAL SCHEDULES
TELECOMMUNICATION
EX000 BASEMENT DEMOLITION PLANS - C-WING
EX001A FIRST FLOOR DEMOLITION PLAN - A-WING
EX001B FIRST FLOOR DEMOLITION PLAN - C-WING
EX002 SECOND FLOOR DEMOLITION PLAN - C-WING
EX003 THIRD FLOOR DEMOLITION PLAN - C-WING
ET500 TECHNOLOGY DETAILS
ET100 BASEMENT TECHNOLOGY PLAN - C-WING
Milwaukee VAMC November 12, 2021
00 01 15 - 5
ET101A FIRST FLOOR TECHNOLOGY PLAN - A-WING
ET101B FIRST FLOOR TECHNOLOGY PLAN - C-WING
ET102 SECOND FLOOR TECHNOLOGY PLAN - C-WING
ET103 THIRD FLOOR TECHNOLOGY PLAN - C-WING
EY100A BASEMENT AUXILIARY SYSTEMS PLANS - A-WING
EY100B BASEMENT AUXILIARY SYSTEMS PLAN - C-WING
EY101A FIRST FLOOR AUXILIARY SYSTEMS PLAN - A-WING
EY101B FIRST FLOOR AUXILIARY SYSTEMS PLAN - C-WING
EY102 SECOND FLOOR AUXILIARY SYSTEMS PLAN - C-WING
EY103 THIRD FLOOR AUXILIARY SYSTEMS PLAN - C-WING
- - - E N D - - -
VAMC Milwaukee 01-01-21
Milwaukee, WI 53295 November 12, 2021
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Normal working hours for this contract will be from 7:00AM to
4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays.
B. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
C. Visits to the site by Bidders may be made only as described in the solicitation in accordance with FAR 52.236-27 Site Visit
(Construction).
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Refer to Section 01 01 10-SN
SPECIAL NOTES for information security, fingerprint, badging, construction door access and parking requirements.
E. Routine Inspections and Maintenance During Construction
1. Provide routine inspections and maintenance services as prescribed in Operations & Maintenance manuals required under this contract.
2. Provide services during construction and until items below are completed:
a) VA Inspection Complete
b) Successful Commissioning.
c) Training of VA Maintenance staff
d) Acceptance by VA of each system described in other specifications related to this contract.
e) O&M Manual submittals received, reviewed, and approved by VA
3. Systems included in this contract are:
a) Elevators
b) Electrical Systems
Milwaukee, WI 53295 November 12, 2021
01 00 00 -2
c) Mechanical and Ventilation Systems to include Controls
d) Plumbing Systems
e) Doors/Hardware
f) Sprinkler (Fire Protection) Systems
g) Roofing Systems
F. Submit with O&M manuals [if phased work, submit at substantial completion of work phases and update upon completion of final work phase] one spreadsheet based comprehensive summary schedule of routine inspection and maintenance for systems. List:
specification section, article, and paragraph; description of systems/subsystems; O&M Manual reference; frequency.
G. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge. Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.
1.3 STATEMENT OF BID ITEM(S) – See SOW and Price Schedule
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the beta.SAM.gov website where the solicitation is posted. Hard copies will be the responsibility and expense of the Contractor.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
Milwaukee, WI 53295 November 12, 2021
01 00 00 -3
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. A Special Agreement SAC form is required for every contract employee. See the SPECIAL NOTES specification for an example of this SAC form. This needs to be supplied to the COR for every contract employee on the jobsite. Even if the contractor has an active badge, a SAC form is needed for the
COR’s records.
3. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
4. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
5. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Document Control:
1. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
Milwaukee, WI 53295 November 12, 2021
01 00 00 -4
2. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
3. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
4. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
D. Motor Vehicle Restrictions
1. Vehicle Permits shall be issued for General Contractor and its employees for parking in designated areas only. See the
SPECIAL NOTES Specification.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded
Milwaukee, WI 53295 November 12, 2021
01 00 00 -5 beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center and Cemetery as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to
Medical Center and Cemetery areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
Milwaukee, WI 53295 November 12, 2021
01 00 00 -6
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day
7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center
Director, COR and Contractor.
2. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Milwaukee, WI 53295 November 12, 2021
01 00 00 -7
Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, Milwaukee, WI 53295 November 12, 2021
01 00 00 -8 steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR and Chief Engineer. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification
Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28
05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the
Milwaukee, WI 53295 November 12, 2021
01 00 00 -9 construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
P. Coordination of Construction with Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the COR, in arranging construction schedule to cause the least possible interference with cemetery activities in actual burial areas.
Construction noise during the interment services shall not
Milwaukee, WI 53295 November 12, 2021
01 00 00 -10 disturb the service. Trucks and workers shall not pass through the service area during this period:
1. The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.
2. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of building 6 and 20 to include all areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is
Milwaukee, WI 53295 November 12, 2021
01 00 00 -11 changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled
"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
Milwaukee, WI 53295 November 12, 2021
01 00 00 -12
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Milwaukee, WI 53295 November 12, 2021
01 00 00 -13
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant
Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
1. Designating areas for equipment maintenance and repair;
2. Providing waste receptacles at convenient locations and provide regular collection of wastes;
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
Milwaukee, WI 53295 November 12, 2021
01 00 00 -14
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;
and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
Milwaukee, WI 53295 November 12, 2021
01 00 00 -15
1.11 PHYSICAL DATA – SOIL CONDITIONS – NOT USED
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the
Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.
The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the
Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the
Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark
Milwaukee, WI 53295 November 12, 2021
01 00 00 -16
(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
E. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings
Milwaukee, WI 53295 November 12, 2021
01 00 00 -17 shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
E. Contractors shall update (as work is completed) the VA electrical, medical gas, domestic plumbing and mechanical piping master schematic books. These books are located in the FM office.
F. MEP Coordination Drawings:
1. Prepare and provide coordination drawings showing the location of openings through slabs, the pipe sleeves/anchors and hanger inserts, as well as the location and elevation of utility lines, including, but not limited to, conveyor systems, pneumatic tubes, ducts, all existing utilities, and conduits and pipes 2 inches and larger in diameter. Drawings required for all areas being remodeled or new and ancillary areas required by such utility runs. Ancillary area drawings to include equal space on each side of main runs from main source to final location. These drawings, including plans, elevations, and sections as appropriate shall clearly show the manner in which the utilities fit into the available space and how they relate to each other and to existing building elements and controls for maintenance operations. Drawings shall be of appropriate scale to satisfy the previously stated purposes, but not smaller than 3/8-inch scale.
2. Drawings must be composite (with distinctive colors for the various trades) including but not limited to HVAC equipment, HVAC ductwork, mechanical piping, plumbing, fire protection, electrical, medical gases, telecommunications, etc. The submitted drawings for a given area of the project shall show the work of all trades which will be involved in that particular area. A complete composite drawing set or complete sets of
Milwaukee, WI 53295 November 12, 2021
01 00 00 -18 separate reproducible drawings and AutoCAD files shall be received by the Government not less than 20 days prior to the scheduled start of the work in the area illustrated by the drawings, for the purpose of showing the contractor's planned method of installation.
3. The objectives of such drawings are to promote carefully planned work sequence and proper trade coordination, in order to assure the expeditious solutions of problems and the installation of lines and equipment as contemplated by the contract documents while avoiding or minimizing additional costs to the contractor and to the Government. In the event the contractor, in coordinating the various installations and in planning the method of installation, finds a conflict in location or elevation of any of the utilities with themselves, with structural items or with other construction items, the contractor shall bring this conflict to the attention of the contracting officer immediately.
In doing so, the contractor shall explain the proposed method of solving the problem or shall request instructions as to how to proceed if adjustments beyond those of usual trades coordination are necessary.
4. Contractor to include initial and two revisions as part of original contract. Utilities installation work will not proceed in any area prior to the submission and completion of the
Government review of the coordinated drawings for that area, nor in any area in which conflicts are disclosed by the coordination drawings until the conflicts have been corrected to the satisfaction of the contracting officer. It is the responsibility of the contractor to submit the required drawings in a timely manner consistent with the requirements to complete the work covered by this contract within the prescribed contract time.
1.15 WARRANTY MANAGEMENT – NOT USED
1.16 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on the
Medical Center and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work.
Milwaukee, WI 53295 November 12, 2021
01 00 00 -19
Temporary roads shall be constructed, and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.17 CONTRACTORS'S FIELD OFFICE
A. The Contractor shall, within fifteen (60) days after receipt of
Notice to Proceed, provide where shown on the drawings a temporary field office, and two inch deep gravel surfaced area for use of the Contractor.
B. Contractor shall, for the duration of the occupancy, provide the following:
1. Satisfactory conditions in and around the field office and parking area.
2. Maintenance of gravel surfaced area, including the area for parking, in an acceptable condition for vehicle and foot traffic at all times.
3. Maintenance of utility services.
4. Potable water, fuel and electric power for normal office uses, including lights, heating and air conditioning.
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .