MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf
PDF 306 KB Posted
- Attached to
- Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
- Solicitation number
- 36C77622B0017
About this file
This document package includes mechanical piping plans and supporting documents for a construction project. The plans show new and existing piping, valves, equipment connections, and details for mechanical systems on the second and third floors of the C-Wing at the EHRM Training and Admin Space located at 5000 West National Avenue in Milwaukee, Wisconsin. The solicitation number is 36C77622B0017 and seeks bids for construction services to fully sprinkler the facility. The opportunity was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The bid due date was February 10, 2022. The plans and documents provide necessary information for contractors to understand project requirements and prepare competitive bids for the construction work.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T D
BUILDING 6 THIRD FLOOR KEY PLAN
N
HATCH INDICATES
ROOF AREA
BELOW, NIC
NO SHADE
INDICATES
LOCATION OF
PROJECT, TYP
C SOUTH
C
NORTH
(ROOF
ONLY)
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
A
SOUTH
B D
BUILDING 6 SECOND FLOOR KEY PLAN
N
SHADE INDICATES
AREA NOT IN
SCOPE, TYP
NO SHADE
INDICATES
LOCATION OF
PROJECT, TYP
C SOUTH
C
NORTHA
NORTH
2ND FLR PORCH NIC
MECHANICAL PIPING GENERAL NOTES
A. REFER TO SHEET M000 FOR GENERAL NOTES.
B. RE-SUPPORT EXISTING SYSTEM COMPONENTS NOT PROPERLY SUPPORTED
AFTER DEMOLITION AND NOT SCHEDULED FOR WORK.
MECHANICAL PIPING PLAN NOTES #
1. CONNECT NEW PIPING TO EXISTING PIPING IN THIS AREA. PROVIDE VALVE AT
CONNECTION.
L
M
N
O
P
17.1717.16
L
C -W
IN
G
D -W
IN
G
STAIR
C205
G
H
L
M
N
O
P
17.1717.16
G
H
L
C -W
IN
G
D -W
IN
G
OFFICE
C304
STAIR
C306
RECEPTION
C308
OPEN OFFICE
C305
OFFICE
C307
OFFICE
C302
CORRIDOR
C3A
VAV-C304
2.0 VAV-C302
2.8
VAV-C305
4.8
3/4" HHWS
3/4" HHWR
1" HHWS
1" HHWR
3/4" HHWR
3/4" HHWS
1 1/4" HHWS
1 1/4" HHWR
HWC-C304
HWC-C302
HWC-C305
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs \c h a w k \D o c u m e n ts
\1 .1
.2
M E
P v c h a w k D
D
W
.r v t
/2
/2
:1
:3
A
M
MP104
SECOND AND THIRD FLOOR - C
WING - MECHANICAL PIPING PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
EHRM TRAINING AND ADMIN
SPACE SUPPORT
5000 West National Avenue, Milwaukee, WI 53295
695-21-703
11/12/2021 CDH AJS
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"MP104
1 SECOND FLOOR - C-WING - MECHANICAL PIPING PLAN
SCALE: 1/8" = 1'-0"MP104
2 THIRD FLOOR - C-WING - MECHANICAL PIPING PLAN
NN
Revisions: Date:
Revision 1 03/21/2022
| Sheets |
| MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN |
| MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN |
| MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN |
| MM500 - MECHANICAL DETAILS |
| MM600 - MECHANICAL SCHEDULES |
| MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN |
| MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN |
File details come from the government source that posted it. Updated .