Drawing Changes 3-23-22.pdf

PDF 86 KB Posted

Attached to
Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703 Federal contract opportunity
Solicitation number
36C77622B0017
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains updated mechanical drawings and specifications for the Y1DZ--EHRM Training and Admin Space Support Construction project in Milwaukee, Wisconsin. Key changes to the drawings include clarifications to the insulation for exposed ductwork served by Air Handling Unit CB42, updated HVAC layouts for supply and return ductwork from Air Handling Unit C126 with overall decreased sizing to match loads, utilization of hot water coils instead of VAV boxes, updated HVAC piping layouts to coordinate with system changes and utilize hot water coils, and controls updates. The related federal contract opportunity is solicitation number 36C77622B0017 for construction services for the project at the Department of Veterans Affairs facility located at 695-21-703.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--EHRM Training and Admin Space Support Construction - Milwaukee, WI 695-21-703, newest first.
File Type Posted
Technical Questions - Milwaukee EHRM 3-28-22.pdf PDF
36C77622B0017 0005.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 03-18-22.pdf PDF
Technical Questions - Milwaukee EHRM 3-23-22.pdf PDF
MP104 - SECOND AND THIRD FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
MH102 - FIRST FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM500 - MECHANICAL DETAILS.pdf PDF
MH100 - BASEMENT - C WING - MECHANICAL HVAC PLAN.pdf PDF
MP103 - FIRST FLOOR - C WING - MECHANICAL PIPING PLAN.pdf PDF
36C77622B0017 0004.pdf PDF
MH103 - SECOND AND THIRD FLOOR - C WING - MECHANICAL HVAC PLAN.pdf PDF
MM600 - MECHANICAL SCHEDULES.pdf PDF
MM700 - MECHANICAL CONTROL SYSTEMS.pdf PDF
36C77622B0017 0003.pdf PDF
Question 64 Third Floor Structural.pdf PDF
Question 69 Section Through A Wing North.pdf PDF
Technical Questions - Milwaukee EHRM 3-14-22.pdf PDF
Question 93 C-wing north roof.JPG JPG image
Question 74 Porch Detail.pdf PDF
36C77622B0017 0002.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-25-22.pdf PDF
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-18-22.pdf PDF
Site Visit Sign-in Sheet - Milwaukee 2-23-22.pdf PDF
36C77622B0017 0001.pdf PDF
Attachment 5 - Drawings 2 of 4.pdf PDF
Attachment 8 - Contractor Core Work Hours.pdf PDF
Attachment 11 - Brand Name Justification - Milwaukee.pdf PDF
Attachment 2 - Specifications Volume 2.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 4 - Drawings 1 of 4.pdf PDF
Attachment 7 - Drawings 4 of 4.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13 - Construction Wage Rates - Milwaukee County - 02-04-22.pdf PDF
Attachment 15 - Milwaukee VAMC Map - EHRM Site Visit.pdf PDF
IFB - 36C77622B0017 - 2-10-22.pdf PDF
Attachment 3 - Final SOW - 1-27-22.pdf PDF
Attachment 14 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 1 - Specifications Volume 1.pdf PDF
Attachment 6 - Drawings 3 of 4.pdf PDF
Attachment 12 - NESHAP Asbestos Survey.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Changes 3‐23‐22

Attached are the updated drawings in response to technical questions. Below is a description of the changes per drawing sheet (changes identified by clouds on the drawing):

MH100

Clarification of the insulation for the exposed ductwork served from AHU‐CB42.

MH102

Updated HVAC layout for supply and return ductwork from AHU‐C126. These items have been overall decreased to match the HVAC loads.

MH103

Updated HVAC layout to utilize hot water coils and not VAV boxes.

MP103

Updated HVAC piping layout to coordinate with HVAC changes from AHU‐C126.

MP104

Updated HVAC piping layout to utilize hot water coils and not VAV boxes.

MM500

Updated mechanical section of First Floor C Wing North HVAC layout.

MM600

Updated VAV and HWC schedules.

Updated cooling conditions for all three new AHUs.

MM700

Controls cleanup based off of comments.

o Sump pump scope o VAV/HWC scope o AHU freeze Stat scope

File details come from the government source that posted it. Updated .