This document is an asbestos reinspection report for multiple buildings at the William Jennings Bryan Dorn VA Medical Center in Columbia, South Carolina. The report provides detailed information on the locations, quantities, condition, and friability of asbestos-containing materials (ACM) found in the buildings during the inspection. It includes a summary of the sampling methodology, laboratory analysis results, and descriptions of the ACM identified, such as floor tiles, pipe insulation, roofing materials, and miscellaneous materials. The report also provides risk assessments, cost estimates, and recommended response actions for the identified ACM. This information is intended to support the planning and execution of asbestos abatement activities at the facility.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
for the
DEPARTMENT OF VETERANS AFFAIRS
WM. JENNINGS BRYAN DORN VAMC
COLUMBIA, SC
INSPECTION DATES:
DECEMBER 15-19, 2014
STATION NUMBER: 544
ORDER #:
VA247-14-F-3623
CONTRACTOR:
USFIN DEVELOPMENT, LLC
EDWARDSVILLE, IL – MONCLOVA, OH
WILLIAM JENNINGS BRYAN DORN VAMC – COLUMBIA, SC
DECEMBER 2014
TABLE OF CONTENTS
1.0 BUILDING IDENTITIES AND PROJECT DESCRIPTION
2.0 INSPECTOR NAMES AND CONTACT INFORMATION
3.0 INSPECTOR CERTIFICATIONS AND LICENSES
4.0 ASBESTOS SAMPLING FORMS
5.0 LABORATORY IDENTITY, INFORMATION, AND RESULTS
6.0 ACM DESCRIPTIONS AND INFORMATION
(QUANTITY, LOCATION, CONDITION, FRIABILITY, AND PHOTOS)
7.0 ACM RISK ASSESSMENTS, COST ESTIMATES & PRIORITY FOR ABATEMENT
8.0 FLOOR PLANS - ASBESTOS SAMPLES AND ACM LOCATIONS
1.0 BUILDING IDENTITY
Building Number: 5
Building Name: Auditorium, Post Office, and IG-Investigation Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1944
Year Renovated: 2012
Number of Floors: 3 plus basement, crawlspace and attic
Total GSF: 30,000 sf
Inspection Date: December 17, 2014
Previous Inspection Date: 1992 and 2005
Building Number: 6
Building Name: Administration and Credit Union Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1 plus attic, basement and crawlspace
Total GSF: ~8,000 sf
Inspection Date: December 16, 2014
Building Number: 7
Building Name: Warehouse and Office Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: 1980s
Number of Floors: 1
Total GSF: ~18,000 sf
Inspection Date: December 15, 2014
Building Number: 8
Building Name: Boiler House Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: 2000s
Number of Floors: 2
Total GSF: ~11,000 sf
Previous Inspection Date: 1992 and 2004
Building Number: 9
Building Name: Laboratory and Administration Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: 2014
Number of Floors: 2 plus attic
Total GSF: ~17,000 sf
Building Number: 9A
Building Name: Laboratory and Administration Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1960s
Year Renovated: N/A
Number of Floors: 1 plus basement
Total GSF: ~15,000 sf
Building Number: 20
Building Name: Administration and Shop Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1 plus attic
Total GSF: ~10,000 sf
Building Number: 22
Building Name: Administration and Office Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 3 plus attic, basement and crawlspaces
Total GSF: ~40,000 sf
Inspection Date: December 17-18, 2014
Building Number: 22A
Building Name: Emergency Generator Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~240 sf
Inspection Date: December 18, 2014
Building Number: N/A
Building Name: Cardboard Press Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1990s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~300 sf
Previous Inspection Date: 2005
Building Name: North Pump House
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~40 sf
Building Name: South Pump House
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~40 sf
Building Number: T-25
Building Name: Mechanical Shop
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~1,200 sf
Building Number: T-34
Building Name: Equipment and Pesticide Storage Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~2,000 sf
Building Number: T-34A
Building Name: Pesticide Storage Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1980s
Year Renovated: N/A
Number of Floors: 1
Total GSF: 30 sf
Building Number: T-36
Building Name: Storage and Office Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1990s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~1,500 sf
Building Name: U-Corridor
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1960s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~300 sf
Building Name: Y-Corridor
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1930s
Year Renovated: N/A
Number of Floors: 1 plus crawlspace
Total GSF: ~8,000 sf
Building Number: 100/100A
Building Name: Main Hospital Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1970s/1990s
Year Renovated: 2000s
Number of Floors: 5 plus penthouse and basement
Total GSF: ~560,000 sf
Inspection Date: December 17-19, 2014
Building Number: 103
Building Name: Assisted Living, Administration, Education and Medical Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1980s
Year Renovated: 2000s
Number of Floors: 2 plus penthouse
Total GSF: 12,699 sf
Inspection Date: December 17-18, 2014
Building Number: 103 Out Building
Building Name: Smokers Shack
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1980s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~200 sf
Building Number: 105
Building Name: Storage and Office Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1990s
Year Renovated: N/A
Number of Floors: 1
Total GSF: ~4,500 sf
Building Number: 106
Building Name: Psychiatric Care and Administration Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1990s
Year Renovated: N/A
Number of Floors: 2 plus penthouse, basement and tunnel
Total GSF: ~120,000 sf
Building Number: 114
Building Name: MRI Building
Station Name: William Jennings Bryan Dorn VAMC
Year Built: 1990s
Year Renovated: N/A
Number of Floors: 1
Total GSF: `3,000 sf
PROJECT DESCRIPTION
USFin Development, LLC (USFIN) along with their sub-contractor Aerostar SES, LLC completed the Asbestos Re-Inspection conducted at the William Jennings Bryan Dorn Veterans Affairs Medical Center (VAMC) located at Columbia, SC. These activities were provided at the request of the Department of Veterans Affairs Solicitation Number VA247-14-F-3623. The project description required that the Contractor conduct a comprehensive survey for the presence of asbestos containing materials (ACM) and conduct a determination inspection in accordance with the contract Statement of Work.
Scope of Work
The scope of work consisted of the performance of an asbestos survey with the following components to be including in the final report:
1.0 Building Identity and Project Description
2.0 Inspector Names and Contact Information
3.0 Inspector Certifications and Licenses
4.0 Asbestos Sampling Forms
5.0 Laboratory Identity, Information, and Results
6.0 ACM Descriptions and Information (Quantity, Location, Condition, Friability, And Photos)
7.0 ACM Risk Assessments, Cost Estimates & Priority For Abatement
8.0 Floor Plans - Asbestos Samples and ACM Locations (Attached CD in Revit)
The asbestos re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700.
The scope of work for the survey required the following activities:
• AHERA-type re-inspection. The survey was to include accessible areas of all site buildings and, if present, suspect materials on the exterior of buildings and in tunnels and crawl spaces. Each structure was to be categorized according to the AHERA risk rating system and AHERA abatement categories. Previous data and assessments were to be utilized to reduce survey time and effort.
• Provide a complete update to prior Baseline Asbestos Assessment Surveys to ensure compliance with EPA AHERA and OSHA asbestos notification requirements to building occupants are met.
• Bulk samples were to be collected of suspect materials for confirmatory laboratory analysis (samples will be collected and analyzed in accordance with the recommended EPA protocol) when necessary to confirm or clarify existing asbestos surveys. The contractor was to collect all samples of suspected ACM in accordance with EPA and OSHA regulations preventing airborne fiber exposure to the inspectors and facility personnel.
Explanation of Summary Table for Re-inspection and Assessment of ACM’s
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints.
Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers;
separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage;
significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM.
Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
INSPECTION LIMITATIONS
This report is intended for the VAMC. This report is not intended to serve as a bidding document or as a project specification document. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user. Additionally, the passage of time may result in a change in the environmental characteristics at this site. This report does not warrant against future operations or conditions that could affect the recommendations made. The results, findings, conclusions and recommendations expressed in this report are based only on conditions that were observed during the inspection of the site. There may be additional suspect asbestos containing materials in inaccessible or concealed spaces that are revealed during demolition activities. All such unidentified materials should be treated as Presumed Asbestos Containing Material (PACM) in accordance with 29 CFR 1926.71 and
1910.1001. The PACM’s should be sampled to confirm the presence of asbestos prior continuation of the demolition activities. Subcontractors and employees working within the structures at the site should be made aware of the locations of the ACMs and the possibility of concealed suspect ACMs that could be found during demolition activities. They should be advised not to disturb the ACM’s or PACM’s.
2.0 INSPECTOR NAMES AND CONTACT INFORMATION
Prime Company: USFin Development, LLC 5993 Staunton Rd.
Edwardsville, IL 62025
(618) 789-0449
Sub-Contractor: Aerostar SES, LLC 3137 Presidential Parkway, Suite 115 Atlanta, GA 30340
(770) 986-7734
Inspector 1: Mark Hamblin
3137 Presidential Parkway, Suite 115 Atlanta, GA 30340
(770) 986-7734 mhamblin@aerostar.net
Inspector 2: Miles Eckert (SC)
11181 St. Johns Industrial Parkway North Jacksonville, Florida 32246
(904) 565-2820 meckert@aerostar.net
3.0 INSPECTOR TRAINING CERTIFICATES AND LICENSES
Inspector 1: Mark Hamblin
US EPA Trained Asbestos Inspector 2014 Original Training
US EPA Trained Asbestos Management Planner 2014 Original Training
State Certified: Al, GA, SC, TN
Inspector 2: Miles Eckert (SC) US EPA Trained Asbestos Inspector
State Certified: SC, FL
4.0 ASBESTOS SAMPLING DATA AND FORMS
4.1 Bulk Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1percent asbestos.
For the purposes of this inspection, any sample containing more than “trace” or less than 1% asbestos is considered to be an ACBM. The ACBM inspection and bulk sampling were performed in accordance with AHERA (40 CFR Part 763). AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM, as follows:
• Surfacing Material
a) Three samples from homogeneous areas up to 1,000 square feet
b) Five samples from homogeneous areas between 1,000 and 5,000 square feet
c) Seven samples from homogeneous areas over 5,000 square feet
• Thermal System Insulation
a) Minimum of three samples per homogeneous sampling area
• Miscellaneous Material
a) Per the discretion of the inspector in a manner sufficient to determine asbestos content (usually 2 or more samples per homogeneous sampling area)
4.2 Sample Collection/Analytical Procedures
Samples for asbestos analysis were collected by EPA-trained inspectors. Proper safety measures such as wetting the material before sampling, cleaning up the area by wet-wiping any resulting residual debris, and wearing proper personal protective equipment, were employed. Coring tools and knives were utilized to be certain of sampling the entire thickness of a material. All samples were placed in appropriately labeled airtight containers for shipment to the laboratory.
4.3 Survey Access Limitations
All accessible areas within the facility were inspected for ACBM, including access panels to chases, areas above suspended ceilings, and crawl spaces. Any areas not inspected included non-accessible pipe chases, areas above plaster ceilings, areas above patient-care operations, secured areas, and areas occupied by patients where access could not be gained.
The areas not inspected, or where access could not be obtained, must be assumed to contain asbestos and be inspected prior to any renovation or maintenance activities.
4.4 Non-Asbestos-Containing Building Materials
The following materials were not sampled (per EPA) because they are not considered suspect asbestos-containing materials:
• Slate roofing shingles
• Brick materials
• Ceramic tiles
• Cinderblock and concrete
• Marble, travertine, and terrazzo
• Fiberglass insulating materials (yellow, white, and pink colored)
• Glass materials
• Rubber and synthetic materials including Styrofoam and isocyanates
• Wood materials
• Metal materials
4.5 List of Acronyms Used in Report
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act EPA United States Environmental Protection Agency HazCom Hazard Communication MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NVLAP National Voluntary Laboratory Accreditation Program PLM Polarized Light Microscopy TSI Thermal Systems Insulation USFin USFin Development, LLC (Prime Contractor) VA United States Department of Veterans Affairs VAMC VA Medical Center
ASBESTOS BULK SAMPLING INFORMATION
Facility: VAMC WILLIAM JENNINGS BRYAN DORN Location: COLUMBIA, SC Inspection Dates: DECEMBER 15-19, 2014 Laboratory: EMSL ANALYTICAL – SMYRNA, GA Inspector: MARK HAMBLIN Page 1 of 2
BLDG. SAMPLE
NUMBER
HOMOG.
AREA
SAMPLE LOCATION MATERIAL DESCRIPTION LABORATORY ANALYSIS
RESULT
105 105-1 H10 1A101A near 1A101B 4” Brown cove base and mastic No Asbestos Detected
105 105-2 H11 1A101 Red fire putty No Asbestos Detected
105 105-3 H12 1A101 Joint compound No Asbestos Detected
105 105-4 H13 1A100 4” Gray cove base and mastic No Asbestos Detected
T-36 T-36-1 H7 Breakroom Black sink mastic No Asbestos Detected
T-36 T-36-2 H8 Warehouse White HVAC duct mastic No Asbestos Detected
7 7-1 H18 Office, eastern portion of building Joint compound No Asbestos Detected
7 7-2 H19 Office, eastern portion of building Drywall No Asbestos Detected
7 7-3 H20 Office, eastern portion of building 2’ Holes and fissures ceiling tile No Asbestos Detected
7 7-4 H21
Office, eastern portion of building 4” Gray cove base mastic No Asbestos Detected
8 8-1 H40 Lower level office/control room Gray duct mastic No Asbestos Detected
8 8-2 H41 Lower level office/control room Beige HVAC fiberglass duct mastic No Asbestos Detected
8 8-3 H42 Room 3 White fiberglass wrap TSI No Asbestos Detected
8 8-4 H43 Room 3 White hard TSI No Asbestos Detected
9 9-1 H41 117B 2’ Holes and fissures ceiling tile No Asbestos Detected
9 9-2 H42 113 2’ Rough ceiling tile No Asbestos Detected
9 9-3 H43 105 White HVAC duct mastic No Asbestos Detected
9A 9A-1 H19 Corridor outside 227 Tan/olive duct mastic No Asbestos Detected
9A 9A-2 H20 Corridor outside 227 Tan/olive fiberglass duct mastic No Asbestos Detected
9A 9A-3 H21 Corridor outside 230 2’ Holes and fissures ceiling tile No Asbestos Detected
9A 9A-4 H22 104 White fiberglass TSI mastic No Asbestos Detected
6 6-1 H31 Attic White fiberglass HVAC mastic No Asbestos Detected
6 6-2 H32 Attic Beige HVAC mastic No Asbestos Detected
6 6-3 H33 112 Yellow carpet mastic No Asbestos Detected
6 6-4 H34 111B Carpet mastic No Asbestos Detected
6 6-5 H35 111B Vinyl floor tile and mastic No Asbestos Detected
6 6-6 H36 Entry foyer, north eastern side Popcorn texture No Asbestos Detected
6 6-7 H37 Entry foyer, north eastern side 12” Beige tile with brown streaks No Asbestos Detected
6 6-8 H38 102 12” White tile with blue streaks No Asbestos Detected
6 6-9 H39 Basement, northern room White fiberglass TSI mastic 15% Asbestos
20 20-1 H29 110 Pink sink mastic 3% Asbestos
20 20-2 H30 117 4” Brown cove base mastic No Asbestos Detected
20 20-3 H31 205 Beige HVAC mastic No Asbestos Detected
20 20-4 H32
12” Beige tile with Beige streaks No Asbestos Detected
20 20-5 H33 210A White fiberglass TSI mastic No Asbestos Detected
114 114-1 H6 102 Gray duct mastic No Asbestos Detected
ASBESTOS BULK SAMPLING INFORMATION
Facility: VAMC WILLIAM JENNINGS BRYAN DORN Location: COLUMBIA, SC Inspection Dates: DECEMBER 15-19, 2014 Laboratory: EMSL ANALYTICAL – SMYRNA, GA Inspector: MARK HAMBLIN Page 2 of 2
BLDG. SAMPLE
NUMBER
HOMOG.
AREA
SAMPLE LOCATION MATERIAL DESCRIPTION LABORATORY ANALYSIS
RESULT
5 5-1 H50 116 Silver coating on wall No Asbestos Detected
5 5-2 H51 116 White HVAC mastic No Asbestos Detected
5 5-3 H52 116 White fiberglass TSI mastic No Asbestos Detected
5 5-5 H53 Attic Insulation/fireproofing No Asbestos Detected
22 22-1 H31 BA100 White fiberglass TSI mastic 5% Asbestos
106 106-1 H23 Penthouse
Cream HVAC duct insulation mastic No Asbestos Detected
103 103-1 H19 Corridor outside 2C124 Yellow carpet mastic No Asbestos Detected
103 103-2 H20 2C127 Blue cove base and mastic No Asbestos Detected
103 103-3 H21 Penthouse Foam glass TSI and mastic No Asbestos Detected
103 103-4 H22 Penthouse
White mastic on foam glass TSI wrap No Asbestos Detected
100 100-1 H141 LC142 Beige/tan duct mastic 3% Asbestos
100 100-2 H142 LC142 Red duct mastic 10% Asbestos
100 100-3 H143 LC142 Maroon duct mastic 10% Asbestos
100 100-4 H144
LA137
Beige fiberglass TSI insulation mastic No Asbestos Detected
100 100-5 H145 LB165 Green/blue TSI No Asbestos Detected
100 100-6 H146
LB165
Foam glass TSI and wrap mastic No Asbestos Detected
100 100-7 H147 Stairwell south of LB165 Stair tread mastic No Asbestos Detected
100 100-9 H148 1C114 Beige fiberglass insulation No Asbestos Detected
100 100-10 H149 1C214
Pink fiberglass insulation mastic No Asbestos Detected
100 100-11 H150 2B165A
Off-white fiberglass TSI insulation mastic No Asbestos Detected
100 100-12 H151 3A162 New floor tile with mastic No Asbestos Detected
100 100-13 H152 3C131 Glass foam TSI with mastic No Asbestos Detected
100 100-14 H153 6A100 near roof access hatch White endcap mastic No Asbestos Detected
100 100-15 H154 6A100 west of 6A102 Gray pipe stop No Asbestos Detected
100A 100A-1 H155 BD100 Olive duct mastic No Asbestos Detected
100A 100A-2 H156 BD100 Brown duct mastic No Asbestos Detected
100A 100A-3 H157 BD100 Dark gray duct mastic No Asbestos Detected
100A 100A-4 H158 BD100 Cream fiberglass TSI wrap mastic No Asbestos Detected
100A 100A-5 H159 BD100 White fiberglass TSI wrap mastic No Asbestos Detected
5.0 LABORATORY IDENTITY, CONTACT INFORMATION, AND LAB REPORTS
Laboratory: EMSL Analytical, Inc.
2205 Corporate Plaza Parkway SE, Suite 200 Smyrna, Georgia 30080 770-956-9150 www.EMSL.com
Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
Accreditation Number: 101048-1
Expires: 6-30-15 http://www.emsl.com/
LABORATORY ANALYSIS REPORT
6.0 ACM DESCRIPTIONS AND INFORMATION
(QUANTITY, LOCATION, CONDITION, FRIABILITY)
BUILDING SUMMARY: Building 5
Homog.
Area Asbestos Material Locations Quantity Condition Friability
H-1 Flooring materials Auditorium 4,000 SF Good Non-Friable
H-2 12" White with black streaks floor tile Storage room behind 114 30 SF Good Non-Friable
H-3 Mastic under 12" white with black streaks floor tile Storage room behind 114 30 SF Good Non-Friable
H-4 12" Multi-brown floor tile 1st Floor hallway between gym and post office 250 SF Good Non-Friable
H-5 Mastic under 12" multi-brown floor tile
1st Floor hallway between gym and post office 250 SF Good Non-Friable
H-15 Silver weatherproofing Metal roof vents 40 SF Good Non-Friable
H-16 Roof materials Roof 9,500 SF Good Non-Friable
H-17 Flashing material - seam caulk Roof 100 LF Good Non-Friable
H-21 Window putty (patch) Exterior 2 LF Good Non-Friable
H-28 Debris in soil Crawlspace 5 SF Poor Friable
H-29 Black mastic sealant Attic 80 SF Good Non-Friable
H-32 Olive/gray-colored seam caulk Throughout IM Good Non-Friable
H-35 12" Gray with brown streaks floor tile
3rd Floor projector booth and storage 140 SF Good Non-Friable
H-48 Dark gray interior window frame caulk 110 40 SF Good Non-Friable
H-54 Fire doors Throughout 20 SF per door Good Non-Friable
H-55 Abandoned original TSI Throughout IM Good Friable
6.0 Photographs of ACM Materials - Building 5
H-1 Flooring materials
H-2 & H-3 12" White with black streaks floor tile and Mastic
H-4 & H-5 12" Multi-brown floor tile and Mastic
H-15 Silver weatherproofing
H-16 Roof materials
H-17 Flashing material - seam caulk
H-21 Window putty (patch)
H-28 Debris in soil
H-29 Black mastic sealant
H-32 Olive/gray-colored seam caulk
H-35 12" Gray with brown streaks floor tile
H-48 Dark gray interior window frame caulk
H-54 Fire doors
H-55 Abandoned original TSI
BUILDING SUMMARY: Building 6
Area Asbestos Material Locations Quantity Condition Friability
H-9 Asphalt shingles Roof 6,000 SF Good Non-Friable
H-10 Roofing felt Roof 6,000 SF Good Non-Friable
H-11 Built-up roof materials Roof 1,200 SF Good Non-Friable
H-13 Flashing material Roof 400 LF Good Non-Friable
H-26 Soil debris Crawlspace 3,000 SF Poor Friable
H-27 Penetration material Crawlspace Unknown Good Non-Friable
H-28 Duct penetration mastic Crawlspace Unknown Good Non-Friable
H-29 Weatherproofing mastic Crawlspace 2,000 SF Good Non-Friable
H-30 Drain line mastic Exterior 2 SF Good Non-Friable
H-39 White fiberglass TSI mastic Basement 50 SF Good Non-Friable
H-40 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 6
H-9 Asphalt shingles H-10 Roofing felt
H-11 Built-up roof materials
H-13 Flashing material
H-26 Soil debris H-27 Penetration material H-28 Duct penetration mastic H-29 Weatherproofing mastic
H-30 Drain line mastic
H-39 White fiberglass TSI mastic
H-40 Fire doors
BUILDING SUMMARY: Building 7
Area Asbestos Material Locations Quantity Condition Friability
H-2 Floor tile mastic (Residue) 101, 102 120 SF Good Friable
H-4 Downspout tar Exterior 3 SF Good Friable
H-6 Asphalt shingles Roof 5,000 SF Good Non-Friable
H-7 Roofing felt Roof 5,000 SF Good Non-Friable
H-15 Window frame caulk Interior and exterior of original building 350 SF Fair Friable
H-22 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 7
H-2 Floor tile mastic (Residue)
H-4 Downspout tar
6.0 Photographs of ACM Materials - Building 7
H-6 Asphalt shingles H-7 Roofing felt
H-22 Fire doors
BUILDING SUMMARY: Building 8
Area Asbestos Material Locations Quantity Condition Friability
H-8 Fire doors Throughout 20 SF per door Good Non-Friable
H-9 Black roof flashing Roof 110 SF Good Non-Friable
H-10 Gray roof flashing Roof at parapet wall 225 SF Good Non-Friable
H-16 Flue TSI on boiler 3 Between boilers 1-3 and stacks 30 SF Good Non-Friable
H-22 Boiler body TSI Under metal skin, boilers 1-
2,600 SF Good Non-Friable
H-28 Penetration sealant (black but painted silver) Pump room, right of tunnel 2 LF Good Non-Friable
H-33 Flue gasket Boiler room 20 LF Good Non-Friable
H-34 Exterior black/gray mastic sealant
Around exterior skylights in gas pipe area 35 LF Good Non-Friable
6.0 Photographs of ACM Materials - Building 8
H-8 Fire doors
H-9 Black roof flashing
H-10 Gray roof flashing
H-16 Flue TSI on boiler 3
H-22 Boiler body TSI
H-28 Penetration sealant (black but painted silver)
H-33 Flue gasket
H-34 Exterior black/gray mastic sealant
BUILDING SUMMARY: Building 9
Area Asbestos Material Locations Quantity Condition Friability
H-1 9" Off-white floor tile with green speckles 114 135 SF Good Non-Friable
H-2 Mastic under 9" off-white floor tile with green speckles 114 135 SF Good Non-Friable
H-4 12" Gray floor tile with blue speckles 115, 106 300 SF Good Non-Friable
H-5 Mastic 12" gray floor tile with blue speckles 115, 106 300 SF Good Non-Friable
H-17 Asphalt shingles Roof 6,500 SF Good Non-Friable
H-18 Felt paper Roof 6,500 SF Good Non-Friable
H-29 Gray duct seam caulk 127 50 SF Good Non-Friable
H-35 Olive-colored duct seam caulk 127 50 SF Good Non-Friable
H-38 Pipe TSI (hard and cloth wrapped)
Various areas throughout 1st floor Unknown Good Friable
H-39 Pipe, vent and door frame caulk Exterior 1,500 LF Good Non-Friable
H-44 Black duct mastic 115 3 SF Good Non-Friable
H-45 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 9
H-1 9" Off-white floor tile with green speckles H-2 Mastic under 9" off-white floor tile with green speckles
H-4 12" Gray floor tile with blue speckles H-5 Mastic 12" gray floor tile with blue speckles
H-17 Asphalt shingles H-18 Felt paper
H-29 Gray duct seam caulk
H-35 Olive-colored duct seam caulk
H-39 Pipe, vent and door frame caulk
H-44 Black duct mastic
H-45 Fire doors
BUILDING SUMMARY: Building 9A
Area Asbestos Material Locations Quantity Condition Friability
H-1 12" Grey floor tile with blue spotted
Throughout most of 1st floor 7000 SF Good Non-Friable
H-2 Mastic under 12" grey floor tile with blue spotted
Throughout most of 1st floor 7000 SF Good Non-Friable
H-3 Cementitious panels lining exhaust fume hoods 210, 214 Unknown Good Non-Friable
H-18 Laboratory counter tops, sinks, splashguards and pegboards
204, 209, 210, 214, 221, 222, 225 1,300 SF Good Non-Friable
H-23 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 9A
H-1 12" Grey floor tile with blue spotted H-2 Mastic under 12" grey floor tile with blue spotted
H-3 Cementitious panels lining exhaust fume hoods
6.0 Photographs of ACM Materials - Building 9A
H-18 Laboratory counter tops, sinks, splashguards and pegboards
H-23 Fire doors
BUILDING SUMMARY: Building 20
Area Asbestos Material Locations Quantity Condition Friability
H-1 12" Off-white with tan and brown floor tile
101, 103, 104, 105, 108, 109, 111, 113, 114 2,500 SF Good Friable
H-2 Mastic under 12" off-white with tan and brown floor tile
101, 103, 104, 105, 108, 109, 111, 113, 114 2,500 SF Good Friable
H-13 Asphalt roof shingles Roof 6,000 SF Good Non-Friable
H-14 Felt paper under asphalt roof shingles Roof 6,000 SF Good Non-Friable
H-15 Built-up roof materials Roof 4500 SF Good Non-Friable
H-17 12" White with black speckles floor tile 117 50 SF Good Non-Friable
H-18 Mastic under 12" white with black speckles floor tile 117 50 SF Good Non-Friable
H-22 Interior window glazing Various areas throughout 400 LF Good Non-Friable
H-25 Window frame caulk Exterior, original building 300 LF Good Friable
H-28 Olive colored duct seam caulk 119 150 SF Good Non-Friable
H-29 Pink sink mastic 110 4 SF Good Non-Friable
H-34 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 20
H-1 12" Off-white with tan and brown floor tile H-2 Mastic under 12" off-white with tan and brown floor tile
H-13 Asphalt roof shingles H-14 Felt paper under asphalt roof shingles
H-15 Built-up roof materials
H-17 12" White with black speckles floor tile H-18 Mastic under 12" white with black speckles floor tile
H-22 Interior window glazing
H-25 Window frame caulk
H-28 Olive colored duct seam caulk
H-29 Pink sink mastic
H-34 Fire doors
BUILDING SUMMARY: Building 22
Area Asbestos Material Locations Quantity Condition Friability
H-1 12" Brown floor tile 1st and 2nd floor corridors 5,000 SF Good Non-Friable
H-2 Mastic under 12" brown floor tile 1st and 2nd floor corridors 5,000 SF Good Non-Friable
H-3 12" Brown floor tile 3rd floor corridor 2,500 SF Good Non-Friable
H-4 Mastic under 12" brown floor tile 3rd floor corridor 2,500 SF Good Non-Friable
H-10 Capping material on fiberglass pipe fitting insulation Throughout Unknown Good Non-Friable
H-13 Vent seam caulk Exterior 900 LF Good Non-Friable
H-17 Black mastic (residue) Basement 500 SF Good Non-Friable
H-19 Penetration stop material Throughout Unknown Good Non-Friable
H-30 Visible debris in soil Crawlspace 5,100 SF Poor Friable
H-31 White fiberglass TSI mastic Throughout Unknown Good Non-Friable
H-32 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 22
H-1 12" Brown floor tile H-2 Mastic under 12" brown floor tile
H-3 12" Brown floor tile H-4 Mastic under 12" brown floor tile
H-10 Capping material on fiberglass pipe fitting insulation
H-13 Vent seam caulk
H-17 Black mastic (residue)
H-19 Penetration stop material
H-30 Visible debris in soil
H-31 White fiberglass TSI mastic
H-32 Fire doors
BUILDING SUMMARY: Building 22A
Asbestos Material Locations Quantity Condition Friability
H-4 Vibration collar
Between generator housing and duct housing
8 LF Good Non-Friable
H-5 Black electrical wrap Side of generator <1 LF Good Non-Friable
H-7 Fire doors Entrance 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building 22A
H-4 Vibration collar
H-5 Black electrical wrap
6.0 Photographs of ACM Materials - Building 22A
H-7 Fire doors
BUILDING SUMMARY: Building T-25
Asbestos Material Locations Quantity Condition Friability
H-1 Roof materials Roof 1200 SF Good Non-Friable
H-5 Window Glazing Exterior 100 SF Good Friable
6.0 Photographs of ACM Materials - Building T-25
H-1 Roof materials
H-5 Window Glazing
BUILDING SUMMARY: Building T-34
Area Asbestos Material Locations Quantity Condition Friability
H-1 Black seam mastic Interior seams on corrugated metal Unknown Good Non-Friable
H-2 Silver paint Exterior 5,000 Good Non-Friable
6.0 Photographs of ACM Materials - Building T-34
H-1 Black seam mastic
H-2 Silver paint
BUILDING SUMMARY: Building T-36
Asbestos Material Locations Quantity Condition Friability
H-9 Fire Doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials - Building T-36
H-9 Fire Doors
BUILDING SUMMARY: Building U-Corridor
Asbestos Material Locations Quantity Condition Friability
H-4 Window frame caulk Exterior 150 LF Good Non-Friable
H-5 Felt paper Roof 500 SF Good Non-Friable
6.0 Photographs of ACM Materials – U Corridor
H-4 Window frame caulk
H-5 Felt paper
BUILDING SUMMARY: Building Y-Corridor
Asbestos Material Locations Quantity Condition Friability
H-7 Debris/contaminated soil Crawlspace, in USC controlled area 3000 SF Poor Friable
H-8 Pipe TSI - cardboard type Crawlspace, in USC controlled area 1,000 SF Fair Friable
H-9 Roofing tar Roof 12000 SF Good Non-Friable
H-10 Roofing felt Roof 12000 SF Good Non-Friable
H-13 Pipe TSI - cardboard type Crawlspace, in USC controlled area 500 LF Good Friable
H-14 Pipe TSI - magnesia type Crawlspace, in USC controlled area 500 LF Good Friable
H-22 TSI debris in soil Crawlspace, in USC controlled area 3,000 SF Poor Friable
6.0 Photographs of ACM Materials – Y Corridor
H-9 Roofing tar H-10 Roofing felt
BUILDING SUMMARY: Building 100 & 100A
Asbestos Material Locations Quantity Condition Friability
H-2 Mastic under 12" multi-gray floor tile
Throughout portions of
95,000 SF Good Non-Friable
H-7 Black acoustical sink mastic Identified on map, likely present elsewhere ~4 SF per sink Good Non-Friable
H-8 Pink acoustical sink mastic Not observed, potentially still present ~4 SF per sink Good Non-Friable
H-30 Duct seam caulk (olive) Throughout IM Good Non-Friable
H-31 Seam caulk (red) Throughout Unknown Good Non-Friable
H-40 End cap insulation (powdery) Throughout Unknown Good Non-Friable
H-46 Pipe penetration caulk (dark gray and hard) Throughout Unknown Good Non-Friable
H-53 Floor mastic (black) LB165 10 SF Good Non-Friable
H-89 Floor tile mastic (residue) Throughout under new tile Unknown Good Non-Friable
H-94 Pipe thermal system insulation
(TSI) and covering
Basement level engine generator room 15 LF Good Non-Friable
H-98 Gasket material Basement level engine generator room Unknown Good Non-Friable
H-99 Woven hose insulation Basement level engine generator room 20 LF Good Non-Friable
H-110 Laboratory counter tops, sinks and splashguards (green) 1A151 200 SF Good Non-Friable
H-111 Laboratory counter tops (dark gray) 1A148 15 LF Good Non-Friable
H-112
Laboratory counter tops, sinks, splashguards, and pegboards
(black)
1st Floor laboratory areas 2,000 SF Good Non-Friable
H-120 Seam caulk (gray/light gray)
Exterior piping associated with cooling towers
30 LF Good Non-Friable
H-141 Beige/tan duct mastic Throughout Unknown Good Non-Friable
H-142 Red duct mastic Throughout Unknown Good Non-Friable
H-143 Maroon duct mastic Throughout Unknown Good Non-Friable
H-160 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials – Buildings 100 & 100A
H-2 Mastic under 12" multi-gray floor tile
H-7 Black acoustical sink mastic
H-30 Duct seam caulk (olive)
H-31 Seam caulk (red)
H-40 End cap insulation (powdery)
H-46 Pipe penetration caulk (dark gray and hard)
H-53 Floor mastic (black)
H-89 Floor tile mastic (residue)
H-94 Pipe thermal system insulation (TSI) and covering
H-98 Gasket material
H-99 Woven hose insulation
H-110 Laboratory counter tops, sinks and splashguards (green)
H-111 Laboratory counter tops (dark gray)
H-112 Laboratory counter tops, sinks, splashguards, and pegboards (black)
H-120 Seam caulk (gray/light gray)
H-141 Beige/tan duct mastic
H-142 Red duct mastic
H-143 Maroon duct mastic
H-160 Fire doors
BUILDING SUMMARY: Building 103
Asbestos Material Locations Quantity Condition Friability
H-16 Roof flashing material Flashing around penthouse 140 SF Good Non-Friable
H-28 Seam caulk, olive-colored Throughout Unknown Good Non-Friable
H-23 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials – Building 103
H-16 Roof flashing material
H-28 Seam caulk, olive-colored
6.0 Photographs of ACM Materials – Building 103
H-23 Fire doors
BUILDING SUMMARY: 103 Smoke Shack
H-3 Roof materials Roof 250 SF Good Non-Friable
6.0 Photographs of ACM Materials – Building 103 Smoke Shack
H-3 Roof materials
BUILDING SUMMARY: Building 105
Area Asbestos Material Locations Quantity Condition Friability
H-5 Roof Materials Roof 5,000 SF Good Non-Friable
H-14 Fire Doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials – Building 105
H-5 Roof Materials
H-14 Fire Doors
BUILDING SUMMARY: Building 106
Asbestos Material Locations Quantity Condition Friability
H-20 Black mastic Tunnel, penetration at drain line on the ceiling 3 SF Good Non-Friable
H-24 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials – Building 106
H-20 Black mastic
H-24 Fire doors
BUILDING SUMMARY: Building 114
Area
H-7 Fire doors Throughout 20 SF per door Good Non-Friable
6.0 Photographs of ACM Materials – Building 114
H-7 Fire doors
7.0 ACM RISK ASSESSMENT FORMS
AHERA RESPONSE ACTIONS BASED ON HAZARD RANKING
HAZARD
RANK
REMOVAL
PRIORITY
AHERA CATEGORY RESPONSE ACTION REQUIRED BY
AHERA
7 1 Significantly Damaged Evacuate or isolate the area if needed. Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers).
Repair of TSI is allowed if feasible and safe. O&M required for all friable ACBM.
6 2 Damaged with Potential for Significant Damage
Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.
5 3 Damaged with Potential for Damage
Remove, enclose, encapsulate, or repair to correct damage.
O&M required for all friable
ACBM.
4 4 Damaged Remove, enclose, encapsulate, or repair to correct damage.
O&M required for all friable
ACBM.
3 5 Potential for Significant Damage
Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.
2 6 Potential for Damage O&M required for all friable
ACBM.
1 7 No Damage O&M required for all friable