00 01 10 Table of Contents_Rev 1 8.30.24.docx

DOCX document 48 KB Posted

Attached to
Y1DZ--VHA MINOR CONSTRUCTION Solicitation CANCELLED Project 544-329 Construct Eye Clinic Center Minor Construction Columbia, SC VAMC
Solicitation number
36C77624R0028
Issued by

About this file

This document is a table of contents for the final construction documents for a project to construct a new 15,000 GSF optometric facility at the William Jennings Bryan Dorn VA Medical Center in Columbia, SC. The project will include new construction, HVAC, utility work, interior finishes, site work, underground stormwater detention, and asbestos/lead abatement. The related federal contract opportunity, Solicitation #36C77624R0028, is for the construction of this Eye Clinic Center Minor Construction project. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center in Austin. The project aims to address the needs of VA patients and employees by providing a building tailored to the functional and operational requirements of the Optometry and Ophthalmology departments at the medical center.

View the file

Other files

File Type Posted
36C77624R0028 0007 - Signed.pdf PDF
36C77624R0028 0006 - Signed.pdf PDF
36C77624R0028 0005 - Signed.pdf PDF
Technical Questions Tracking Spreadsheet - 9-3-24- 36C77624R0028 - Construct Eye Clinic Columbia SC.docx DOCX document
RoomFinishes.pdf PDF
2024-08-29 544-329 BID DRAWING REVISIONS.pdf PDF
South Carolina Tax Language - 04.04.2024 - FINAL.docx DOCX document
01 00 00 General Requirements_rev 2_8.29.24.pdf PDF
36C77624R0028 0004 - Signed.pdf PDF
09 91 00 Painting_Rev 1 8.30.24.docx DOCX document
544 329 SOW 100_rev2.pdf PDF
Attachment 6 - 544-329 Eye Clinic CD Specs 8.19.24.pdf PDF
SIGN IN SHEET Site Visit 8.15.24.pdf PDF
Amendment 0003 - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8.19.24 - Signed.pdf PDF
Solicitation - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8.19.24.pdf PDF
Attachment 7 - 544-329 Equipment Cut Sheets Part 1.pdf PDF
Attachment 24 - Richland County Wage Rates 6.14.24.pdf PDF
Attachment 9 - 544-329 Equipment Cut Sheets Part 3.pdf PDF
Attachment 28 - Division Cost Breakdown - 5-29-24.xlsx XLSX spreadsheet
Attachment 22 - Site Visit Dorn VAMC Google Map.jpg JPG image
Attachment 20 - 2023-09-29 544-329 BID DRAWINGS_Part7.pdf PDF
Attachment 18 - 2023-09-29 544-329 BID DRAWINGS_Part5.pdf PDF
Attachment 17 - 2023-09-29 544-329 BID DRAWINGS_Part4.pdf PDF
Attachment 3 - 544 329 VAMC Columbia SC Asbestos Inspection columbia part 1.pdf PDF
Attachment 26 - 544 329 SOW 100_rev1.pdf PDF
Attachment 5 - 544 329 VAMC Columbia SC Asbestos Inspection Report All Buildi.pdf PDF
Attachment 6 - 544-329 Eye Clinic CD Specs_120823.pdf PDF
Attachment 10 - 544-329 Equipment Cut Sheets Part 4.pdf PDF
Solicitation - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8-8-24.pdf PDF
Attachment 12 - 544-329 Equipment Cut Sheets Part 6.pdf PDF
Attachment 23 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - 544-329 Equipment Cut Sheets Part 5.pdf PDF
Attachment 27 - 544 329 Brand Name J and A.pdf PDF
Attachment 2 - 544 329 Eye Clinic Equipment List.xlsx XLSX spreadsheet
Attachment 8 - 544-329 Equipment Cut Sheets Part 2.pdf PDF
Attachment 1 - 544 329 Eye Clinic ConstructionAssessmentPackage 100 Percent.pdf PDF
Attachment 21 - Site Visit Dorn VAMC Campus Map_B101 and Contractor Parking.pdf PDF
Attachment 14 - 2023-09-29 544-329 BID DRAWINGS_Part1.pdf PDF
Attachment 25 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 6-2024.docx DOCX document
Attachment 16 - 2023-09-29 544-329 BID DRAWINGS_Part3.pdf PDF
Attachment 4 - 544 329 VAMC Columbia SC Asbestos Inspection columbia part 2.pdf PDF
Attachment 15 - 2023-09-29 544-329 BID DRAWINGS_Part2.pdf PDF
Attachment 13 - 544-329 Geotech Report.pdf PDF
Attachment 19 - 2023-09-29 544-329 BID DRAWINGS_Part6.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14 Eye Clinic Center – Final Construction Documents WJBD Veterans Affairs Medical Center – Columbia, SC Charlotte Engineers, LLP 08-18-22

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 SPECIAL SECTIONS

00 01 15
List of Drawing Sheets

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build)
01 33 23
Shop Drawings, Product Data, and Samples
01 35 26
Safety Requirements
01 42 19
Reference Standards
01 45 00
Quality Control
01 45 29
Testing Laboratory Services
01 45 35
Special Inspections
01 57 19
Temporary Environmental Controls
01 58 16
Temporary Interior Signage
01 71 21
Specialty Engineering Requirements
01 74 19
Construction Waste Management
01 81 13
Sustainable Construction Requirements
01 91 00
General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
02 82 11
Traditional Asbestos Abatement

DIVISION 03 – CONCRETE

03 30 53
(Short-Form) Cast-in-Place Concrete
03 45 00
Glass Fiber Reinforced Concrete

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
04 05 13
Masonry Mortaring
04 05 16
Masonry Grouting
04 20 00
Unit Masonry
04 72 00
Cast Stone Masonry

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
05 21 00
Steel Joist Framing
05 31 00
Steel Decking
05 40 00
Cold-Formed Metal Framing
05 50 00
Metal Fabrications

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
06 16 63
Cementitious Sheathing

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 08 00
Facility Exterior Closure Commissioning
07 13 00
Sheet Waterproofing
07 19 16
Silane Water Repellents
07 21 13
Thermal Insulation
07 22 00
Roof and Deck Insulation
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
07 60 00
Flashing and Sheet Metal
07 71 00
Roof Specialties
07 72 00
Roof Accessories
07 84 00
Firestopping
07 92 00
Joint Sealants

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
08 14 00
Interior Wood Doors
08 31 13
Access Doors and Frames
08 41 13
Aluminum-Framed Entrances and Storefronts
08 44 13
Glazed Aluminum Curtain Walls
08 71 00
Door Hardware
08 71 13
Automatic Door Operators
08 80 00
Glazing

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
09 22 16
Non-Structural Metal Framing
09 29 00
Gypsum Board
09 30 13
Ceramic/Porcelain Tiling
09 51 00
Acoustical Ceilings
09 65 13
Resilient Base and Accessories
09 65 16
Resilient Sheet Flooring
09 65 19
Resilient Tile Flooring
09 67 23.20
Resinous Epoxy Base with Vinyl Chip Broadcast (RES 2)
09 68 00
Carpeting
09 91 00
Painting
09 96 59
Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2)

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
10 14 00
Signage
10 21 23
Cubicle Curtain Tracks
10 26 00
Wall and Door Protection
10 28 00
Toilet, Bath, and Laundry Accessories
10 44 13
Fire Extinguisher Cabinets
10 73 15
Prefabricated Architectural Canopies

DIVISION 12 – FURNISHINGS

12 24 00
Window Shades
12 24 21
Lightproof Shades
12 34 00
Manufactured Plastic Casework
12 36 00
Countertops

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components

DIVISION 21- FIRE SUPPRESSION

21 07 11
Fire Suppression Insulation
21 08 00
Commissioning of Fire Suppression System
21 13 13
Wet-Pipe Sprinkler Systems
21 13 16
Dry-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
22 05 12
General Motor Requirements for Plumbing Equipment
22 05 19
Meters and Gages for Plumbing Piping
22 05 23
General-Duty Valves for Plumbing Piping
22 05 33
Heat Tracing for Plumbing Piping
22 07 11
Plumbing Insulation
22 08 00
Commissioning of Plumbing Systems
22 11 00
Facility Water Distribution
22 11 23
Domestic Water Pumps
22 13 00
Facility Sanitary and Vent Piping
22 33 00
Electric Domestic Water Heaters
22 40 00
Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11
Common Work Results for HVAC
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
23 05 93
Testing, Adjusting, and Balancing for HVAC
23 07 11
HVAC and Boiler Plant Insulation
23 08 00
Commissioning of HVAC Systems
23 09 23
Direct-Digital Control System for HVAC
23 21 11-1
Duplex Pumping Module with Air Control
23 21 13
Hydronic Piping
23 21 23
Hydronic Pumps
23 23 00
Refrigerant Piping
23 25 00
HVAC Water Treatment
23 31 00
HVAC Ducts and Casings
23 34 00
HVAC Fans
23 36 00
Air Terminal Units
23 37 00
Air Outlets and Inlets
23 40 00
HVAC Air Cleaning Devices
23 64 00
Packaged Water Chillers
23 72 00
Air-to-Air Energy Recovery Equipment
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
23 81 00
Decentralized Unitary HVAC Equipment

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
26 05 19
Low-Voltage Electrical Power Conductors and Cables
26 05 26
Grounding and Bonding for Electrical Systems
26 05 33
Raceway and Boxes for Electrical Systems
26 05 41
Underground Electrical Construction
26 05 73
Overcurrent Protective Device Coordination Study
26 08 00
Commissioning of Electrical Systems
26 09 23
Lighting Controls
26 22 00
Low-Voltage Transformers
26 24 16
Panelboards
26 27 26
Wiring Devices
26 29 11
Motor Controllers
26 29 21
Enclosed Switches and Circuit Breakers
26 41 00
Facility Lightning Protection
26 43 13
Surge Protective Devices
26 51 00
Interior Lighting
26 56 00
Exterior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
27 05 26
Grounding and Bonding for Communications Systems
27 05 33
Raceways and Boxes for Communications Systems
27 08 00
Commissioning of Communications Systems
27 10 00
Control, Communication and Signal Wiring
27 11 00
Communications Equipment Room Fittings
27 15 00
Communications Structured Cabling
27 31 00
Voice Communications Switching and Routing Equipment
27 51 16
Public Address and Mass Notification Systems
27 52 23
Nurse Call and Coe Blue Systems

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
28 05 13
Conductors and Cables for Electronic Safety and Security
28 05 26
Grounding and Bonding for Electronic Safety and Security
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
28 08 00
Commissioning of Electronic Safety and Security Systems
28 13 00
Physical Access Control System
28 23 00
Video Surveillance
28 31 00
Fire Detection and Alarm

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
31 23 19
Dewatering

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
32 12 16
Asphalt Paving
32 14 16
Brick Unit Paving
32 17 23
Pavement Markings
32 84 00
Planting Irrigation
32 90 00
Planting
32 90 00.01
Grassing

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
33 10 00
Water Utilities
33 30 00
Sanitary Sewer Utilities
33 40 00
Storm Sewer Utilities
33 46 13
Foundation Drainage

00 01 10-10

File details come from the government source that posted it. Updated .