Attachment 28 - Division Cost Breakdown - 5-29-24.xlsx

XLSX spreadsheet 253 KB Posted

Attached to
Y1DZ--VHA MINOR CONSTRUCTION Solicitation CANCELLED Project 544-329 Construct Eye Clinic Center Minor Construction Columbia, SC VAMC
Solicitation number
36C77624R0028
Issued by

About this file

This document is a Division Cost Breakdown Estimate Worksheet for a federal construction project. The project involves constructing a new 15,000 gross square foot optometric facility at the William Jennings Bryan Dorn VA Medical Center in Columbia, SC. The project will address the needs of VA patients and employees and includes new construction, HVAC, utility work, interior finishes, site work, and other related construction activities. The worksheet provides a detailed cost breakdown by construction division, including labor, materials, and total costs. The related federal contract opportunity has a solicitation number of 36C77624R0028 and is being issued by the Department of Veterans Affairs Technology Acquisition Center in Austin.

View the file

Other files

File Type Posted
36C77624R0028 0007 - Signed.pdf PDF
36C77624R0028 0006 - Signed.pdf PDF
36C77624R0028 0005 - Signed.pdf PDF
Technical Questions Tracking Spreadsheet - 9-3-24- 36C77624R0028 - Construct Eye Clinic Columbia SC.docx DOCX document
RoomFinishes.pdf PDF
2024-08-29 544-329 BID DRAWING REVISIONS.pdf PDF
South Carolina Tax Language - 04.04.2024 - FINAL.docx DOCX document
01 00 00 General Requirements_rev 2_8.29.24.pdf PDF
36C77624R0028 0004 - Signed.pdf PDF
09 91 00 Painting_Rev 1 8.30.24.docx DOCX document
544 329 SOW 100_rev2.pdf PDF
00 01 10 Table of Contents_Rev 1 8.30.24.docx DOCX document
Attachment 6 - 544-329 Eye Clinic CD Specs 8.19.24.pdf PDF
SIGN IN SHEET Site Visit 8.15.24.pdf PDF
Amendment 0003 - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8.19.24 - Signed.pdf PDF
Solicitation - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8.19.24.pdf PDF
Attachment 7 - 544-329 Equipment Cut Sheets Part 1.pdf PDF
Attachment 24 - Richland County Wage Rates 6.14.24.pdf PDF
Attachment 9 - 544-329 Equipment Cut Sheets Part 3.pdf PDF
Attachment 22 - Site Visit Dorn VAMC Google Map.jpg JPG image
Attachment 20 - 2023-09-29 544-329 BID DRAWINGS_Part7.pdf PDF
Attachment 18 - 2023-09-29 544-329 BID DRAWINGS_Part5.pdf PDF
Attachment 17 - 2023-09-29 544-329 BID DRAWINGS_Part4.pdf PDF
Attachment 3 - 544 329 VAMC Columbia SC Asbestos Inspection columbia part 1.pdf PDF
Attachment 26 - 544 329 SOW 100_rev1.pdf PDF
Attachment 5 - 544 329 VAMC Columbia SC Asbestos Inspection Report All Buildi.pdf PDF
Attachment 6 - 544-329 Eye Clinic CD Specs_120823.pdf PDF
Attachment 10 - 544-329 Equipment Cut Sheets Part 4.pdf PDF
Solicitation - 36C77624R0028 - Construct Eye Clinic - Columbia SC 8-8-24.pdf PDF
Attachment 12 - 544-329 Equipment Cut Sheets Part 6.pdf PDF
Attachment 23 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - 544-329 Equipment Cut Sheets Part 5.pdf PDF
Attachment 27 - 544 329 Brand Name J and A.pdf PDF
Attachment 2 - 544 329 Eye Clinic Equipment List.xlsx XLSX spreadsheet
Attachment 8 - 544-329 Equipment Cut Sheets Part 2.pdf PDF
Attachment 1 - 544 329 Eye Clinic ConstructionAssessmentPackage 100 Percent.pdf PDF
Attachment 21 - Site Visit Dorn VAMC Campus Map_B101 and Contractor Parking.pdf PDF
Attachment 14 - 2023-09-29 544-329 BID DRAWINGS_Part1.pdf PDF
Attachment 25 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 6-2024.docx DOCX document
Attachment 16 - 2023-09-29 544-329 BID DRAWINGS_Part3.pdf PDF
Attachment 4 - 544 329 VAMC Columbia SC Asbestos Inspection columbia part 2.pdf PDF
Attachment 15 - 2023-09-29 544-329 BID DRAWINGS_Part2.pdf PDF
Attachment 13 - 544-329 Geotech Report.pdf PDF
Attachment 19 - 2023-09-29 544-329 BID DRAWINGS_Part6.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 1 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONS$ - 0
DIVISION 01-GENERAL REQUIREMENTS$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0
DIVISION 03-CONCRETE$ - 0
DIVISION 04-MASONRY$ - 0
DIVISION 05-METALS$ - 0
DIVISION 06-WOOD, PLASTICS, AND COMPOSITES$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 08-OPENINGS$ - 0
DIVISION 09-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
DIVISION 48-ELECTRICAL POWER GENERATION$ - 0
SUBTOTAL$ - 0
OVERHEAD@10.00%$ - 0
PROFIT@10.00%$ - 0
BONDS@3.00%$ - 0
PROJECT TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

Department of Veterans Affairs

DIVISION 00

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 2 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 01

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 3 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 01-GENERAL REQUIREMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 02

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 4 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 02-EXISTING CONDITIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 03

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 5 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 03-CONCRETEQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 04

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 6 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 04-MASONRYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 05

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 7 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 05-METALSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 06

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 8 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 06-WOOD, PLASTICS, AND COMPOSITESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 07

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 9 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 07-THERMAL AND MOISTURE PROTECTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 08

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 10 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 08-OPENINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 09

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 11 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 09-FINISHESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 10

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 12 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 10-SPECIALTIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 11

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 13 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 11-EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 12

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 14 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 12-FURNISHINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 13

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 15 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 13-SPECIAL CONSTRUCTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 14

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 16 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 14-CONVEYING EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 21

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 17 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 21-FIRE SUPPRESSIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 22

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 18 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 22-PLUMBINGQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 23

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 19 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)QTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 25

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 20 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 25-INTEGRATED AUTOMATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 26

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 21 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 26-ELECTRICALQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 27

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 22 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 27-COMMUNICATIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 28

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 23 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 28-ELECTRONIC SAFETY AND SECURITYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 31

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 24 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 31-EARTHWORKQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 32

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 25 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 32-EXTERIOR IMPROVEMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 33

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 26 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 33-UTILITIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 34

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 27 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 34-TRANSPORTATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 48

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 28 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 48-ELECTRICAL POWER GENERATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A image1.png

File details come from the government source that posted it. Updated .