Attachment 4 - Pricing Table.pdf
PDF 250 KB Posted
- Solicitation number
- 2031ZA26R00027
About this file
This is a cost proposal template for federal contract 2031ZA26R00027 for cooling tower replacement work at the District Currency Facility (DCF). The project is a design-build effort requiring a complete assessment of the existing scope of work, recommendations for scope modifications, demolition, and replacement of two existing Evapco cooling towers.
The proposal template separates costs between prime contractor and subcontractor work, with line items for direct materials, sales tax on materials, direct labor, insurance/taxes/fringe benefits, rental equipment, sales tax on rental equipment, equipment ownership, field overhead, home office overhead, and profit. The template calculates subtotals for each section, then consolidates prime and subcontractor work with additional prime overhead on subcontractor costs and prime profit calculations. A prime contractor bond premium line item is included as a percentage of total cost. The document includes a detailed breakdown section for itemizing work by quantity and unit, with separate columns for material costs, labor costs, and equipment costs (both rental and owned). The template requires completion of prime contractor name, subcontractor name, preparer signature and title, and date. No pricing information, response deadline, or award date is populated in this template version.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL FOR 2031ZA26R00027
DATE:
TITLE:
OFFICE:
DESCRIPTION OF WORK:
PRIME CONTRACTOR'S WORK Revisions/Comments 1 Direct Materials 2 Sales Tax on Materials 0% of line 1 0% 3 Direct Labor 4 Insurance, Taxes, & Fringe Benefits 0% of line 3 0% 5 Rental Equipment 6 Sales Tax on Rental Equipment 0% of line 5 0% 7 Equipment Ownership 8 SUBTOTAL Add lines 1-7 9 Field Overhead 0% of line 8 0%
10 SUBTOTAL Add lines 8 & 9 Prime Remarks:
SUB-CONTRACTOR'S WORK Revisions/Comments 11 Direct Materials 12 Sales Tax on Materials 0% of line 11 0% 13 Direct Labor 14 Insurance, Taxes, & Fringe Benefits 0% of line 13 0% 15 Rental Equipment 16 Sales Tax on Rental Equipment 0% of line 15 0% 17 Equipment Ownership 18 SUBTOTAL add lines 11-17 19 Field Overhead 0% of line 18 0% 20 SUBTOTAL add lines 18 & 19 21 Home Office Overhead 0% of line 20 0% 22 Profit 0% of line 20 0% 23 SUBTOTAL Add lines 20 - 22
Sub Remarks:
24 Prime Contractor's Work from line 10 25 Sub-contractor's Work from line 23 26 SUBTOTAL add lines 24 & 25 27 Prime Overhead on sub-contractor 0% of line 25 0% 28 Prime's Home Office Overhead 0% of line 24 0% 29 Prime's Profit 0% of line 26 0% 30 SUBTOTAL add lines 26 - 29 31 Prime Contractor's Bond Premium % of line 30 % #VALUE!
32 TOTAL COST add lines 30 & 31 #VALUE!
Estimate time extension and justifications:
Prime Contractor name:
Sub-contractor name:
Signature & Title of preparer: Date
Cooling Towers
District Currency Facility (DCF)
This project is a the design build project, requirements, and deliverables, including, but not limited to, a complete assessment of the scope of work, recommendation of the scope of work, demolition, and the replacement of two existing Evapco cooling towers.
BREAKDOWN OF DIRECT COSTS Date:
ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT
Prime Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total
DIRECT Prime Contractor's TOTALS R Total (Rental) O Total (Owned)
ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT
Sub-Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total
Construction Contractor
R Total (Rental) O Total (Owned)
PROPOSAL FOR 2031ZA26R00027