Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf

PDF 629 KB Posted

Attached to
Cooling Tower, Roofing, and Structural Construction
Solicitation number
2031ZA26R00027
Issued by

About this file

This document is a chiller plant flow schematic—mechanical diagram illustrating the piping and equipment configuration for a cooling system. The schematic depicts four cooling towers (Cooling Towers 1–4) connected to a centralized chilled water distribution system serving multiple chillers (Chillers 1–4) and a plate and frame heat exchanger. The system includes connections to an existing chilled water system and incorporates air separation equipment. Key components shown include pressure gauges (ranging 0–100 PSIG), thermometers (0–101 degrees Fahrenheit), Pete's plugs (1/2" pressure and temperature plugs), flow meters, and butterfly valves with pneumatic actuators. The piping utilizes various diameters from 8" to 20" diameter chilled water supply (CHWS), chilled water return (CHWR), condenser water supply (CWS), and condenser water return (CWR) lines. The schematic includes notes indicating two modifications: replacing an existing 14" control valve with a new butterfly valve with pneumatic actuator, and adding a manual butterfly valve at a specified location. The scale is noted as "W-2:1 NON-NOTES" and references the file location as "M02-schematic-BEPVFD.dwg," suggesting this is a facility master drawing for a mechanical system upgrade or retrofit project.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .