EVAPCO Submittal Package Summary

This is an EVAPCO submittal package for a cooling tower unit delivered on October 13, 1999. The package documents a factory-assembled, induced draft, counterflow cooling tower (Model 1 AT 424-936) with EVAPCO Serial Number 997139M, manufactured for American Combustion, Inc. by engineer Washington Gas Energy Systems, Inc. The submittal includes unit certified drawings, thermal performance guarantee, recommended steel support drawings, and mechanical specifications. Accessory information is provided for selected included components: Electric Water Level Control, Vibration Cut-Out Switch, External Service Platform, and Hot Water/Steam Coil General Arrangement.

The mechanical specifications detail construction of Type 304 stainless steel casing and pan with stainless steel channel and angle supports, brass make-up float valve with adjustable plastic float, and all-stainless-steel pan strainer with removable perforated screens. The cooling tower features axial propeller fan constructed of aluminum alloy and statically balanced, installed in closely fitted cowl with vertical inlet. Fan shaft is solid steel, ground and polished with rust preventative coating. Bearings are heavy-duty, self-aligning ball type designed for minimum L-10 life of 75,000 hours. The fan motor is totally enclosed, ball bearing electric motor suitable for moist air service with 1.15 service factor design. Fill consists of polyvinyl chloride (PVC) cross-fluted design bonded for strength and durability. Water distribution systems utilize precision-molded ABS spray nozzles with large orifices to eliminate clogging. Eliminators and louvers are constructed of PVC in easily handled sections. EVAPCO provides a five-year total product warranty covering all defects in materials and workmanship, including structural components, fill supports, drift eliminators, louvers and fan discharge screen, with motor and drive system covered by comprehensive five-year warranty against defects in materials and workmanship. Thermal performance is warranted for one year from installation completion in accordance with good engineering practices, not to exceed eighteen months from shipment date.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .