Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf

PDF 3 MB Posted

Attached to
Cooling Tower, Roofing, and Structural Construction
Solicitation number
2031ZA26R00027
Issued by

About this file

This is a General Decision wage determination document (DC20260001) issued by the U.S. Department of Labor for heavy and highway construction projects in the District of Columbia, effective August 27, 2026. The document establishes prevailing wage rates and fringe benefits for various construction classifications required on federally funded or federally assisted construction contracts in Washington, D.C.

The wage determination lists approximately 40 construction classifications with corresponding hourly rates and fringe benefit amounts. Notable classifications include asbestos worker/heat and frost insulator ($40.77 base rate with $20.17 fringes), boilermakers ($47.37 with $25.60 fringes), electricians ($59.50 with $23.06 fringes), ironworkers ($37.86 to $31.88 with $25.86 to $23.78 fringes), laborers in various categories ($32.25 to $37.95 with $8.70 fringes), and truck drivers ($31.75 to $33.75 with $7.30 fringes). The document includes six modifications with publication dates ranging from January 23, 2026 to August 27, 2026. The rates reflect union agreements and are identified by rate type identifiers (union negotiated, survey, weighted union average, or state-adopted). The determination applies Davis-Bacon Act requirements and Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage for federal contractors, with guidance provided for filing wage determination appeals with the Department of Labor's Wage and Hour Division.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .