Attachment 20 Tower_submittal.pdf

PDF 116 KB Posted

Attached to
Cooling Tower, Roofing, and Structural Construction
Solicitation number
2031ZA26R00027
Issued by

About this file

This is an EVAPCO Equipment Production Order (Confidential) documenting manufacturing specifications for cooling tower equipment ordered by American Combustion. The order, issued October 6, 1999, with a scheduled completion date of November 12, 1999, specifies the production of six pieces of equipment featuring dual tag numbers CT-1, CT-2, CT-1A, CT-1B, CT-2A, and CT-2B.

The equipment includes eight 5-60 PA gallon screens or eight 5-69 PA pressure swing transfer fans; four 132-inch, 7-blade, 380-millimeter fans with 12-degree pitch and RAO 2 11/16 bearing assemblies; and four cadmium-plated fan bushings. The cooling tower units feature 24x36-inch pans with plenum, four 10-inch outlets, and eight 35-inch and 60-inch strainers. The casings contain four 12x18/4-layer configurations with 24 nozzles, filled in four layers with pointed and alternative tips using blocks 107 and 71 in specified quantities. The fan motor specifications include four 60-horsepower units operating at 230-460 volts, 60 hertz, 3-phase at 1800 RPM. Detailed drive configurations include four 6B7.6 and 6B 38.0 (AL) drivers with 13-22SP and 13-222P designations, plus associated bushings and belts. Accessories encompass remote sumps, electric level controls, ladders, jib booms, vibration switches, flange connections, stainless steel components, and steam coils. Remarks specify 10-inch BFN grooved inlets, 10-inch flanged bottoms, external service platforms with ladder and safety cage, three-foot fan cylinder extensions, and ground-polished steel fan shafts with galvanized fan screens and bolt provisions for helicopter lifting equipment.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .