This is a proposal form for federal contract opportunity 2031ZA26R00027 for cooling tower replacement and design-build services at the District Currency Facility (DCF). The project scope includes a complete assessment of existing cooling tower conditions, recommendations for scope modifications, demolition of two existing Evapco cooling towers, and their replacement with new units.

The proposal form provides separate cost breakdowns for prime contractor and sub-contractor work, with line items for direct materials, sales tax on materials, direct labor, insurance/taxes/fringe benefits, rental equipment, sales tax on rental equipment, equipment ownership, field overhead, home office overhead, and profit. The document includes calculation formulas directing contractors to add specified line items at designated percentages and includes a section for prime contractor's bond premium. Supporting pages contain a detailed breakdown of direct costs table organized by items of work, quantity, unit, material costs, labor costs, and equipment costs (both rental and owned) for both prime and sub-contractors. The form requires identification of the prime contractor and sub-contractor names, signature of the proposal preparer with date, and space to estimate time extension with justifications. All percentage rates default to 0% as presented in the template, indicating this is a blank proposal form awaiting contractor completion.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL FOR 2031ZA26R00027

DATE:

TITLE:

OFFICE:

DESCRIPTION OF WORK:

PRIME CONTRACTOR'S WORK Revisions/Comments 1 Direct Materials 2 Sales Tax on Materials 0% of line 1 3 Direct Labor 4 Insurance, Taxes, & Fringe Benefits 0% of line 3 5 Rental Equipment 6 Sales Tax on Rental Equipment 0% of line 5 7 Equipment Ownership 8 SUBTOTAL Add lines 1-7 9 Field Overhead 0% of line 8

10 SUBTOTAL Add lines 8 & 9 Prime Remarks:

SUB-CONTRACTOR'S WORK Revisions/Comments 11 Direct Materials 12 Sales Tax on Materials 0% of line 11 13 Direct Labor 14 Insurance, Taxes, & Fringe Benefits 0% of line 13 15 Rental Equipment 16 Sales Tax on Rental Equipment 0% of line 15 17 Equipment Ownership 18 SUBTOTAL add lines 11-17 19 Field Overhead 0% of line 18 20 SUBTOTAL add lines 18 & 19 21 Home Office Overhead 0% of line 20 22 Profit 0% of line 20 23 SUBTOTAL Add lines 20 - 22

Sub Remarks:

24 Prime Contractor's Work from line 10 25 Sub-contractor's Work from line 23 26 SUBTOTAL add lines 24 & 25 27 Prime Overhead on sub-contractor 0% of line 25 28 Prime's Home Office Overhead 0% of line 24 29 Prime's Profit 0% of line 26 30 SUBTOTAL add lines 26 - 29 31 Prime Contractor's Bond Premium % of line 30 32 TOTAL COST add lines 30 & 31

Estimate time extension and justifications:

Prime Contractor name:

Sub-contractor name:

Signature & Title of preparer: Date

Cooling Towers

District Currency Facility (DCF)

This project is a the design build project, requirements, and deliverables, including, but not limited to, a complete assessment of the scope of work, recommendation of the scope of work, demolition, and the replacement of two existing Evapco cooling towers.

BREAKDOWN OF DIRECT COSTS Date:

ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT

Prime Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total

DIRECT Prime Contractor's TOTALS R Total (Rental) O Total (Owned)

ITEMS OF WORK FOR QTY UNIT MATERIAL LABOR R EQUIPMENT

Sub-Contractor Unit Cost Total Cost Unit Cost Total Cost O Days Rate Total

Construction Contractor

R Total (Rental) O Total (Owned)

PROPOSAL FOR 2031ZA26R00027