Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf

PDF 3 MB Posted

Attached to
Cooling Tower, Roofing, and Structural Construction
Solicitation number
2031ZA26R00027
Issued by

About this file

Document Summary

This is an Emergency Action Plan (EAP) and Fire Prevention Plan (FPP) for the Bureau of Engraving and Printing (BEP) Washington, D.C. Facility, effective February 22, 2024 (Revision #8). The document serves as an operational guideline for all BEP staff, contractors, visitors, and on-site personnel regarding emergency procedures and fire safety protocols at the facility.

The plan establishes procedures for reporting emergencies by contacting the Police Communications Center (CPOC) at 874-0911 or using Emergency Fire Phones located in stairwells. Fire response procedures permit trained employees to use fire extinguishers at their discretion, with annual maintenance inspections conducted by the Office of Facilities Support. Emergency evacuation procedures require all personnel except essential staff to immediately exit using the nearest stairwell (not elevators) and assemble at designated assembly areas specific to each building section, where supervisors account for employees. The plan designates stairwells as refuge areas for those unable to evacuate due to injury or physical limitation and includes sheltering-in-place (SIP) locations for situations where building evacuation poses greater hazards. Evacuation drills are conducted with sufficient frequency to familiarize occupants with procedures, coordinated by the Office of Environment, Health & Safety (OEHS) with the Office of Security (OS) and Office of Facilities Support (OFS).

The Fire Prevention Plan details major fire hazards including accumulation of ordinary combustibles, flammable liquids, solvents, compressed gas cylinders, and diesel fuel tanks, specifying proper storage, handling requirements, and fire control equipment for each. Fire ignition sources and control procedures address energized electrical equipment, hot work operations, laboratory equipment, cooking equipment, and smoking (prohibited in BEP buildings). The plan mandates training for all covered employees upon initial assignment, when responsibilities change, and when the plan is revised. Individual critical plant operational procedures are contained in Appendix B, with specific emergency evacuation procedures for personnel at the Wastewater Pretreatment Plant and Power Plant detailed in separate memoranda.

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .