This document is a Fall Protection Procedure (75D-04.0-11, Revision #3, effective August 13, 2020) establishing minimum requirements and methods for protecting workers from fall hazards at the Department of Corrections (DCF) facility in accordance with OSHA standards. The procedure applies to all DCF employees and contractors working at heights greater than four feet and in controlled access areas with potential fall hazards. Four approved fall protection systems are specified: guardrails with top-rails at least 42 inches high and capable of withstanding 200 pounds of horizontal load; personal fall arrest systems (PFAS) with anchor points supporting 5,000 pounds per employee, non-exceeding system weight capacity, and deceleration distances not exceeding six feet; personal fall restraint systems (PFRS) with 3,000-pound-rated anchor points and horizontal lifeline arrangements preventing unprotected edge access; and safety nets with mesh no wider than six inches, installed no more than 30 feet below the work surface, and maintaining specific horizontal and vertical distances from the work surface based on fall height (8 feet for up to 5 feet, 10 feet for 5-10 feet, and 13 feet for more than 10 feet).

The procedure delineates specific responsibilities among the Office of Environment, Health, and Safety (OEHS), Office of Facilities Support (OFS), supervisors, contracting officers, and employees/contractors. OEHS provides overall program management, develops hazard analyses, identifies positions requiring fall protection training, and reviews renovation and construction project safety plans. OFS and supervisors must address identified hazards, maintain equipment, submit written safety plans for in-house elevated work projects, and ensure trained employees are assigned to elevated work. Contractors must submit site-specific safety plans prior to work and provide written fall protection training certifications to contracting officers. All employees and contractors must complete assigned training, work only from heights with adequate fall protection, report hazards immediately, inspect equipment before use, and use equipment only as manufacturer-designed. The document includes detailed procedures for Annex Building roofs (with 100 percent tie-off policy within six feet of leading edges and restricted penthouse access), Main Building roofs (similar tie-off requirements with specific lanyard attachment protocols), and elevated work platforms including scaffolds (with comprehensive design, erection, access, and safety requirements).

View the file

Other files

File Type Posted
Attachment 16 M03-vfd plan-BEPVFD.pdf PDF
Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf PDF
Attachment 29 Chiller Plan Upgrade M-1_recover.pdf PDF
Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf PDF
Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf PDF
Attachment 14 Evapco performance data.pdf PDF
Attachment 18 Plate and Frame HX Information.pdf PDF
Attachment 8 - Site Visit Sign In Sheet.pdf PDF
Attachment 19 Structural Support for VFDs.pdf PDF
Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf PDF
Attachment 31 Pictures.pdf PDF
Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf PDF
Attachment 25 ax-dcm-06 Main Roof Top.pdf PDF
Attachment 20 Tower_submittal.pdf PDF
Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf PDF
Attachment 27 ax-dca-09 Annex Roof Top.pdf PDF
Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf PDF
Attachment 32 Pictures.pdf PDF
Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf PDF
Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf PDF
2031ZA26R00027 Revision 01 11052026.pdf PDF
Attachment 30 Pictures.pdf PDF
Attachment 26 M-DCA-09-1001023-HV.pdf PDF
Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf PDF
Attachment 23 BEP-M1R613 w chiller Layout1.pdf PDF
2031ZA26R00027 0002.pdf PDF
2031ZA26R00027 0001.pdf PDF
Attachment 4 - Pricing Table.pdf PDF
Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment 3 - Statement of Work - Cooling Towers.pdf PDF
2031ZA26R00027.pdf PDF
Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf PDF
Attachment 1 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Initial Staffing Plan.pdf PDF
Attachment 7 - Monthly Workforce Report.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .