Attachment_3_C-12_Inspection_and_Acceptance.pdf
PDF 804 KB Posted
- Attached to
- Contractor Logistic Support (CLS) Services for USAF C-12 Aircraft Fleet Federal contract opportunity
- Solicitation number
- FA8134-25-R-B002
About this file
This is Section E (Inspection and Acceptance) of a C-12 Contractor Logistics Support Services contract which outlines the government's inspection and quality requirements. The document details the government's right to conduct in-process reviews of aircraft being serviced at various stages, including initial evaluation, completion of conditional maintenance, flight control rigging, and prior to functional flight checks.
The contractor must comply with ISO 9001:2015 quality standards and flow down these requirements to subcontractors for critical and complex items. Written findings from in-process reviews will be submitted to the Contracting Officer and Program Manager's Office, with any deficiencies documented and corrective actions provided through the Contracting Officer. The document incorporates standard FAR clauses related to fixed-price service inspection, responsibility for supplies, and material inspection and receiving reports.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract: FA8134-25-R-B002
C-12 Contractor Logistics Support Services
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
Page E-1
Contract: FA8134-25-R-B002
ATTACHMENT 3 – INSPECTION AND ACCEPTANCE
E-1. IN-PROCESS REVIEW
(a) Notwithstanding the right to inspection granted the Government under FAR 52.246-4, “Inspection of Service”, the Government may perform an in-process review on the aircraft being serviced. The in-process review is intended to ensure conformance to contractual technical requirements. The review may be conducted at various process stages, such as, but not limited to: following initial evaluation (inspection); following completion of conditional maintenance; during rigging of flight controls; or, prior to functional flight checks.
(b) Written findings resulting from the in-process review will be submitted to the Contracting Officer and the Program Manager’s (PM) Office. Any quality and/or process deficiencies noted will be documented and instruction for corrective action will be provided to the Contractor through the Contracting Officer.
E-2. CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984 252.246-7000 Material Inspection And Receiving Report MAR 2008
E-3. CLAUSES INCORPORATED BY FULL TEXT
52.246-11 Higher-Level Contract Quality Requirement (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
1 ISO 9001 2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.