Attachment_3_C-12_Inspection_and_Acceptance.pdf

PDF 804 KB Posted

Attached to
Contractor Logistic Support (CLS) Services for USAF C-12 Aircraft Fleet Federal contract opportunity
Solicitation number
FA8134-25-R-B002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This is Section E (Inspection and Acceptance) of a C-12 Contractor Logistics Support Services contract which outlines the government's inspection and quality requirements. The document details the government's right to conduct in-process reviews of aircraft being serviced at various stages, including initial evaluation, completion of conditional maintenance, flight control rigging, and prior to functional flight checks.

The contractor must comply with ISO 9001:2015 quality standards and flow down these requirements to subcontractors for critical and complex items. Written findings from in-process reviews will be submitted to the Contracting Officer and Program Manager's Office, with any deficiencies documented and corrective actions provided through the Contracting Officer. The document incorporates standard FAR clauses related to fixed-price service inspection, responsibility for supplies, and material inspection and receiving reports.

View the file

Other files for this federal contract opportunity

Other files attached to Contractor Logistic Support (CLS) Services for USAF C-12 Aircraft Fleet, newest first.
File Type Posted
C-12_CLS_Questions and Answers_Rev02.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors_Rev02_Corrected.pdf PDF
Attachment_9_C-12_Pricing_Matrix_Rev01.xlsx XLSX spreadsheet
SF30_Amendment_of_Solicitation_FA813425RB0020002.pdf PDF
FA813425RB002_Amendment_02_Clause_Set_Updates.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors_Rev02.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors_Rev02 (DRAFT).pdf PDF
C-12_CLS_Questions and Answers_Rev01.pdf PDF
FA813425RB002 Amendment 02 Clause Set Updates (DRAFT).pdf PDF
Attachment_10_C-12_Wage_Determinations_(CBA)_Rev01.pdf PDF
SF30_Amendment_of_Solicitation_FA813425RB0020001.pdf PDF
Attachment_8_C-12_Section M -Evaluation Factors for Award_Rev01.pdf PDF
Attachment_1_C-12_CLINs_Descriptions_and_Specifications_Rev01.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors_Rev01.pdf PDF
Exhibit A_C-12_CLS_Contract_Data_Requirements_List_(CDRLs)_Rev01.pdf PDF
Attachment_5_C-12_Performance_Work_Statement_Rev01.pdf PDF
Attachment_10_C-12_Wage_Determinations_(CBA)_Rev01.pdf PDF
Attachment_12_C-12_Incentive_Plan_Rev01.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors_Rev01_DRAFT.pdf PDF
C-12_CLS_Questions and Answers.pdf PDF
PPI_Tool_Download_Instruction.docx DOCX document
C-12 CLS Pre-proposal Registration Fillable Form.pdf PDF
C-12 CLS Pre-Proposal Conference Instructions.pdf PDF
Contractor Vendor Controlled Documents betaSAM.pdf PDF
JCP Portal Access Guide.pdf PDF
Exhibit A_C-12_CLS_Contract_Data_Requirements_List_(CDRLs).pdf PDF
Attachment_1_C-12_CLINs_Descriptions_and_Specifications.pdf PDF
Attachment_4_C-12_Deliveries or Performance.pdf PDF
C-12 CLS RFP Questions.xlsx XLSX spreadsheet
Attachment_6_C-12_Government_Furnished_Property_List.pdf PDF
Attachment_7_C-12_Section L-Instruction to Offerors.pdf PDF
Attachment_13_C-12_ID_and_Assertion_of_Use_Release_or_Disclosure_Restrictions_Clause.pdf PDF
Attachment_9_C-12_ Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_10_C-12_Wage_Determinations_(CBA).pdf PDF
Attachment_5_C-12_Performance_Work_Statement.pdf PDF
Attachment_8_C-12_Section M -Evaluation Factors for Award.pdf PDF
Attachment_12_C-12_Transition-QA_Incentive Plan.pdf PDF
Official RFP- FA813425RB002.pdf PDF
Attachment_11_C-12_Contract_Security_Classification_Specification_(DD254).pdf PDF
Attachment_2_C-12_Packaging_and_Transport.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract: FA8134-25-R-B002

C-12 Contractor Logistics Support Services

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

Page E-1

Contract: FA8134-25-R-B002

ATTACHMENT 3 – INSPECTION AND ACCEPTANCE

E-1. IN-PROCESS REVIEW

(a) Notwithstanding the right to inspection granted the Government under FAR 52.246-4, “Inspection of Service”, the Government may perform an in-process review on the aircraft being serviced. The in-process review is intended to ensure conformance to contractual technical requirements. The review may be conducted at various process stages, such as, but not limited to: following initial evaluation (inspection); following completion of conditional maintenance; during rigging of flight controls; or, prior to functional flight checks.

(b) Written findings resulting from the in-process review will be submitted to the Contracting Officer and the Program Manager’s (PM) Office. Any quality and/or process deficiencies noted will be documented and instruction for corrective action will be provided to the Contractor through the Contracting Officer.

E-2. CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984 252.246-7000 Material Inspection And Receiving Report MAR 2008

E-3. CLAUSES INCORPORATED BY FULL TEXT

52.246-11 Higher-Level Contract Quality Requirement (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring

1 ISO 9001 2015

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require—

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.

CUI

CUI

E-1. IN-PROCESS REVIEW
E-2. CLAUSES INCORPORATED BY REFERENCE