Attachment 27 - EZSource PresentPast Performance Relevancy Table .docx

DOCX document 14 KB Posted

Attached to
Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR Federal contract opportunity
Solicitation number
FA446021R0009
Issued by
Department of the Air Force Air Mobility Command

About this file

This document contains an attachment and solicitation for a Multiple Award Construction Contract at Little Rock Air Force Base in Arkansas. The indefinite-delivery indefinite-quantity contract will be awarded to multiple construction firms for sustainment, restoration, and modernization projects over the next five years. Work will include new construction, repair, and maintenance of facilities such as administrative buildings, industrial structures, maintenance shops, warehouses, communications installations, lodging, medical clinics, training buildings, roads, and utilities like fuel systems. Both design-bid-build and design-build project delivery methods will be utilized. Firms must demonstrate in-house design capabilities or ready access to designers. Individual task orders will define specific work requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR, newest first.
File Type Posted
Amend 05 -Solicitation Amendment - FA446021R00090005.pdf PDF
Amend 05 -Attachment 38 Questions and Answers after 3rd Site visit.pdf PDF
Amend 05 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Amend 05 -Attachment 13 - Statement of Work for MACC Rev 1.pdf PDF
Amend 05 -Updated Attachment 30 - Past Performance Package..docx DOCX document
Solicitation Amendment FA446021R00090004 SF 30.pdf PDF
Amend 04 -Attachment 36 - Site Visit Sign-in-Sheet 6-15-21.pdf PDF
Amend 04 -Attachment 37 - 2nd Site Visit Sign-in-Sheet 6-23-21.pdf PDF
Solicitation Amendment - FA446021R00090004.pdf PDF
Amend 04 -Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 32 Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Solicitation Amendment FA446021R00090003 SF 30.pdf PDF
Updated Attachment 30 - Past Performance Package.docx DOCX document
Attachment 34 - PPI Tool Download Instructions.pdf PDF
Solicitation Amendment FA446021R00090002 SF 30.pdf PDF
Solicitation Amendment FA446021R00090001 SF 30.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 Seed Project Amend 1.zip ZIP file
Amend 0001-Solicitation - FA446021R0009 Rel.pdf PDF
Attachment 28 - Financial Institution Reference Sheet.pdf PDF
Attachment 23 - 27 20 00 COMPUTER-TELEPHONE SYSTEMS May 2010.pdf PDF
Attachment 12 - Scheduled Government Furnished Property.pdf PDF
Attachment 1 - EMIS Instruction Guide.pdf PDF
Attachment 22 - 26 05 04 RACEWAYS.pdf PDF
Attachment 25 - 28 31 00 FIRE DETECTION AND ALARM SYSTEMS.pdf PDF
Attachment 24 - 27 51 16 BUILDING MASS NOTIFICATION SYSTEM.pdf PDF
Attachment 19 - 09 06 89 TYPICAL FINISH SCHEDULE.pdf PDF
Attachment 17 - 01 57 22 TREE PRESERVATION.pdf PDF
Attachment 14 - ETL 07-04 AIR FORCE CARPET STANDARD.pdf PDF
Attachment 13 - Statement of Work for MACC.pdf PDF
Attachment 11 - LRAFB Arch Design Guide Supplement 6 Aug 20.pdf PDF
Attachment 10 - LRAFB Arch Compatibility Guide.pdf PDF
Attachment 8 - LRAFB Telecommunications Systems Design.pdf PDF
Attachment 3 - CandD Report.pdf PDF
Attachment 2 - Environmental MOA.pdf PDF
Attachment 32 - Convert Mission Planning Cell B-380 (Seed Project).zip ZIP file
Attachment 29 - Maintainability Review Checklist FORM - Design Team.docx DOCX document
Attachment 26 - Design Review Checklist including constructability review 2013 07 30.docx DOCX document
Attachment 20 - 10 14 02 INTERIOR SIGNAGE.pdf PDF
Attachment 18 - 08 71 00 DOOR HARDWARE.pdf PDF
Attachment 16 - 00 00 02 LRAFB SPECIFICATIONS FORMAT STANDARD.pdf PDF
Attachment 9 - LRAFB Architectural Design Guide Supplement.pdf PDF
Attachment 7 - LRAFB Mechanical Design Criteria.pdf PDF
Attachment 30 - Past Performance Package.docx DOCX document
Attachment 33- SubKTR_Consent_Form.pdf PDF
Attachment 21 - 10 44 16 FIRE EXTINGUISHERS - CABINETS.pdf PDF
Attachment 15 - UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings.pdf PDF
Attachment 6 - LRAFB Electrical Design Standards.pdf PDF
Attachment 5 - LRAFB Information.pdf PDF
Attachment 4 - LRAFB Civil Design Criteria.pdf PDF
Released Solicitation - FA446021R0009.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ) Little Rock AFB, AR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA446021R0009

ATTACHMENT 27

EZSource PRESENT/PAST PERFORMANCE RELEVANCY TABLE (To be Completed by Offeror/Joint Venture Member/ and Critical Subcontractor) (Complete for each effort identified for evaluation in the PPI Tool)

Request the offeror/joint venture member/and Critical Subcontractor include if applicable complete a separate Relevancy Table for each effort identified for evaluation in the PPI Tool. This table, in addition to the information provided by the offeror in the PPI Tool, will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirements. Offerors/joint venture members shall only complete column three. Offerors’/joint venture members’ answers are applicable only to the efforts identified in the PPI Tool, not the offeror’s proposed solutions to the instant effort. Please be as specific as possible with the fill-in information provided.

If the contract being submitted is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. The Contract Number, Total Contract Dollar Value, Period of Performance, Quantities produced/repaired, Type and Complexity of Data Deliverable submitted here should be for the order or series of orders, the offeror has performed under this ordering type contractual vehicle.

If a series of orders is being submitted, the offeror shall include a list that includes the order numbers, each order’s Total Contract Dollar Value, each order’s Period of Performance, each order’s Quantity Produced/Repaired, and the Type and Complexity of Data Deliverables on each order. If the series of orders contains more than 5 orders, include this information on a separate attachment. See Section L-900 Paragraph L-2.3 Part II Paragraph 3 for more information on proposal submission and Section M-900 Paragraph M-3.2 for evaluation information.

Offeror Name:

Cage Code:

Contract Number:

(If submitting Ordering Type Contract: List the Basic Contract Number and each Order Number or Order Number within the a Series of Orders)

Program Title:

Contractor/Agency/Customer:

Original Total Contract Dollar Value: PCO Note: Tailor to match what you have identified for Programmatic/Logistical evaluation in Section M-900, Paragraph II.D.4 Note.

(If submitting Ordering Type Contract: List the Original Total Contract Dollar Value for each Order or Order within the Series of Orders)

Current Total Contract Dollar Value: PCO Note: Tailor to match what you have identified for Programmatic/Logistical evaluation in Section M-900, Paragraph II.D.4 Note.

(If submitting Ordering Type Contract: List the Current Total Contract Dollar Value for each Order or Order within the Series of Orders)

Period of Performance:

(If submitting Ordering Type Contract: List the Period of Performance for each Order or Order within the Series of Orders)

Quantities Produced/Repaired:

(If submitting Ordering Type Contract: List the Quantity Produced/Repaired for each Order or Order within the Series of Orders)

Type/Complexity of Data Deliverables:

If submitting Ordering Type Contract: List the Type/Complexity of Data Deliverables for each Order or Order within the Series of Orders)

Category
Example (PCO Note: provided as an example only – remove this column)
Fill in for the Proposed Effort (GOVT has completed this column)

(DO NOT CHANGE)

Fill in for the Effort Identified in Paragraph B Above (Offeror/joint venture member/critical subcontractor completes) The effort in Paragraph B required:

1. Nature of Business Area(s) Involved
Development, production, repair, services
2. Required Levels of Technology
State of the Art, COTS, Modified component
3. Materials and Production Processes
Forgings, weldings, etc.
4. Performance Location
Facility 1: address/prototype

Facility 2: production

5. Contract Type(s)
FFP, T&M, CPFF

6. Program Similarity

7. Program Complexity

8. Program Phase
Design, development, production
9. Extent of subcontractor involvement
Prototype, production, specific assembly/role

10. Other

Was this contract effort (as identified above) submitted as a past performance source of data for a previous name of installation procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.