Attachment-23 Vegetation Management Requirements.pdf

PDF 91 KB Posted

Attached to
Marine Helicopter Squadron One and Defense Information System Agency Base Operations Support (HMX-1 DISA BOS)
Solicitation number
FA7060-23-R-0010
Issued by

About this file

This document outlines vegetation management requirements for three pest groups. It specifies time periods contractors must respond in, time periods to obtain control of pests, and time periods to maintain control. Contractors must respond within seven days for aquatic plants and turf/ornamental beds, and five days for industrial/sidewalk areas. Control must be obtained within 21 days for aquatic plants and turf/ornamental beds, and 14 days for industrial/sidewalk areas. Control must be maintained for 60 days for aquatic plants and season long for turf/ornamental beds. The performance standard for industrial/sidewalk areas is to consult with the property protection and maintenance coordinator. The contractor must replace any vegetation killed or damaged by misapplication, drift, runoff or other off-target effects at no cost to the government. Permits may be required for aquatic plant control.

View the file

Other files

File Type Posted
Govt QA Responses 8 Nov 2023.pdf PDF
52.212-1 – Instructions to Offerors Attachments.docx DOCX document
Govt QA Responses 1 Nov 2023.pdf PDF
03. Blank Visitor Access Request (OPNAV5521-27) - Anacostia.pdf PDF
02. JBAB 5512 fillable.pdf PDF
01. Site Visit Registration Instructions.pdf PDF
Attachment-35 Recycling Reporting Form.pdf PDF
Attachment-1 Definitions and Acronyms.pdf PDF
Attachment-15e Custodial Inventory B 407.pdf PDF
Attachment-51 DD Form 1423 - CDRL_2 11.26.pdf PDF
Attachment-58 DD254_J2.pdf PDF
Attachment-50 DD Form 1423 - CDRL_1.pdf PDF
Attachment-11 ODS Requirements for Refrigerant Recycling.pdf PDF
Attachment-16 Pest Managment COLs.pdf PDF
Attachment-19 Nuisance Pest Requirements.pdf PDF
Attachment-10 Historical Service Call Workload..pdf PDF
Attachment-15d Custodial Inventory B 399.pdf PDF
Attachment-14a DISA Custodial Frequencies New.pdf PDF
Attachment-7 Facility Listing.pdf PDF
Attachment-4a Contractor Interface Mapping.pdf PDF
Attachment-20 Disease Vector or Health Pest Requirements.pdf PDF
Attachment-4 GFP Materials and Services.pdf PDF
Attachment-44b Inventory Fire Equipment DISA B93.pdf PDF
Attachment-22 Lawn Turf and Ornamental Plant Pest Requirements.pdf PDF
Attachment-14b DISA Medical Custodial Frequencies.pdf PDF
Attachment-31 Bird-Animal Aircraft Strike Hazards (BASH)Updatable.pdf PDF
Attachment-33 Grounds Inventory.pdf PDF
Attachment-48 DISA Building 93 _16 May.pdf PDF
Attachment-30 COLS Grounds Maintenance.pdf PDF
Attachment-15a Custodial Inventory B 91.pdf PDF
Attachment-46 DISA IMP _16 May.pdf PDF
Attachment-56 Services Wage Determination 30 June 2023.pdf PDF
Attachment-15c Custodial Inventory B 399 MC.pdf PDF
Attachment-44a Inventory Fire Equipment DISA 1_29 March.pdf PDF
Attachment-42 DISA Building 91_ 16 May.pdf PDF
Attachment-40 Pavement Clearing Inventory Schedule.pdf PDF
Attachment-18 Guidance for Contractors Work Plan.pdf PDF
Attachment-3 USAF MISHAP REPORT af711b.pdf PDF
Attachment-8 JBAB MAPs and Buildings Floor Plans.pdf PDF
Attachment-36 Semi Improved Areas Unimproved Areas And Storm Drainage Systems.pdf PDF
Attachment-3 Contractor Significant Incident Report (11th CES CSIR).pdf PDF
Attachment-37 COL for Street Sweeping.pdf PDF
Attachment-54 Local 99 CBA 2023-2026_Redacted.pdf PDF
Attachment-38 COL for Snow removal.pdf PDF
Attachment-43 DISA Building 399 _16 May.pdf PDF
Attachment-52 52.212-1 – Instructions to Offerors V3.pdf PDF
Attachment-13 Custodial COLS.pdf PDF
Attachment-5 CE Data Reporting.pdf PDF
Attachment-21 Structure Damaging Pest Requirements.pdf PDF
Attachment-47 18 Acres 16 May.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 23

VEGETATION MANAGEMENT REQUIREMENTS

Pest

Group

Number

Pest Group Name General Requirements

023 Aquatic Plant Control Control aquatic weeds in ditches, ponds, lakes, and other aquatic sites.

024 Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed

Control

Provide bare ground weed control in cracks in sidewalks and paved surfaces, at fence line locations, in transformer vaults, around fire hydrants, and other designated locations.

025 Turf and Ornamental Bed Weed

Control

Control weeds in turf areas and in ornamental plant beds.

PERFORMANCE STANDARDS

Pest

Group

Number

Pest Group Name

Time

Period to

Respond1

Time

Period to

Obtain

Control2

Time

Period to

Maintain

Control

Level of Control3 Notes

See Below

Aquatic Plant

Control 7 days 21 days 60 days 100% control 2, 3, 4

Industrial, Sidewalk, Substation, Vault, and Right-Of-Way

Weed Control

5 days 14 days Consult

PPMC

Consult PPMC 3

Turf and

Ornamental Bed

Weed Control

7 days 21 days Season long

More than 4 weed plants per ornamental bed or

1600 ft2 of turf are grounds for retreatment of that area at the

Contractor’s expense.

1, 2, 3

NOTES:

1 – Report conditions conducive to pest infestation to the CO and Integrated Pest Management Coordinator within one working day following survey.

2 - Post/Notify as required by applicable state/local regulations.

3 - Misapplication to target areas, or drift, runoff or other off-target effects that kill or damage any vegetation shall result in the Contractor replacing that vegetation at no charge to the Government.

4 - Permits may be required to perform this work (i.e., NPDES permit, FWS permit). The contractor shall obtain all permits and provide a copy to the CO prior to commencing control.

1 After notification 2 After first control action 3 Based on performance assessment (i.e. surveys, customer complaints)

File details come from the government source that posted it. Updated .