Attachment-31 Bird-Animal Aircraft Strike Hazards (BASH)Updatable.pdf

PDF 28 KB Posted

Attached to
Marine Helicopter Squadron One and Defense Information System Agency Base Operations Support (HMX-1 DISA BOS)
Solicitation number
FA7060-23-R-0010
Issued by

About this file

This document provides common output level standards for bird and animal aircraft strike hazard mitigation at military installations. It outlines four levels of requirements and mitigation projects in increasing priority zones surrounding airfields, with COL1 being the most stringent and COL4 the least. COL1 requires fulfilling all specifications in the installation's wildlife hazard mitigation plan for zones 1 through 4. COL2 requires most projects in zones 1 through 4 as specified. COL3 mandates all requirements in zones 1 and 2 along with prioritizing other projects according to hazard severity. Vegetation maintenance is also prioritized. COL4 only necessitates all zone 1 mitigation as specified.

View the file

Other files

File Type Posted
Govt QA Responses 8 Nov 2023.pdf PDF
52.212-1 – Instructions to Offerors Attachments.docx DOCX document
Govt QA Responses 1 Nov 2023.pdf PDF
03. Blank Visitor Access Request (OPNAV5521-27) - Anacostia.pdf PDF
02. JBAB 5512 fillable.pdf PDF
01. Site Visit Registration Instructions.pdf PDF
Attachment-35 Recycling Reporting Form.pdf PDF
Attachment-1 Definitions and Acronyms.pdf PDF
Attachment-15e Custodial Inventory B 407.pdf PDF
Attachment-51 DD Form 1423 - CDRL_2 11.26.pdf PDF
Attachment-58 DD254_J2.pdf PDF
Attachment-50 DD Form 1423 - CDRL_1.pdf PDF
Attachment-11 ODS Requirements for Refrigerant Recycling.pdf PDF
Attachment-16 Pest Managment COLs.pdf PDF
Attachment-19 Nuisance Pest Requirements.pdf PDF
Attachment-10 Historical Service Call Workload..pdf PDF
Attachment-15d Custodial Inventory B 399.pdf PDF
Attachment-14a DISA Custodial Frequencies New.pdf PDF
Attachment-7 Facility Listing.pdf PDF
Attachment-4a Contractor Interface Mapping.pdf PDF
Attachment-20 Disease Vector or Health Pest Requirements.pdf PDF
Attachment-4 GFP Materials and Services.pdf PDF
Attachment-44b Inventory Fire Equipment DISA B93.pdf PDF
Attachment-22 Lawn Turf and Ornamental Plant Pest Requirements.pdf PDF
Attachment-14b DISA Medical Custodial Frequencies.pdf PDF
Attachment-33 Grounds Inventory.pdf PDF
Attachment-48 DISA Building 93 _16 May.pdf PDF
Attachment-30 COLS Grounds Maintenance.pdf PDF
Attachment-15a Custodial Inventory B 91.pdf PDF
Attachment-46 DISA IMP _16 May.pdf PDF
Attachment-56 Services Wage Determination 30 June 2023.pdf PDF
Attachment-15c Custodial Inventory B 399 MC.pdf PDF
Attachment-44a Inventory Fire Equipment DISA 1_29 March.pdf PDF
Attachment-42 DISA Building 91_ 16 May.pdf PDF
Attachment-40 Pavement Clearing Inventory Schedule.pdf PDF
Attachment-18 Guidance for Contractors Work Plan.pdf PDF
Attachment-3 USAF MISHAP REPORT af711b.pdf PDF
Attachment-8 JBAB MAPs and Buildings Floor Plans.pdf PDF
Attachment-36 Semi Improved Areas Unimproved Areas And Storm Drainage Systems.pdf PDF
Attachment-3 Contractor Significant Incident Report (11th CES CSIR).pdf PDF
Attachment-37 COL for Street Sweeping.pdf PDF
Attachment-54 Local 99 CBA 2023-2026_Redacted.pdf PDF
Attachment-38 COL for Snow removal.pdf PDF
Attachment-43 DISA Building 399 _16 May.pdf PDF
Attachment-52 52.212-1 – Instructions to Offerors V3.pdf PDF
Attachment-13 Custodial COLS.pdf PDF
Attachment-5 CE Data Reporting.pdf PDF
Attachment-21 Structure Damaging Pest Requirements.pdf PDF
Attachment-47 18 Acres 16 May.pdf PDF
Attachment-14 DISA Custodial Frequencies.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 34

COMMON OUTPUT LEVEL STANDARDS FOR

BIRD/ANIMAL AIRCRAFT STRIKE HAZARD (BASH)

Installation-specific BASH requirements can be found in the Installation Wildlife Hazard Mitigation Plan

(WHMP). In the absence of a formal WHMP, a requirements document will be prepared by the Installation BASH working group (BWG) that outlines requirements in BASH mitigation zones (BMZ) 1 through 4 at each COL.

COL 1:

All requirements/projects in BMZ 1 through 4 as specified in the installation WHMP.

COL 2:

Most requirements/projects in BMZ 1 through 4 as specified in the installation WHMP. Installation BWG to prioritize vegetation clearance requirements for execution within available funding and accept limited risk.

COL 3:

All requirements /projects in BMZ 1 and all mowing, pesticide, and herbicide requirements in BMZ 2 as specified in the installation WHMP. Installation BWG to prioritize other vegetation clearance requirements/projects according to the most severe hazards to the airfield, and provide a five-year plan for project funding requirements in BMZ 2 and

3. Ditch and fence line clearance projects may be prioritized for initial cleaning; however, once complete they should be added to the annual vegetation maintenance requirements to reduce the potential for higher priced, non-routine mitigation actions. Installation and airfield fence line repair/maintenance is an ST responsibility.

COL 4:

All requirements/projects in BMZ 1 as specified in the installation WHMP. Installation BWG to prioritize vegetation clearance requirements in BMZ 2 for execution within available funding.

File details come from the government source that posted it. Updated .