Attachment-18 Guidance for Contractors Work Plan.pdf

PDF 59 KB Posted

Attached to
Marine Helicopter Squadron One and Defense Information System Agency Base Operations Support (HMX-1 DISA BOS)
Solicitation number
FA7060-23-R-0010
Issued by

About this file

This document provides guidance for a contractor's work plan for pest management services at a military installation. The work plan must be approved by the Contracting Officer and establish the contractor's strategy for conducting pest control in compliance with specifications. The plan should address continuous monitoring, pest response procedures, record keeping, warranties, education, and communication with installation personnel. The integrated pest management approach is required to use targeted methods including habitat modification, biological controls, mechanical controls, and judicious use of least hazardous pesticides. The plan must include labels, safety data sheets, and planned pesticide use sheets and comply with all applicable regulations and the installation's integrated pest management plan.

The related federal contract opportunity is solicitation number FA7060-23-R-0010 for base operations support services at Marine Helicopter Squadron One and the Defense Information System Agency. The opportunity is posted by the Department of the Air Force Headquarters District of Washington.

View the file

Other files

File Type Posted
Govt QA Responses 8 Nov 2023.pdf PDF
52.212-1 – Instructions to Offerors Attachments.docx DOCX document
Govt QA Responses 1 Nov 2023.pdf PDF
03. Blank Visitor Access Request (OPNAV5521-27) - Anacostia.pdf PDF
02. JBAB 5512 fillable.pdf PDF
01. Site Visit Registration Instructions.pdf PDF
Attachment-35 Recycling Reporting Form.pdf PDF
Attachment-1 Definitions and Acronyms.pdf PDF
Attachment-15e Custodial Inventory B 407.pdf PDF
Attachment-51 DD Form 1423 - CDRL_2 11.26.pdf PDF
Attachment-58 DD254_J2.pdf PDF
Attachment-50 DD Form 1423 - CDRL_1.pdf PDF
Attachment-11 ODS Requirements for Refrigerant Recycling.pdf PDF
Attachment-16 Pest Managment COLs.pdf PDF
Attachment-19 Nuisance Pest Requirements.pdf PDF
Attachment-10 Historical Service Call Workload..pdf PDF
Attachment-15d Custodial Inventory B 399.pdf PDF
Attachment-14a DISA Custodial Frequencies New.pdf PDF
Attachment-7 Facility Listing.pdf PDF
Attachment-4a Contractor Interface Mapping.pdf PDF
Attachment-20 Disease Vector or Health Pest Requirements.pdf PDF
Attachment-4 GFP Materials and Services.pdf PDF
Attachment-44b Inventory Fire Equipment DISA B93.pdf PDF
Attachment-22 Lawn Turf and Ornamental Plant Pest Requirements.pdf PDF
Attachment-14b DISA Medical Custodial Frequencies.pdf PDF
Attachment-31 Bird-Animal Aircraft Strike Hazards (BASH)Updatable.pdf PDF
Attachment-33 Grounds Inventory.pdf PDF
Attachment-48 DISA Building 93 _16 May.pdf PDF
Attachment-30 COLS Grounds Maintenance.pdf PDF
Attachment-15a Custodial Inventory B 91.pdf PDF
Attachment-46 DISA IMP _16 May.pdf PDF
Attachment-56 Services Wage Determination 30 June 2023.pdf PDF
Attachment-15c Custodial Inventory B 399 MC.pdf PDF
Attachment-44a Inventory Fire Equipment DISA 1_29 March.pdf PDF
Attachment-42 DISA Building 91_ 16 May.pdf PDF
Attachment-40 Pavement Clearing Inventory Schedule.pdf PDF
Attachment-3 USAF MISHAP REPORT af711b.pdf PDF
Attachment-8 JBAB MAPs and Buildings Floor Plans.pdf PDF
Attachment-36 Semi Improved Areas Unimproved Areas And Storm Drainage Systems.pdf PDF
Attachment-3 Contractor Significant Incident Report (11th CES CSIR).pdf PDF
Attachment-37 COL for Street Sweeping.pdf PDF
Attachment-54 Local 99 CBA 2023-2026_Redacted.pdf PDF
Attachment-38 COL for Snow removal.pdf PDF
Attachment-43 DISA Building 399 _16 May.pdf PDF
Attachment-52 52.212-1 – Instructions to Offerors V3.pdf PDF
Attachment-13 Custodial COLS.pdf PDF
Attachment-5 CE Data Reporting.pdf PDF
Attachment-21 Structure Damaging Pest Requirements.pdf PDF
Attachment-47 18 Acres 16 May.pdf PDF
Attachment-14 DISA Custodial Frequencies.pdf PDF
Show 40 more

Latest 50 of 83 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 18

GUIDANCE FOR CONTRACTOR'S WORK PLAN (CWP)

The CWP will require approval by the Contracting Officer (CO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds and consult with the Installation IPMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education, and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, SDS sheets, and

Planned Pesticide Use Sheets and comply with all applicable local, state, and Federal regulations, and the IPMP.

File details come from the government source that posted it. Updated .